language:
Find link is a tool written by Edward Betts.searching for Line length 544 found (6471 total)
alternate case: line length
Cpplint
(220 words)
[view diff]
exact match in snippet
view article
find links to article
can be fine-grained selected using the options --verbose and --filter. Line length rule can be configured with option --linelength and file extensions canQingdao–Rongcheng intercity railway (1,012 words) [view diff] exact match in snippet view article find links to article
travels along the Shandong Peninsula connecting to Qingdao and Rongcheng. Line length is 298.842 km (186 mi) (containing a total length of sidings, spurs andFathom (1,955 words) [view diff] no match in snippet view article find links to article
A fathom is a unit of length in the imperial and the U.S. customary systems equal to 6 feet (1.8288 m), used especially for measuring the depth of waterOde (1,288 words) [view diff] exact match in snippet view article find links to article
metrical conventions, meaning they are often irregular in their rhyme and line length. However, the strophe and antistrophe are typically identical in structureStrophe (721 words) [view diff] exact match in snippet view article find links to article
also mean a structural division of a poem containing stanzas of varying line length. Strophic poetry is to be contrasted with poems composed line-by-lineSeoul Subway Line 2 (934 words) [view diff] exact match in snippet view article find links to article
4 km (3.4 mi)) and the Sinjeong Branch (6.0 km (3.7 mi)) for a total line length of 60.2 km (37.4 mi). The Line 2 loop is the third longest subway loopLine (unit) (805 words) [view diff] no match in snippet view article
The line (abbreviated L or l or ‴ or lin.) was a small English unit of length, variously reckoned as 1⁄10, 1⁄12, 1⁄16, or 1⁄40 of an inch. It was not includedYuefu (925 words) [view diff] exact match in snippet view article find links to article
now lost folk ballad tunes; although, later, the five-character fixed-line length became common. However, as a term of classification yuefu has a certainTrams in Aachen (265 words) [view diff] exact match in snippet view article find links to article
maximum extent, its route length was 181.4 kilometres (112.7 mi) and its line length was 213.5 kilometres (132.7 mi). In 1914, it was the fourth largest tramwayTrams in Dresden (1,448 words) [view diff] exact match in snippet view article find links to article
As of 2008[update], the network comprised 12 tram lines, with a total line length of approximately 210 kilometres (130 mi) and a total route length ofClassical Chinese poetry forms (4,974 words) [view diff] exact match in snippet view article find links to article
poems: this includes such poetic characteristics as meter (such as, line length and number of lines), rhythm (for example, presence of caesuras, end-stoppingTree crown measurement (4,721 words) [view diff] exact match in snippet view article find links to article
limb where it emerges from the trunk are then measured. The straight line length of the limb from trunk to tip can then be calculated using the Law ofTrams in Wrocław (231 words) [view diff] exact match in snippet view article find links to article
consists of 23 lines with a total track length of 84 kilometres (52 mi) and line length of 258.2 kilometres (160.4 mi), six depots and 20 loops. Below is a tableKhurda Road–Bolangir line (1,222 words) [view diff] no match in snippet view article find links to article
and Purunapani to Jharmunda section of Khurdha Road Balangir new BG line. "Length of the track". Retrieved 6 September 2014. "Odisha to provide free landClerihew (1,111 words) [view diff] exact match in snippet view article find links to article
subject. The rhyme scheme is AABB, and the rhymes are often forced. The line length and metre are irregular. Bentley invented the clerihew in school andBe Un Limited (1,782 words) [view diff] exact match in snippet view article find links to article
16 Mbit/s downstream and 1.9 Mbit/s upstream, subject to Annex M enablement, line length and quality, making BE's network the fastest mainstream, and first ADSL2+MIRC scripting language (1,476 words) [view diff] exact match in snippet view article find links to article
of plain text. This limit is imposed by mIRC's scripting parser's own line length limitation (unless assigning a binary variable) Globally accessible viaWenzhou–Fuzhou railway (527 words) [view diff] exact match in snippet view article find links to article
Depot(s) Fuzhou History Opened September 28, 2009 (2009-09-28) Technical Line length 298.1 km (185 mi) Number of tracks 2 (Double-track) Track gauge 1,435 mmOpenLisp (1,320 words) [view diff] no match in snippet view article find links to article
OpenLisp is a programming language in the Lisp family developed by Christian Jullien from Eligis. It conforms to the international standard for ISLISPBeijing–Tangshan intercity railway (428 words) [view diff] exact match in snippet view article find links to article
District. Finally, it will terminate at Tangshan railway station. Total line length of will be approximately 163 km (101 mi), with a total of 8 stationsKeifuku Electric Railroad (670 words) [view diff] exact match in snippet view article find links to article
(叡山ロープウェイ, Eizan Rōpuwei) (Ja) is an aerial tramway in Sakyo-ku, Kyoto. The line length is 0.5 km (0.31 mi). The cable and ropeway lines are for visitors toTransilien Paris-Nord (686 words) [view diff] exact match in snippet view article find links to article
sections) 1 January 2001 (2001-01-01) (recreated as Line H) Technical Line length 138 km (86 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeNewline (4,412 words) [view diff] exact match in snippet view article find links to article
outside world, lines shorter than the line length had to be padded with spaces, while lines longer than the line length had to be truncated. This mimickedQuoted-printable (977 words) [view diff] exact match in snippet view article find links to article
sign = as an escape character. It also limits line length to 76, as some software has limits on line length. MIME defines mechanisms for sending other kindsBarrage (artillery) (4,643 words) [view diff] exact match in snippet view article
impact points along the line may be 20 to 30 yards apart, with the total line length of the barrage zone anything from a few hundred to several thousand yardsTransilien Paris-Saint-Lazare (920 words) [view diff] exact match in snippet view article find links to article
sections) 31 December 2004 (2004-12-31) (recreated as Line J) Technical Line length 256 km (159 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeKabe Line (984 words) [view diff] exact match in snippet view article find links to article
Hiroshima. Operator: West Japan Railway Company (Class-1 railroad) Official line length: 14 kilometres (8.7 mi) Gauge: 1,067 mm (3 ft 6 in) Double track: noneGuntakal–Nandyal section (78 words) [view diff] exact match in snippet view article find links to article
Termini Guntakal Nandyal Service Operator(s) South Central Railway Technical Line length 144.30 km (89.66 mi) Track gauge 5 ft 6 in (1,676 mm) broad gaugeDüsseldorf Stadtbahn (1,228 words) [view diff] exact match in snippet view article find links to article
21, 2016, the light rail network grew to a route length of 85.5 and a line length of 188.2 kilometers; Rheinbahn's 2020 annual report lists the route lengthRS-422 (1,277 words) [view diff] exact match in snippet view article find links to article
standard, but is included for information purposes only.) Limitations on line length and data rate vary with the parameters of the cable length, balance,Guntur–Tenali section (160 words) [view diff] exact match in snippet view article find links to article
Service Operator(s) South Coast Railway History Opened 1916 Technical Line length 25.47 km (15.83 mi) Number of tracks 2 Track gauge 5 ft 6 in (1,676 mm)Trams in Palermo (142 words) [view diff] exact match in snippet view article find links to article
Stazione Centrale Roccella Stations 15 Color on map magenta History Current route since December 30, 2015 (2015-12-30) Technical Line length 5.5 km (3.4 mi)Han poetry (2,979 words) [view diff] exact match in snippet view article find links to article
shi poetry, as the later development of the yuehfu into regular, fixed-line length forms makes it difficult to distinguish in form from the shi form ofTel Aviv Light Rail (1,953 words) [view diff] case mismatch in snippet view article find links to article
Line Length No. of stations Status Opening Passenger forecast Primary municipalities Terminals Rolling Stock Red Line 24 km (15 mi) (12 km (7.5 mi) underground)Gothenburg tram network (1,064 words) [view diff] exact match in snippet view article find links to article
which serve twelve day-time and five night-time lines with a combined line length of 190 km. These figures are expected to increase when the second stageSamalkot–Kakinada Port branch line (138 words) [view diff] exact match in snippet view article find links to article
Samalkot Kakinada Port Service Operator(s) South Coast Railway Technical Line length 15.60 km (9.69 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationLine 29 (Shenzhen Metro) (142 words) [view diff] exact match in snippet view article
Shenzhen Metro Services 1 Operator(s) SZMC (Shenzhen Metro Group) Technical Line length 11.3km (Phase 1) Character Underground Operating speed 80km/hLine 21 (Shenzhen Metro) (167 words) [view diff] exact match in snippet view article
Shenzhen Metro Services 1 Operator(s) SZMC (Shenzhen Metro Group) Technical Line length 12.5km (Phase 1) Character Underground Operating speed 120km/hLine 25 (Shenzhen Metro) (137 words) [view diff] exact match in snippet view article
Shenzhen Metro Services 1 Operator(s) SZMC (Shenzhen Metro Group) Technical Line length 16.2km (Phase 1) Character Underground Operating speed 80km/hPatna–Sonepur–Hajipur section (81 words) [view diff] exact match in snippet view article find links to article
Operator(s) East Central Railway History Opened 3 February 2016 Technical Line length 21 km (13 mi) Number of tracks 2 Track gauge 5 ft 6 in (1,676 mm) broadQingdao–Yancheng railway (152 words) [view diff] exact match in snippet view article find links to article
China Railway Shanghai Group History Opened 26 December 2018 Technical Line length 429 km (267 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speedNandyal–Yerraguntla section (219 words) [view diff] exact match in snippet view article find links to article
Operator(s) South Central Railway History Opened 23 August 2016 Technical Line length 123 km (76 mi) Number of tracks 1 Track gauge 5 ft 6 in (1,676 mm) broadDresdner Verkehrsbetriebe (2,156 words) [view diff] exact match in snippet view article find links to article
operates the Dresden tram network comprising 12 tram lines, with a total line length of approximately 210 kilometres (130.5 mi) and a total route length ofHonam Line (678 words) [view diff] exact match in snippet view article find links to article
of Korea Train Express (KTX) services on April 1, 2004. The present line length from Daejeon to Mokpo is 252.5 km (156.9 mi), the line distance fromLlobregat–Anoia Line (1,835 words) [view diff] exact match in snippet view article find links to article
formed. It also includes several freight branches, accounting for a total line length of 138 kilometres (86 mi) and 41 passenger stations. Barcelona MetroLine 19 (Shenzhen Metro) (158 words) [view diff] exact match in snippet view article
Group) History Planned opening October 2028; 4 years' time (2028-10) Technical Line length 12.5km (Phase 1) Character Underground Operating speed 80km/hKharagpur–Bankura–Adra line (210 words) [view diff] exact match in snippet view article find links to article
Electrified Operator(s) South Eastern Railway History Opened 1901 Technical Line length 168 km (104 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationSection restoration (1,187 words) [view diff] exact match in snippet view article find links to article
started. This method does not guarantee that area is conserved, only line length. The technique was applied to areas of extensional tectonics initiallyLine 27 (Shenzhen Metro) (142 words) [view diff] exact match in snippet view article
Shenzhen Metro Services 2 Operator(s) SZMC (Shenzhen Metro Group) Technical Line length 25.6km (Phase 1) Character Underground Operating speed 80km/hLine 18 (Shenzhen Metro) (164 words) [view diff] exact match in snippet view article
Shenzhen Metro Services 1 Operator(s) SZMC (Shenzhen Metro Group) Technical Line length 18.7 km (11.6 mi) (Phase 1) Character Underground Operating speed 120 km/hLine 15 (Shenzhen Metro) (164 words) [view diff] exact match in snippet view article
Metro Group) History Planned opening December 2028; 4 years' time (2028-12) Technical Line length 32.2km Character Underground Operating speed 80km/hLine 17 (Shenzhen Metro) (149 words) [view diff] exact match in snippet view article
SZMC (Shenzhen Metro Group) History Planned opening June 2029; 4 years' time (2029-06) Technical Line length 18.8 km (Phase 1) Character UndergroundTenali–Repalle branch line (207 words) [view diff] exact match in snippet view article find links to article
Coast Railway zone History Opened 1916; 108 years ago (1916) Technical Line length 32.10 km (19.95 mi) Number of tracks 1 Character At-grade street runningLRT Line 6 (2,484 words) [view diff] exact match in snippet view article find links to article
developed by the Japanese firm as a separate line. Altogether, the combined line length is at approximately 86 km (53 mi) with a combined track length of aroundGuntur–Krishna Canal section (103 words) [view diff] exact match in snippet view article find links to article
South Coast Railway History Opened 1966; 58 years ago (1966) Technical Line length 25.36 km (15.76 mi) Number of tracks 2 Track gauge 5 ft 6 in (1,676 mm)Qianjiang–Changde railway (150 words) [view diff] exact match in snippet view article find links to article
China Railway Guangzhou Group History Opened 26 December 2019 Technical Line length 336 km (209 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge ElectrificationNokogiriyama Ropeway (106 words) [view diff] exact match in snippet view article find links to article
capacity 41 Passengers per cabin Trip duration 3 min Technical features Line length 680 m (2,231 ft) No. of cables 3 Vertical Interval 223 m (732 ft) MaximumLine 22 (Shenzhen Metro) (195 words) [view diff] exact match in snippet view article
Group) History Planned opening March 2029; 4 years' time (2029-03) Technical Line length 34.2km (Phase 1) Character Underground Operating speed 100km/hGudivada–Machilipatnam branch line (148 words) [view diff] exact match in snippet view article find links to article
Gudivada Machilipatnam Service Operator(s) South Coast Railway Technical Line length 36.70 km (22.80 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationFuzhou–Pingtan railway (161 words) [view diff] exact match in snippet view article find links to article
6 Service Type Heavy rail History Opened 26 December 2020 Technical Line length 83.43 km (52 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeQuatrain (826 words) [view diff] exact match in snippet view article find links to article
poetry and Japanese poetry. This type of quatrain uses a seven-character line length. Both rhyme and rhythm are key elements, although the former is not restrictedJapan National Route 207 (232 words) [view diff] no match in snippet view article find links to article
that portion of the road runs mostly parallel to the Nagasaki Main Line. Length: 112.3 km (69.8 mi) Origin: Saga (junction with Route 264) Terminus:Changchun–Baicheng railway (202 words) [view diff] exact match in snippet view article find links to article
Baicheng Stations 14 Service Type Heavy rail History Opened 1934 Technical Line length 325.7 km (202 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeAkechidaira Ropeway (152 words) [view diff] exact match in snippet view article find links to article
Passengers per cabin, 2 cabins Trip duration 3 min Technical features Line length 300 m (984 ft) No. of cables 3 Operating speed 2.5 m/s Vertical IntervalNallapadu–Nandyal section (321 words) [view diff] exact match in snippet view article find links to article
Nallapadu Nandyal Service Operator(s) South Central Railway Technical Line length 256.91 km (159.64 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationTraction power network (1,768 words) [view diff] exact match in snippet view article find links to article
usually laid parallel to the railway line, in order to allow a shorter line length and to avoid unnecessary influences to the electrical system near theYokohama Air Cabin (132 words) [view diff] exact match in snippet view article find links to article
type Mono-cable gondola detachable Manufactured by Nippon Cable, Japan Line length 629 m (2,064 ft) No. of support towers 5 No. of cables 1 Operating speedYancheng–Nantong high-speed railway (118 words) [view diff] exact match in snippet view article find links to article
China Railway Shanghai Group History Opened 30 December 2020 Technical Line length 156.6 km (97 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speedDavao People Mover (391 words) [view diff] exact match in snippet view article find links to article
Type Straddle-beam monorail Operator(s) Udenna Corporation Daily ridership 100,000 (projected) Technical Line length 13 km (8.1 mi) Number of tracks 2Indianapolis Motor Speedway (10,005 words) [view diff] no match in snippet view article find links to article
Rectangular Oval Track (1909–present) Surface Asphalt and brick (start-finish line) Length 2.500 miles (4.023 km) Turns 4 Banking Turns: 9.2° Straights: 0° RaceDongbuk Line (38 words) [view diff] exact match in snippet view article find links to article
Stations 16 Service Operator(s) Dongbuk LRT Co., Ltd. Depot(s) Buramsan Train Depot History Planned opening July 2026 Technical Line length 13.4 km (8.3 mi)Gudur–Renigunta section (182 words) [view diff] exact match in snippet view article find links to article
Central Railway zone History Opened 1957; 67 years ago (1957) Technical Line length 134.78 km (83.75 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in)Guangzhou–Kunming high-speed railway (79 words) [view diff] exact match in snippet view article find links to article
Operator(s) China Railway High-speed History Opened 28 December 2016 Technical Line length 1285km Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge ElectrificationJacksonville Transportation Authority (2,999 words) [view diff] exact match in snippet view article find links to article
appid=9813461a3590462892bcd0cc13d26161 Service Type Commuter rail Technical Line length 91 mi (146 km) Character At-grade Track gauge 4 ft 8+1⁄2 in (1,435 mm)Linotype machine (4,630 words) [view diff] exact match in snippet view article find links to article
disk. The mold disk has rectangular openings which correspond to the line length and point thickness of the slugs (cast lines) to be made. Mold linersKaeng Khoi Line (107 words) [view diff] exact match in snippet view article find links to article
Service Type Commuter rail System Greater Bangkok Commuter rail Technical Line length 125.10 km (77.73 mi) Track gauge 1,000 mm (3 ft 3+3⁄8 in) metre gaugeSubcyclotosaurus (478 words) [view diff] exact match in snippet view article find links to article
others of Cyclotosaurus, the preorbital length being 66% of the total mid-line length. The extremes amongst Cyclotosaurus being 61% in the small CyclotosaurusHighclere, Kingsclere and Basingstoke Light Railway (313 words) [view diff] exact match in snippet view article find links to article
Proposed (abandoned) Locale Hampshire Termini Highclere Basingstoke Stations 8 Service Type Light rail Technical Line length 12 miles (19 km) (approximate)Masada cableway (169 words) [view diff] exact match in snippet view article find links to article
Israel Nature and Parks Authority Technical features Aerial lift type Aerial tramway Line length 0.9 km Operating speed 28.8 km/h Notes elevation 33 mAmritsar–Khem Karan line (500 words) [view diff] exact match in snippet view article find links to article
History Opened 4 April 1910 (Main line) 2011 (Beas branch) Technical Line length Main line 77 km (48 mi) Tarn Taran–Beas branch line 49 km (30 mi) TrackBeijing–Xiong'an intercity railway (310 words) [view diff] exact match in snippet view article find links to article
History Opened September 26, 2019; 4 years ago (2019-09-26) Technical Line length 92.03 km (57.18 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeGold Line 8 (Mumbai Metro) (102 words) [view diff] exact match in snippet view article
Express Train System Mumbai Metro Operator(s) MMRDA, CIDCO Technical Line length 35 km (22 mi) Character Elevated Track gauge 1,435 mm (4 ft 8+1⁄2 in)Grey Line (Delhi Metro) (441 words) [view diff] exact match in snippet view article
Najafgarh) 18 September 2021 (Najafgarh – Dhansa Bus Stand) Technical Line length 5.19 kilometers (3.22 mi) Character Underground & Elevated Track gaugeOver (cricket) (1,489 words) [view diff] no match in snippet view article
player out. For example, they may bowl the first few balls with the same line, length, or spin. The bowler intends to tempt the batting player into scoringKada Line (86 words) [view diff] exact match in snippet view article find links to article
History Opened 16 June 1912 Closed 1966 (Kitajima Branch Line) Technical Line length 9.6 km (6.0 mi) Number of tracks Single Track gauge 1,067 mm (3 ft 6 in)COMMAND.COM (2,829 words) [view diff] exact match in snippet view article find links to article
Generally, the command line length in interactive mode is limited to 126 characters. In MS-DOS 6.22, the command line length in interactive mode is limitedTianjin–Qinhuangdao high-speed railway (62 words) [view diff] exact match in snippet view article find links to article
History Opened December 1, 2013; 10 years ago (2013-12-01) Technical Line length 261.2 km (162 mi) (main line) Number of tracks 2 (Double-track) TrackShanghai–Suzhou–Huzhou high-speed railway (138 words) [view diff] exact match in snippet view article find links to article
Stations 8 Service Operator(s) China Railway Shanghai Group Technical Line length 163.8 km (101.8 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speedLine 32 (Shenzhen Metro) (583 words) [view diff] exact match in snippet view article
System Shenzhen Metro Services 1 Operator(s) SZMC (Shenzhen Metro Group) Technical Line length Phase 1: 9.5km Character Underground Operating speed 80km/hHaizhu Tram (156 words) [view diff] exact match in snippet view article find links to article
History Opened 31 December 2014; 9 years ago (2014-12-31) Technical Line length 7.7 km (4.78 mi) Number of tracks 2 Character At-grade Track gauge 1Echigo Tokimeki Railway (1,146 words) [view diff] exact match in snippet view article find links to article
series EMUs E653-1100 series EMUs History Opened 15 August 1886 Technical Line length 37.7 km (23.4 mi) Number of tracks Single track Track gauge 1,067 mmLine D4 (Moscow Central Diameters) (98 words) [view diff] exact match in snippet view article
Rolling stock EG2Tv, EP2D, EP2DM History Opened 9 September 2023 Technical Line length 86 km (53 mi) Track gauge 1,520 mm (4 ft 11+27⁄32 in) Russian gauge ElectrificationPatna–Gaya line (254 words) [view diff] exact match in snippet view article find links to article
Service Operator(s) East Central Railway History Opened 1900 Technical Line length 92 km (57 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationMysore–Chamarajanagar branch line (183 words) [view diff] exact match in snippet view article find links to article
History Opened 12 November 2008; 15 years ago (2008-11-12) Technical Line length 61 kilometres (38 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in)Bandel–Katwa line (224 words) [view diff] exact match in snippet view article find links to article
train 13 Total 33 History Opened 1913; 111 years ago (1913) Technical Line length 104 km (65 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in) broadHaizhu Tram (156 words) [view diff] exact match in snippet view article find links to article
History Opened 31 December 2014; 9 years ago (2014-12-31) Technical Line length 7.7 km (4.78 mi) Number of tracks 2 Character At-grade Track gauge 1Congo–Ocean Railway (1,194 words) [view diff] exact match in snippet view article find links to article
System Non-Electrified Services Via Dolisie History Opened 1934 Technical Line length 512 km (318 mi) Number of tracks 1 Character At-grade Track gauge 1,067 mmMysore–Chamarajanagar branch line (183 words) [view diff] exact match in snippet view article find links to article
History Opened 12 November 2008; 15 years ago (2008-11-12) Technical Line length 61 kilometres (38 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in)Opisometer (274 words) [view diff] exact match in snippet view article find links to article
handle while this is done, the length of the line can be ascertained: line length = wheel circumference × teeth counted/teeth on wheel. In more sophisticatedBandel–Katwa line (224 words) [view diff] exact match in snippet view article find links to article
train 13 Total 33 History Opened 1913; 111 years ago (1913) Technical Line length 104 km (65 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in) broadMokama–Barauni section (210 words) [view diff] exact match in snippet view article find links to article
Type Electrified System Broad gauge Operator(s) East Central Railway Technical Line length 21 km (13 mi) Track gauge 5 ft 6 in (1,676 mm) broad gaugeYoshino Line (235 words) [view diff] exact match in snippet view article find links to article
ago (1912-10-25) Last extension 25 March 1928; 96 years ago (1928-03-25) Technical Line length 25.2 km (15.7 mi) Number of tracks Single-track Track gauge 1,067 mmXiangyang–Jingmen high-speed railway (121 words) [view diff] exact match in snippet view article find links to article
East Jingmen West Stations 4 History Planned opening 2026 Technical Line length 116.7 km (72.5 mi) Number of tracks 2 Operating speed 350 km/h (220 mph)Myeonmok Line (45 words) [view diff] exact match in snippet view article find links to article
Proposed Termini Cheongnyangni Sinnae Stations 12 Service Depot(s) Sinnae Train Depot History Planned opening 2028 Technical Line length 9.05 km (5.62 mi)Shenyang–Dandong intercity railway (990 words) [view diff] exact match in snippet view article find links to article
111 ft) long. Bridges and tunnels together account for 80.5% of the line length. In early 2008 – The Liaoning provincial government put forward to strengthenSeibu Toshima Line (219 words) [view diff] exact match in snippet view article find links to article
Nerima Toshimaen Stations 2 History Opened 15 October 1927 Technical Line length 1.0 km (0.6 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in) ElectrificationWirye Line (129 words) [view diff] exact match in snippet view article find links to article
(慰禮線) Status Approved Termini Macheon Bokjeong / Namwirye Stations 12 History Planned opening September 2025 Technical Line length 5.44 km (3.38 mi)Line D3 (Moscow Central Diameters) (79 words) [view diff] exact match in snippet view article
Passenger Company Rolling stock EG2Tv History Opened 17 August 2023 Technical Line length 88 km (55 mi) Track gauge 1,520 mm (4 ft 11+27⁄32 in) Russian gaugeGrand Paris Express (2,625 words) [view diff] exact match in snippet view article find links to article
Rolling stock Alstom Metropolis MR6V History Opened 2025–2030 Technical Line length 75 km (47 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge ConductionLopburi Line (121 words) [view diff] exact match in snippet view article find links to article
Service Type Commuter rail System Greater Bangkok Commuter rail Technical Line length 132.81 km (82.52 mi) Track gauge 1,000 mm (3 ft 3+3⁄8 in) metre gaugeKeiō Keibajō Line (158 words) [view diff] exact match in snippet view article find links to article
None History Opened 29 April 1955; 69 years ago (1955-04-29) Technical Line length 900 m (3,000 ft; 0.56 mi) Number of tracks Double-track Track gauge 1Motumarri–Vishnupuram section (276 words) [view diff] exact match in snippet view article find links to article
Operator(s) South Central Railway zone History Opened 2019 Technical Line length 89 km (55 mi) Number of tracks 1 Track gauge 5 ft 6 in (1,676 mm) broadTaiyuan–Jiaozuo high-speed railway (186 words) [view diff] exact match in snippet view article find links to article
Railway High-speed History Opened 12 December 2020 (2020-12-12) Technical Line length 428.9 km (267 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speedTanagawa Line (155 words) [view diff] exact match in snippet view article find links to article
ago (1944-06-01) Closed 1966; 58 years ago (1966) (Ferry Line To Sumoto) Technical Line length 2.6 km (1.6 mi) Number of tracks Single Track gauge 1,067 mm (3 ft 6 in)Pagidipalli–Nallapadu section (233 words) [view diff] exact match in snippet view article find links to article
Central Railway zone History Opened 1930; 94 years ago (1930) Technical Line length 238.49 km (148 mi) Track length 130 km (81 mi) Number of tracks 1 (doublingWirye–Sinsa Line (70 words) [view diff] exact match in snippet view article find links to article
Native name 서울 경전철 위례신사선 (慰禮新沙線) Status Planned Termini Wirye Centre Sinsa Stations 11 History Planned opening 2024 Technical Line length 14.7 km (9.1 mi)HMS Devonshire (1745) (92 words) [view diff] case mismatch in snippet view article
characteristics Class and type 1741 proposals 66-gun third rate ship of the line Length 161 ft (49.1 m) (gundeck) Beam 46 ft (14.0 m) Depth of hold 19 ft 4 inAndal–Sainthia branch line (242 words) [view diff] exact match in snippet view article find links to article
Broad gauge Operator(s) Eastern Railway History Opened 1913 Technical Line length 73 km (45 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationElgeseter Line (194 words) [view diff] exact match in snippet view article find links to article
Sporvei Trondheim Trafikkselskap History Opened 1913 Closed 1983 Technical Line length 2.5 km Track length 5.0 km Number of tracks Double Track gauge 1,000 mmSeibu Chichibu Line (312 words) [view diff] exact match in snippet view article find links to article
History Opened 14 October 1969; 54 years ago (1969-10-14) Technical Line length 19.0 km (11.8 mi) Number of tracks Single-track Track gauge 1,067 mmLine 11 (Mumbai Metro) (186 words) [view diff] exact match in snippet view article
Mumbai Metro Operator(s) Mumbai Metro Depot(s) Owale & Gaimukh Technical Line length 12.68 km (7.88 mi) Number of tracks 2 Character 2 Elevated , 8 UndergroundChengdu–Pujiang intercity railway (294 words) [view diff] exact match in snippet view article find links to article
Type Higher-speed rail Operator(s) China Railway High-speed Technical Line length 99 km (62 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge OperatingBilaspur–Katni line (264 words) [view diff] exact match in snippet view article find links to article
WAG-5 and WAG-7, WAP-4, WAP-5, WAP-7 History Opened 1891 Technical Line length Main Line 318.6 km (198 mi) Branch line: Anuppur Junction–Chirimiri lineGandhidham–Ahmedabad main line (326 words) [view diff] exact match in snippet view article find links to article
Viramgam Service Operator(s) Western Railway History Opened 1969 Technical Line length 299.2 km (186 mi) Number of tracks 1 Track gauge 5 ft 6 in (1,676 mm)Ahmadpur–Katwa line (320 words) [view diff] exact match in snippet view article find links to article
September 1917 (NG) 24 May 2018 (BG) Closed 14 January 2013 (NG) Technical Line length 52 km (32 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge Old gaugeGuiyang railway loop line (234 words) [view diff] exact match in snippet view article find links to article
Chengdu Group History Opened March 30, 2022 (Passenger service) Technical Line length 113 km (70 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge OperatingTrams in Mestre (201 words) [view diff] exact match in snippet view article find links to article
Sernaglia December 19, 2010 (2010-12-19) Mestre Centro – Venezia–Piazzale Roma September 15, 2015 (2015-09-15) Technical Line length 13.45 km (8.36 mi)Kent Coast line (442 words) [view diff] exact match in snippet view article find links to article
only) Class 466 (peak hours and a few summer services only) Technical Line length 16mi 64ch (27.03 km) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeKeisei Chihara Line (317 words) [view diff] exact match in snippet view article find links to article
Prefecture Termini Chiba-Chūō Chiharadai Stations 6 History Opened April 1, 1992 Technical Line length 10.9 km (6.8 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in)Chongqing–Wanzhou high-speed railway (165 words) [view diff] exact match in snippet view article find links to article
Type High-speed rail Operator(s) China Railway Chengdu Group Technical Line length 291.3 km (181 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeNanchang–Jiujiang high-speed railway (190 words) [view diff] exact match in snippet view article find links to article
Stations 5 Service Operator(s) China Railway Nanchang Group Technical Line length 134.4 km (83.5 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speedKeisei Higashi-Narita Line (175 words) [view diff] exact match in snippet view article find links to article
Prefecture Termini Keisei Narita Higashi-Narita Stations 2 Technical Line length 7.1 km (4.4 mi) Number of tracks Double-track Track gauge 1,435 mm (4 ft 8+1⁄2 in)Line 13 (Shanghai Metro) (839 words) [view diff] exact match in snippet view article
at Zhangjiang Jidian Port (area), mainly along Zhangdong Road, with a line length of about 4.1 kilometres (2.5 mi). Both are underground lines with 2 stationsShri Ganganagar–Sadulpur line (473 words) [view diff] exact match in snippet view article find links to article
Operator(s) North Western Railway History Opened 13 November 1930 Technical Line length Main line 244 km (152 mi) Track gauge 1,676 mm (5 ft 6 in) Broad GaugeMitake Tozan Railway (384 words) [view diff] exact match in snippet view article find links to article
(elevation: 407.6m) Mitakesan Station (elevation: 831.0m) Stations 2 Service Type Funicular Technical Line length 1.0 km (0.62 mi) Track gauge 1,049mmBakhtiyarpur–Tilaiya line (487 words) [view diff] exact match in snippet view article find links to article
Operator(s) East Central Railway History Opened 1962 / 2010 Technical Line length 100 km (62 mi) Number of tracks 1 Track gauge 5 ft 6 in (1,676 mm) broad4 ft 6 in gauge railway (1,213 words) [view diff] no match in snippet view article find links to article
instead. The Toden Arakawa Line. Length: 12.2 km (7.6 mi). Only surviving line of Tokyo municipal tram. The Tōkyū Setagaya Line. Length: 5.0 km (3.1 mi). AnotherGuiyang–Kaiyang intercity railway (226 words) [view diff] exact match in snippet view article find links to article
Operator(s) China Railway Chengdu Group History Opened May 1, 2015 Technical Line length 62 km (39 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge OperatingLine 12 (Mumbai Metro) (204 words) [view diff] exact match in snippet view article
19 Service Type Metro System Mumbai Metro Operator(s) MMRDA Technical Line length 22.17 km (13.78 mi) Number of tracks 2 Character Elevated Track gaugeErode–Tiruchirappalli line (257 words) [view diff] exact match in snippet view article find links to article
Southern Railway zone Depot(s) Erode (ED) Golden Rock (GOC) Technical Line length 141 kilometres (88 mi) Number of tracks 1 Track gauge Broad Gauge - 1Sub-Central line (379 words) [view diff] exact match in snippet view article find links to article
Rolling stock CRH6 History Opened December 31, 2017; 6 years ago (2017-12-31) Technical Line length 63.7 km (39.6 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in)Nankai Main Line (1,191 words) [view diff] exact match in snippet view article find links to article
of waves, or distinguished with blue from conifer or green Kōya Line. Line length: 64.2 km (39.9 mi) Track: quadruple from Namba to Suminoe (to Kishinosato-TamadePower Grid Bangladesh (554 words) [view diff] no match in snippet view article find links to article
Power Grid Bangladesh PLC abbreviated as Power Grid is the sole organization of Government of Bangladesh entrusted with transmission of power throughoutLaksar–Dehradun line (568 words) [view diff] exact match in snippet view article find links to article
13 March 1900 (Main line) 2 April 1927 (Rishikesh branch) Technical Line length Main line 79 km (49 mi) Raiwala–Rishikesh branch line 12 km (7 mi) TrackManamadurai–Virudhunagar line (512 words) [view diff] exact match in snippet view article find links to article
2 May 1964; 60 years ago (1964-05-02) Reopened 21 June 2013 Technical Line length 67 km (42 mi) Track gauge 1,676 mm (5 ft 6 in) Old gauge Meter GaugePower Grid Bangladesh (554 words) [view diff] no match in snippet view article find links to article
Power Grid Bangladesh PLC abbreviated as Power Grid is the sole organization of Government of Bangladesh entrusted with transmission of power throughoutSeobu Line (47 words) [view diff] exact match in snippet view article find links to article
서부선 (西部線) Status Planned Termini Saejeol Seoul National University Stations 16 History Planned opening 2026 Technical Line length 16.23 km (10.08 mi)Underarm bowling (2,139 words) [view diff] no match in snippet view article find links to article
flight of the ball and experimented for long hours with variations of line, length and speed of delivery until he had mastered the art of pitching. OtherFuzhou–Xiamen high-speed railway (382 words) [view diff] exact match in snippet view article find links to article
China Railway Nanchang Group History Opened 28 September 2023 Technical Line length 284 km (176 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speedLine 12 (Mumbai Metro) (204 words) [view diff] exact match in snippet view article
19 Service Type Metro System Mumbai Metro Operator(s) MMRDA Technical Line length 22.17 km (13.78 mi) Number of tracks 2 Character Elevated Track gaugeLine 6 (Shenzhen Metro) (1,603 words) [view diff] exact match in snippet view article
proposed to start from Bao'an International Airport to Songgang, with a line length of about 15 km (9.3 mi). It was envisioned as an extension of the stillNankai Main Line (1,191 words) [view diff] exact match in snippet view article find links to article
of waves, or distinguished with blue from conifer or green Kōya Line. Line length: 64.2 km (39.9 mi) Track: quadruple from Namba to Suminoe (to Kishinosato-TamadeChongqing–Wanzhou high-speed railway (165 words) [view diff] exact match in snippet view article find links to article
Type High-speed rail Operator(s) China Railway Chengdu Group Technical Line length 291.3 km (181 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeJodhpur–Jaisalmer line (566 words) [view diff] exact match in snippet view article find links to article
branch section) 18 June 2007 (Kolayat–Phalodi branch section) Technical Line length Main line 292 km (181 mi) Phalodi–Lalgarh branch line 158 km (98 mi)Prayagraj–Mau–Gorakhpur main line (146 words) [view diff] exact match in snippet view article find links to article
WDP 4 and WDG 4 History Opened 1930; 94 years ago (1930) Technical Line length 330.720 km (205 mi) Track length 356 km (221 mi) Track gauge 5 ft 6 inÎle-de-France tramway lines 3a and 3b (1,086 words) [view diff] exact match in snippet view article find links to article
16 December 2006 (2006-12-16) Last extension 15 December 2012 Technical Line length 12.4 km (7.7 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeTakashinohama Line (152 words) [view diff] exact match in snippet view article find links to article
Opened 1918/1919 Closed 22 May 2021 Reopened 6 April 2024 Technical Line length 1.5 km (0.93 mi) Number of tracks Single Track gauge 1,067 mm (3 ft 6 in)Narkatiaganj–Bhikhna Thori branch line (380 words) [view diff] exact match in snippet view article find links to article
Junction Bhikhna Thori Service Operator(s) East Central Railway Technical Line length 36 km Track gauge 1,676 mm (5 ft 6 in) broad gauge Electrification YesAsansol–Patna section (515 words) [view diff] exact match in snippet view article find links to article
Eastern Railway, East Central Railway History Opened 1871 Technical Line length 331 km (206 mi) Number of tracks 2 Track gauge 5 ft 6 in (1,676 mm) broadAndal–Sitarampur loop line (373 words) [view diff] exact match in snippet view article find links to article
Broad gauge Operator(s) Eastern Railway History Opened 1864 Technical Line length 41 km (25 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationVaranasi–Sultanpur–Lucknow line (281 words) [view diff] exact match in snippet view article find links to article
for main line Depot(s) Lucknow Alambagh History Opened 1872 Technical Line length 2 Track length Varanasi–Jaunpur City–Sultanpur–Lucknow: 282 km (175 mi)Eklakhi–Balurghat branch line (435 words) [view diff] exact match in snippet view article find links to article
Operator(s) Northeast Frontier Railway zone History Opened 2004; 20 years ago (2004) Technical Line length 87 km (54 mi) Electrification 2023 with 25 kV ACBarauni–Samastipur section (258 words) [view diff] exact match in snippet view article find links to article
WDM-2, WDM-3A, WDS-5, WDP-4 and WDG-4 History Opened 1886 Technical Line length 50.54 km (31 mi) Track length 120 km (75 mi) Number of tracks 2 (electrified)Keikyū Kurihama Line (365 words) [view diff] exact match in snippet view article find links to article
History Opened 1 December 1942; 81 years ago (1942-12-01) Technical Line length 13.4 km (8.3 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeBarsoi–New Farakka section (549 words) [view diff] exact match in snippet view article find links to article
Eastern Railway, Northeast Frontier Railway History Opened 1963 Technical Line length 126 km (78 mi) Number of tracks 2 Track gauge 5 ft 6 in (1,676 mm) broadTongmi line (130 words) [view diff] exact match in snippet view article find links to article
Railway Beijing Group History Opened June 30, 2020; 4 years ago (2020-06-30) Technical Line length 84.2 km (52.3 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in)Changsha–Ganzhou high-speed railway (156 words) [view diff] exact match in snippet view article find links to article
Ganzhou West Service Operator(s) China Railway High-speed Technical Line length 420.9 km (262 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speedKeihan Nakanoshima Line (261 words) [view diff] exact match in snippet view article find links to article
Electric Railway Depot(s) none History Opened October 19, 2008 Technical Line length 3.0 km (1.9 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8+1⁄2 in)McLeod's Light Railways (1,430 words) [view diff] exact match in snippet view article find links to article
Burdwan, Katwa, Ahmadpur, Bankura, History Opened 1915–1917 Technical Line length 245.3 km (152 mi) Track length 245.3 km (152 mi) Track gauge 2 ft 6 inBiryulyovskaya line (92 words) [view diff] exact match in snippet view article find links to article
transit System Moscow Metro Operator(s) Moskovsky Metropoliten Technical Line length 22.2 kilometres (13.8 mi) (first stage) Character Underground Track gaugeGuntakal–Vasco da Gama section (608 words) [view diff] exact match in snippet view article find links to article
zone South Western Railway zone Konkan Railway Corporation Technical Line length 457 km (284 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in) OldMuzaffarpur–Hajipur section (266 words) [view diff] exact match in snippet view article find links to article
WDM-2, WDM-3A, WDS-5, WDP 4 and WDG 4 History Opened 1886 Technical Line length 53.83 km (33.4 mi) Track length 59 km (36.7 mi) Number of tracks 2 (doubleLianyungang–Xuzhou high-speed railway (247 words) [view diff] exact match in snippet view article find links to article
Operator(s) China Railway High-speed History Opened 8 February 2021 Technical Line length 180 km (112 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Minimum radius 7000Shi (poetry) (524 words) [view diff] exact match in snippet view article
included in the Classic, there are few formal constraints apart from line length (usually four characters and no more than seven) and rhyming every otherRøykenvik Line (119 words) [view diff] exact match in snippet view article find links to article
Operator(s) Norwegian State Railways History Opened 1900 Closed 1957 Technical Line length 7 km Number of tracks Single Character Passenger and freight Track gaugeU2 (Hamburg U-Bahn) (304 words) [view diff] exact match in snippet view article
U-Bahn Operator(s) Hamburger Hochbahn History Opened 21 October 1913 Technical Line length 24.543 km (15.250 mi) Track gauge 4 ft 8+1⁄2 in (1,435 mm)U1 (Hamburg U-Bahn) (355 words) [view diff] exact match in snippet view article
U-Bahn Operator(s) Hamburger Hochbahn History Opened 1 December 1914 Technical Line length 55.383 km (34.413 mi) Track gauge 4 ft 8+1⁄2 in (1,435 mm)HMS Chester (1743) (84 words) [view diff] case mismatch in snippet view article
characteristics Class and type 1741 proposals 50-gun fourth rate ship of the line Length 140 ft (42.7 m) (gundeck) Beam 40 ft (12.2 m) Depth of hold 17 ft 2+1⁄2 inKarasuyama Line (451 words) [view diff] exact match in snippet view article find links to article
History Opened 15 April 1923; 101 years ago (15 April 1923) Technical Line length 20.4 km (12.7 mi) Number of tracks Single tracked Character Fairly ruralKolkata Suburban Railway (5,955 words) [view diff] exact match in snippet view article find links to article
with a line length of 127 km (79 mi). The fourth branch line bifurcates at Kalyani Junction terminating at Kalyani Simanta with a line length of 5 kmKeikyū Zushi Line (330 words) [view diff] exact match in snippet view article find links to article
Type Commuter rail Depot(s) None History Opened April 1930 Technical Line length 5.9 km (3.7 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8+1⁄2 in)Manamadurai–Rameswaram branch line (238 words) [view diff] exact match in snippet view article find links to article
Express train Passenger train Operator(s) Southern Railway zone Technical Line length 161 km (100 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in) OldShorncliffe railway line (306 words) [view diff] exact match in snippet view article find links to article
railway station, 2012 Overview Website queenslandrail.com.au Technical Line length 11 km (6.8 mi) Number of tracks Quadruple to Northgate, double to SandgateYamaman Yūkarigaoka Line (218 words) [view diff] exact match in snippet view article find links to article
2 November 1982 (1982-11-02) Completed 22 September 1983 (1983-09-22) Technical Line length 4.1 km (2.5 mi) Number of tracks 1 Electrification 750 V DC third railTrams in Basel (1,104 words) [view diff] exact match in snippet view article find links to article
comprises 12 lines. Nine are operated by BVB and three by BLT. The combined line length of the 12 lines is 128.5 kilometres (79.8 mi). The Basel tram networkKeiō Dōbutsuen Line (230 words) [view diff] exact match in snippet view article find links to article
series History Opened 29 April 1964; 60 years ago (1964-04-29) Technical Line length 2.0 km (1.2 mi) Number of tracks Single-track Track gauge 1,372 mm (4 ft 6 in)Palakkad–Pollachi line (463 words) [view diff] exact match in snippet view article find links to article
ZONE ) History Opened 1898; 126 years ago (1898) Closed 2009 Technical Line length 58 km (36 mi) Track length 58 KM Number of tracks 1+2=2 Character DOUBLEVestmarka Line (75 words) [view diff] exact match in snippet view article find links to article
Railways History Opened 15 October 1918 Closed 1 June 1965 Technical Line length 14.25 kilometres (9 mi) Number of tracks Single Character Passenger andTōgane Line (330 words) [view diff] exact match in snippet view article find links to article
Stations 5 Service Operator(s) JR East History Opened 1900 Technical Line length 13.8 km (8.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500Line 8 (Wuhan Metro) (214 words) [view diff] exact match in snippet view article
History Opened 26 December 2017; 6 years ago (2017-12-26) Technical Line length 38.197 km (23.73 mi) Number of tracks 2 Character Underground Track gaugeIiyama Line (196 words) [view diff] exact match in snippet view article find links to article
East Rolling stock KiHa 110 series DMU History Opened 1921 Technical Line length 96.7 km (60.1 mi) Number of tracks Entire line single tracked CharacterSuratgarh–Bathinda line (501 words) [view diff] exact match in snippet view article find links to article
March 1929 (Anupgarh branch) 17 July 2012 (Fazilka branch) Technical Line length Main line 264 km (164 mi) Branch lines: Fazilka–Abohar 43 km (27 mi)Setagaya Line (333 words) [view diff] exact match in snippet view article find links to article
per day (2017) History Opened January 18, 1925 (1925-01-18) Technical Line length 5 km (3.1 mi) Number of tracks Double track Track gauge 1,372 mm (4 ft 6 in)Nagano Line (Kintetsu) (323 words) [view diff] exact match in snippet view article
Last extension 12 December 1902; 121 years ago (1902-12-12) Technical Line length 12.5 km (7.8 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500 V DCLine 3 (Chengdu Metro) (151 words) [view diff] exact match in snippet view article
Peak) History Opened 31 July 2016; 8 years ago (2016-07-31) Technical Line length 49.85 km (30.98 mi) Number of tracks 2 Character Underground and ElevatedSuratgarh–Bathinda line (501 words) [view diff] exact match in snippet view article find links to article
March 1929 (Anupgarh branch) 17 July 2012 (Fazilka branch) Technical Line length Main line 264 km (164 mi) Branch lines: Fazilka–Abohar 43 km (27 mi)Kashihara Line (184 words) [view diff] exact match in snippet view article find links to article
Saidaiji History Opened 1 April 1921; 103 years ago (1921-04-01) Technical Line length 23.8 km (14.8 mi) Number of tracks Double-track Character Commuter railKedungsepur (train) (195 words) [view diff] exact match in snippet view article
302 Series DMU History Opened 28 September 2014 (2014-09-28) Technical Line length 60 km (37 mi) Character At-grade Track gauge 1,067 mm (3 ft 6 in)Mok-dong Line (98 words) [view diff] exact match in snippet view article find links to article
Native name 서울 경전철 목동선 (木洞線) Status Proposed Termini Sinwol Dangsan Stations 12 History Planned opening 2028 Technical Line length 10.87 km (6.75 mi)Shanghai–Nanjing–Hefei high-speed railway (145 words) [view diff] exact match in snippet view article find links to article
Locale China Termini Hefei South Shanghai Baoshan Stations 16 Technical Line length 554.6 km (344.6 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8+1⁄2 in)Longhai railway (681 words) [view diff] exact match in snippet view article find links to article
Zhengzhou Group China Railway Xi'an Group China Railway Lanzhou Group Technical Line length 1,759 km (1,093 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in)S9 (Rhine-Main S-Bahn) (150 words) [view diff] exact match in snippet view article
Hbf Rolling stock DBAG Class 430 History Opened 2000 (2000) Technical Line length 66.1 km (41.1 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeEastern Trunk line (160 words) [view diff] exact match in snippet view article find links to article
Conventional railway Operator(s) Taiwan Railways Administration Technical Line length 320.3 km (199.0 mi) Number of tracks Varies Track gauge 3 ft 6 in (1Keiō New Line (371 words) [view diff] exact match in snippet view article find links to article
History Opened October 30, 1978; 45 years ago (1978-10-30) Technical Line length 3.6 km (2.2 mi) Number of tracks Double-track Track gauge 1,372 mm (4 ft 6 in)MIA Mover (573 words) [view diff] exact match in snippet view article find links to article
Mitsubishi Crystal Mover vehicles History Opened September 9, 2011 Technical Line length 1.27 miles (2.04 km) Character Serves non-sterile areas of the airportRyūgasaki Line (171 words) [view diff] exact match in snippet view article find links to article
KiHa 532 series DMU, KiHa 2000 series DMU History Opened 1900 Technical Line length 4.5 km (2.8 mi) Number of tracks Entire line single tracked CharacterMau–Ghazipur–Dildarnagar main line (303 words) [view diff] exact match in snippet view article find links to article
North Eastern Railway zone East Central Railway zone History Opened 2015 Technical Line length 66 km (41 mi) Track gauge 5 ft 6 in (1,676 mm) broad gaugeChongqing–Wanzhou intercity railway (357 words) [view diff] exact match in snippet view article find links to article
Chengdu Group History Opened 28 November 2016 (2016-11-28) Technical Line length 248 km (154 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge OperatingItō Line (616 words) [view diff] exact match in snippet view article find links to article
Last extension 15 December 1938; 85 years ago (1938-12-15) Technical Line length 16.9 km (10.5 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 240 mVijayawada–Nidadavolu loop line (104 words) [view diff] exact match in snippet view article find links to article
Vijayawada Nidadavolu Service Operator(s) South Coast Railway Technical Line length 127 km (79 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationShima Line (1,378 words) [view diff] exact match in snippet view article find links to article
Tracks re-routed through Aomine Tunnel on Shiraki to Gochi section. Total line length reduced by 0.7 km. May 30, 2001 - Wanman driver-only operation beginsSeibu Seibuen Line (93 words) [view diff] exact match in snippet view article find links to article
rail Operator(s) Seibu Railway History Opened 5 April 1930 Technical Line length 2.4 km (1.5 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in) MinimumBardhaman–Katwa line (419 words) [view diff] exact match in snippet view article find links to article
Balgona section); 1 December 2014 (Balgona - Katwa section) Technical Line length 53 km (33 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge Old gaugeShenzhen–Shanwei high-speed railway (122 words) [view diff] exact match in snippet view article find links to article
Stations 6 Service Operator(s) China Railway Guangzhou Group Technical Line length 129 km (80 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speed 350 km/hComm (633 words) [view diff] exact match in snippet view article find links to article
read lines with the function readlinebuffer() which does not impose any line length limits if system memory suffices. Other implementations read lines withSkyTrain (Metro Manila) (691 words) [view diff] exact match in snippet view article
Infracorp Daily ridership 60,000–100,000 (projected) History Commenced TBD Planned opening TBD Technical Line length 2 km (1.2 mi) Character ElevatedChord Line, Tamil Nadu (517 words) [view diff] exact match in snippet view article find links to article
History Opened 1 February 1929; 95 years ago (1929-02-01) Technical Line length 178 km (111 mi) Number of tracks Double Line (Triple line between GOCNew Delhi–Chennai main line (603 words) [view diff] exact match in snippet view article find links to article
Southern Railway History Opened 1929; 95 years ago (1929) Technical Line length 2,182 km (1,356 mi) Number of tracks 2/3/4 Track gauge 5 ft 6 in (1,676 mm)Charles E. Leiserson (800 words) [view diff] exact match in snippet view article find links to article
are algorithms that have no tuning parameters for cache size or cache-line length, but nevertheless use cache near-optimally. He developed the Cilk languageTrams in Toruń (275 words) [view diff] exact match in snippet view article find links to article
Komunikacji w Toruniu [pl] (MZK Toruń). There are 7 tramlines with a total line length of 54.3 kilometres (33.7 mi). The system operates on 28 kilometres (17 mi)Red Line (Washington Metro) (2,696 words) [view diff] exact match in snippet view article
7000-series History Opened March 27, 1976 (1976-March-27) Technical Line length 31.9 mi (51.3 km) Number of tracks 2 Character At-grade, undergroundRublyovo-Arkhangelskaya line (131 words) [view diff] exact match in snippet view article find links to article
transit System Moscow Metro Operator(s) Moskovsky Metropoliten Technical Line length 18.7 kilometres (11.6 mi) Character Underground Track gauge 1,520 mmIkaho Ropeway (385 words) [view diff] exact match in snippet view article find links to article
Japan Operator City of Shibukawa Technical features Aerial lift type Aerial tramway Line length 0.499 km (0.310 mi) Notes 182 m (597 ft) Electric motorR16 (Rodalies de Catalunya) (566 words) [view diff] exact match in snippet view article
Penedès, Camp de Tarragona, Baix Ebre and Montsià regions. With a total line length of 172 kilometres (107 mi), it extends notably beyond the limits of theNankai Airport Line (176 words) [view diff] exact match in snippet view article find links to article
7100 series 8000 series 8300 series 9000 series 50000 series Technical Line length 8.8 km (5.5 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in) ElectrificationMaizuru Line (323 words) [view diff] exact match in snippet view article find links to article
Higashi-Maizuru Stations 6 Service Type Heavy rail History Opened 1904 Technical Line length 26.4 km (16.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Troitskaya line (657 words) [view diff] exact match in snippet view article find links to article
Operator(s) Moskovsky Metropoliten History Opened 7 September 2024 Technical Line length 40.2 km (25.0 mi) Character Underground Track gauge 1,520 mm (4 ft 11+27⁄32 in)Gaya–Kiul line (776 words) [view diff] exact match in snippet view article find links to article
Service Operator(s) East Central Railway History Opened 1879 Technical Line length 129 km (80 mi) Number of tracks 2 (double) Track gauge 5 ft 6 in (1,676 mm)Line 1 (Guangzhou Huangpu Tram) (90 words) [view diff] exact match in snippet view article
Yuyan History Opened 1 July 2020; 4 years ago (2020-07-01) Technical Line length 14.3 km (8.9 mi) Number of tracks 2 Character At-grade, elevated TrackTōbu Utsunomiya Line (267 words) [view diff] exact match in snippet view article find links to article
Tobu 8000 series, Tobu 20400 series EMUs History Opened 1931 Technical Line length 24.3 km (15.1 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1U3 (Hamburg U-Bahn) (312 words) [view diff] exact match in snippet view article
System Hamburg U-Bahn Operator(s) Hamburger Hochbahn History Opened 1912 Technical Line length 20.68 km (12.85 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in)Hafslund Line (101 words) [view diff] exact match in snippet view article find links to article
Operator(s) Hafslund Smelteverk History Opened 1898 Closed 1973 Technical Line length 5.5 km Number of tracks Single Character Freight Track gauge 1,435 mmSuphan Buri Line (162 words) [view diff] exact match in snippet view article find links to article
Railway of Thailand History Opened 16 June 1963 (1963-06-16) Technical Line length 78 km (48 mi) Number of tracks 1 Track gauge 1,000 mm (3 ft 3+3⁄8 in)Line 16 (Beijing Subway) (1,258 words) [view diff] exact match in snippet view article
northern section was subsequently restored months later, bringing the line length 49 km (30.4 mi). The Beijing Municipal Commission of Urban Planning releasedSpikkestad Line (146 words) [view diff] exact match in snippet view article find links to article
Operator(s) Vy Rolling stock Class 72 History Opened 1872 Technical Line length 14 km (8.7 mi) Number of tracks Single Character Commuter trains TrackHMS Princess Louisa (1744) (98 words) [view diff] case mismatch in snippet view article
characteristics Class and type 1741 proposals 58-gun fourth rate ship of the line Length 147 ft (44.8 m) (gundeck) Beam 42 ft (12.8 m) Depth of hold 18 ft 1 inBarsoi–Radhikapur branch line (513 words) [view diff] exact match in snippet view article find links to article
Frontier Railway History Opened 1889 (broad gauge from 2006) Technical Line length 53.44 km (33 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationZhengzhou–Jiaozuo intercity railway (286 words) [view diff] exact match in snippet view article find links to article
High-speed Rolling stock CRH6A History Opened June 26, 2015 Technical Line length 77.786 km (48 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeCarnarvonshire Railway (359 words) [view diff] exact match in snippet view article find links to article
Railway Overview Locale Wales History Opened 29 July 1862 Closed December 1964 Technical Line length 27 miles (43 km) Track gauge 4 ft 8+1⁄2 in (1,435 mm)Bikaner–Rewari line (736 words) [view diff] exact match in snippet view article find links to article
line) 1 March 1916 (Sardarshahr branch) 1939 (Sikar branch) Technical Line length Main line 379 km (235 mi) Branch Lines: Ratangarh–Sardar Shahar 52 kmLiuzhou–Nanning intercity railway (117 words) [view diff] exact match in snippet view article find links to article
Operator(s) CR Nanning History Opened 30 December 2013 (2013-12-30) Technical Line length 226 km (140 mi) Character CR Nanning Track gauge 1,435 mm (4 ft 8+1⁄2 in)Neora–Daniyawan–Bihar Sharif–Sheikhpura line (351 words) [view diff] exact match in snippet view article find links to article
Railway History Opened 2015 (Daniyawan–Bihar Sharif section) Technical Line length 123.2 km (77 mi) Number of tracks 1 Track gauge broad gauge 1,676 mmNankai Cable Line (101 words) [view diff] exact match in snippet view article find links to article
Cable car Funicular Services 1 History Opened 29 June 1930 Technical Line length 0.8 km (0.50 mi) Number of tracks Single Track gauge 1,067 mm (3 ft 6 in)Wuhan–Xiaogan intercity railway (84 words) [view diff] exact match in snippet view article find links to article
Railway High-speed Operator(s) CR Wuhan Rolling stock CRH2A Technical Line length 61.8 km (38.4 mi) Number of tracks 2 (Double-track) Electrification 25 kV 50 Hz ACKusatsu Line (334 words) [view diff] exact match in snippet view article find links to article
225-0 series EMU 225-100 series EMU History Opened 1889 (1889) Technical Line length 36.7 km (22.8 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Melaka Monorail (472 words) [view diff] exact match in snippet view article find links to article
Monorail Theme Park & Studios Sdn Bhd Rolling stock Three-car trains History Opened 21 October 2010 Technical Line length 2.5 km (1.6 mi) Character ElevatedRegional Connector (2,712 words) [view diff] exact match in snippet view article find links to article
History Opened June 16, 2023; 15 months ago (2023-06-16) Technical Line length 1.9 mi (3.1 km) Character Fully underground Track gauge 4 ft 8+1⁄2 inGanzhou–Shenzhen high-speed railway (307 words) [view diff] exact match in snippet view article find links to article
Railway High-speed History Opened 10 December 2021 (2021-12-10) Technical Line length 434 km (270 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) ElectrificationZhuhai–Zhuhai Airport intercity railway (239 words) [view diff] exact match in snippet view article find links to article
Opened 18 August 2020 (Phase 1) 3 February 2024 (Phase 2) Technical Line length 39.475 km (full line) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeEurasia Continental Bridge corridor (310 words) [view diff] exact match in snippet view article find links to article
High-speed Operator(s) CR Shanghai CR Zhengzhou CR Xi'an CR Lanzhou Technical Line length 3,422 km (2,126 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeSamastipur–Muzaffarpur section (273 words) [view diff] exact match in snippet view article find links to article
WAG-7, WAG-9, WAG-9H, WAP-4 and WAP-7 History Opened 1886 Technical Line length 53 km (33 mi) Track length 125 km (78 mi) Number of tracks 2 (electrified)Dehri Rohtas Light Railway (682 words) [view diff] exact match in snippet view article find links to article
December 1918. It had 11" x 16" cylinders and 2' 7½" wheels. Technical Line length 72.6 kilometres (45.1 mi) in Narrow Guage; 81 kilometres (50 mi) in BroadHankyū Minoo Line (127 words) [view diff] exact match in snippet view article find links to article
4 Service Operator(s) Hankyu Railway Depot(s) Hirai Depot Technical Line length 4.0 km (2.5 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) ElectrificationNew Delhi–Mumbai main line (397 words) [view diff] exact match in snippet view article find links to article
North Central Railway, West Central Railway, Western Railway Technical Line length 1,386 km (861 mi) Number of tracks 2 Track gauge 5 ft 6 in (1,676 mm)Guntakal–Renigunta section (573 words) [view diff] exact match in snippet view article find links to article
Renigunta Junction Service Operator(s) South Central Railway Technical Line length 144.30 km (89.66 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationR3 (Rodalies de Catalunya) (972 words) [view diff] exact match in snippet view article
through the Vallès Oriental, Osona and Ripollès regions. With a total line length of 165.9 kilometres (103.1 mi), it extends notably beyond the limitsS6 (Rhine-Main S-Bahn) (161 words) [view diff] exact match in snippet view article
stock DBAG Class 423 History Opened 28 May 1978 (1978-05-28) Technical Line length 39.1 km (24.3 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeS3 (Rhine-Main S-Bahn) (164 words) [view diff] exact match in snippet view article
stock DBAG Class 423 History Opened 28 May 1978 (1978-05-28) Technical Line length 49 km (30 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge ElectrificationShangqiu–Hangzhou high-speed railway (290 words) [view diff] exact match in snippet view article find links to article
- Huzhou) 22 September 2022 (2022-09-22) (Huzhou - Tonglu) Technical Line length 798 km (496 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge ElectrificationMount Tsukuba Ropeway (192 words) [view diff] exact match in snippet view article find links to article
Carrier capacity 70 Passengers per cabin, 2 cabins Trip duration 6 min Technical features Line length 1.296 km (0.8 mi) Vertical Interval 298 m (978 ft)Kanazawa Seaside Line (225 words) [view diff] exact match in snippet view article find links to article
Automated guideway transit Rolling stock 2000 series History Opened July 5, 1989 Technical Line length 10.6 km (6.6 mi) Electrification 750 V DC third railGangbukhoengdan Line (109 words) [view diff] exact match in snippet view article find links to article
Planned Owner Seoul Metropolitan Government Termini Cheongnyangni Mok-dong Stations 19 History Planned opening 2028 Technical Line length 25.7 km (16.0 mi)Tobu Kameido Line (420 words) [view diff] exact match in snippet view article find links to article
History Opened 5 April 1904; 120 years ago (5 April 1904) Technical Line length 3.4 km (2.1 mi) Number of tracks Double-track Track gauge 1,067 mm (3 ft 6 in)Measure (279 words) [view diff] exact match in snippet view article find links to article
(Justified), a 2012 episode of the TV series Justified Measure (typography), line length in characters per line Coal measures, the coal-bearing part of the UpperNanchang–Jiujiang intercity railway (130 words) [view diff] exact match in snippet view article find links to article
China Railway Nanchang Group History Opened September 20, 2010 Technical Line length 131.27 km (82 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeBardhaman–Asansol section (953 words) [view diff] exact match in snippet view article find links to article
Electrified Operator(s) Eastern Railway History Opened 1855–1863 Technical Line length 106 km (66 mi) Number of tracks 4 (2 up and 2 dn) Track gauge 5 ft 6 inHMS Eagle (1745) (454 words) [view diff] case mismatch in snippet view article
1767 General characteristics Class and type Fourth rate ship of the line Length 147 ft (44.8 m) (gundeck) Beam 42 ft (12.8 m) Depth of hold 18 ft 1 inMinangkabau Express (226 words) [view diff] exact match in snippet view article find links to article
trainsets History Opened 21 May 2018; 6 years ago (2018-05-21) Technical Line length 23 km (14 mi) Character Ground Track gauge 1,067 mm (3 ft 6 in) ElectrificationLine 2 (Chengdu Metro) (187 words) [view diff] exact match in snippet view article
History Opened 16 September 2012; 12 years ago (2012-09-16) Technical Line length 42.32 km (26.30 mi) Number of tracks 2 Character Underground and ElevatedSEPTA Main Line (569 words) [view diff] exact match in snippet view article find links to article
System SEPTA Regional Rail Operator(s) SEPTA Regional Rail Technical Line length 26.25 miles (42.25 km) Number of tracks 2–4 Track gauge 4 ft 8+1⁄2 inLGV Interconnexion Est (393 words) [view diff] exact match in snippet view article find links to article
High-speed rail System SNCF Operator(s) SNCF History Opened 1994 Technical Line length 90 km (56 mi) Number of tracks Double track Track gauge 1,435 mm (4 ft 8+1⁄2 in)Keisei Kanamachi Line (334 words) [view diff] exact match in snippet view article find links to article
History Opened 21 October 1913; 110 years ago (21 October 1913) Technical Line length 2.5 km (1.6 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge MinimumLGV Rhône-Alpes (478 words) [view diff] exact match in snippet view article find links to article
Montanay et Saint-Quentin-Fallavier 3 July 1994: full line Technical Line length 115 km (71 mi) Number of tracks Double track Track gauge 1,435 mm (4 ft 8+1⁄2 in)Trans-Harbour line (Mumbai Suburban Railway) (541 words) [view diff] exact match in snippet view article
(for goods) 9 November 2004; 19 years ago (2004-11-09) (for passengers) Technical Line length 38 km (24 mi) Track gauge 5 ft 6 in (1,676 mm) broad gaugeHS4Air (913 words) [view diff] exact match in snippet view article find links to article
expedition.uk.com Service Type High-speed rail System National Rail Technical Line length 87 miles (140 km) Number of tracks Double track Track gauge 4 ft 8+1⁄2 inShinonoi Line (406 words) [view diff] exact match in snippet view article find links to article
Termini Shinonoi Shiojiri Stations 15 Service Type Heavy rail Technical Line length 66.7 km (41.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Keisei Chiba Line (341 words) [view diff] exact match in snippet view article find links to article
rail Operator(s) Keisei Electric Railway History Opened 1921 Technical Line length 12.9 km (8.0 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) ElectrificationLine S6 (Nanjing Metro) (213 words) [view diff] exact match in snippet view article
History Opened 28 December 2021; 2 years ago (2021-12-28) Technical Line length 43.64 km (27.1 mi) Character Elevated and underground Track gauge 1,435 mmPune–Miraj–Londa line (531 words) [view diff] exact match in snippet view article find links to article
Railway, South Western Railway Depot(s) Pune History Opened 1890 Technical Line length 468 km (291 mi) Number of tracks 2/1 Track gauge 5 ft 6 in (1,676 mm)Chongqing–Kunming high-speed railway (271 words) [view diff] exact match in snippet view article find links to article
Kunming South Service Operator(s) China Railway High-speed Technical Line length 699 km (434 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8+1⁄2 in)Chengdu–Dazhou–Wanzhou high-speed railway (158 words) [view diff] exact match in snippet view article find links to article
Stations 13 Service Operator(s) China Railway Chengdu Group Technical Line length 477 km (296 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speedGuangzhou–Shanwei High-speed railway (304 words) [view diff] exact match in snippet view article find links to article
China Railway Guangzhou Group History Opened 26 September 2023 Technical Line length 206.2 km (128.1 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speedLine D2 (Moscow Central Diameters) (185 words) [view diff] exact match in snippet view article
Rolling stock EG2Tv History Opened 29 November 2019 (2019-11-29) Technical Line length 80 km (50 mi) Track gauge 1,520 mm (4 ft 11+27⁄32 in) Russian gauge ElectrificationSuining–Chengdu railway (177 words) [view diff] exact match in snippet view article find links to article
rail System China Railway High-speed Operator(s) CR Chengdu Technical Line length 146 km (91 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8+1⁄2 in)Shanghai–Kunming railway (400 words) [view diff] exact match in snippet view article find links to article
Kunming Service Type Heavy rail Operator(s) China Railway Technical Line length 2,690 km (1,670 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeSeibu Yūrakuchō Line (409 words) [view diff] exact match in snippet view article find links to article
Nerima Kotake-Mukaihara Stations 3 Service Type Commuter rail Technical Line length 2.6 km (1.6 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in) ElectrificationKeihan Ishiyama Sakamoto Line (215 words) [view diff] exact match in snippet view article find links to article
Operator(s) Keihan Electric Railway History Closed 1 March 1913 Technical Line length 14.1 km (8.8 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) ElectrificationGreen line (Stockholm metro) (1,215 words) [view diff] exact match in snippet view article
splitting into three branches south of the city centre, with a total line length of 41.256 kilometres (25.635 mi). It is served by three metro routesKeihan Uji Line (180 words) [view diff] exact match in snippet view article find links to article
Depot(s) Neyagawa, Yodo History Opened 1 June 1913 (1913-06-01) Technical Line length 7.6 km (4.7 mi) Number of tracks double tracks Track gauge 1,435 mm (4 ft 8+1⁄2 in)Beenleigh railway line (687 words) [view diff] exact match in snippet view article find links to article
BRBN; BRVL; DBBN; FGBN; VLBR; VLDB Operator(s) Queensland Rail Technical Line length 41.595 km (25.846 mi) Track length 41.595 km (25.846 mi) Number of tracksU3 (Berlin U-Bahn) (2,386 words) [view diff] exact match in snippet view article
22 December 1929 (1929-12-22) Separated from U1 12 December 2004 (2004-12-12) Technical Line length 18.9 km (11.7 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeVaranasi–Chhapra line (582 words) [view diff] exact match in snippet view article find links to article
History Opened 15 March 1909 (Main) 15 March 1899 (Branch) Technical Line length Main line 206 km (128 mi) Aunrihar–Mau–Phephna branch line 118 km (73 mi)Xiamen–Shenzhen railway (748 words) [view diff] exact match in snippet view article find links to article
History Opened 28 December 2013 (10 years ago) (2013-12-28) Technical Line length 502.4 km (312 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeS4 (Rhine-Main S-Bahn) (175 words) [view diff] exact match in snippet view article
stock DBAG Class 423 History Opened 28 May 1978 (1978-05-28) Technical Line length 33.5 km (20.8 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeSillim Line (192 words) [view diff] exact match in snippet view article find links to article
Rolling stock 12 × 3-car Woojin SL000 History Opened 28 May 2022 Technical Line length 7.8 km (4.8 mi) Number of tracks 2 Track gauge 1,700 mm (5 ft 6+15⁄16 in)Varanasi–Chhapra line (582 words) [view diff] exact match in snippet view article find links to article
History Opened 15 March 1909 (Main) 15 March 1899 (Branch) Technical Line length Main line 206 km (128 mi) Aunrihar–Mau–Phephna branch line 118 km (73 mi)Sillim Line (192 words) [view diff] exact match in snippet view article find links to article
Rolling stock 12 × 3-car Woojin SL000 History Opened 28 May 2022 Technical Line length 7.8 km (4.8 mi) Number of tracks 2 Track gauge 1,700 mm (5 ft 6+15⁄16 in)Shanghai–Kunming railway (400 words) [view diff] exact match in snippet view article find links to article
Kunming Service Type Heavy rail Operator(s) China Railway Technical Line length 2,690 km (1,670 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeLine 4 (Hangzhou Metro) (152 words) [view diff] exact match in snippet view article
Peak) History Opened 2 February 2015; 9 years ago (2015-02-02) Technical Line length 46.85 km (29.11 mi) Number of tracks 2 Character Underground Track gaugePatna–Mughalsarai section (426 words) [view diff] exact match in snippet view article find links to article
Service Operator(s) East Central Railway History Opened 1862 Technical Line length 212 km (132 mi) Number of tracks 2 Track gauge 5 ft 6 in (1,676 mm) broadLine 7 (Wuhan Metro) (138 words) [view diff] exact match in snippet view article
A History Opened 1 October 2018; 5 years ago (2018-10-01) Technical Line length 67.853 km (42.16 mi) Number of tracks 2 Character Underground and elevatedSlope car (1,000 words) [view diff] exact match in snippet view article find links to article
Facility, line name Function Diagonal line length (m) Diagonal line length (ft) Speed (km/h) Speed (mph) Maximum gradient Passenger capacity Opening yearBarcelona–Vallès Line (5,702 words) [view diff] exact match in snippet view article find links to article
and Terrassa. It has 40 passenger stations in operation and a total line length of 48.1 kilometres (29.9 mi). The origins of the line date from 1863Sakurai Line (272 words) [view diff] exact match in snippet view article find links to article
EMU, 221 series EMU, 227-1000 series EMU History Opened 1893 Technical Line length 29.4 km (18.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Keisei Oshiage Line (453 words) [view diff] exact match in snippet view article find links to article
Termini Oshiage Aoto Stations 6 Service Type Commuter rail Technical Line length 5.7 km (3.5 mi) Number of tracks Double-track Track gauge 1,435 mm (4 ft 8+1⁄2 in)U3 (Berlin U-Bahn) (2,386 words) [view diff] exact match in snippet view article
22 December 1929 (1929-12-22) Separated from U1 12 December 2004 (2004-12-12) Technical Line length 18.9 km (11.7 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeMuzaffarpur–Sitamarhi section (415 words) [view diff] exact match in snippet view article find links to article
Rolling stock Diesel locos: WDM-2, WDM-3A History Opened 2013 Technical Line length 65.8 km (40.9 mi) Track length 69 km (42.9 mi) Number of tracks 1 (ElectricSeibu Yamaguchi Line (235 words) [view diff] exact match in snippet view article find links to article
stock 3 Seibu 8500 series EMUs History Opened 1950 (1950) Technical Line length 2.8 km (1.7 mi) Number of tracks Single Track gauge 1,700 mm (5 ft 7Tōbu Kiryū Line (234 words) [view diff] exact match in snippet view article find links to article
Japan Termini Ōta Akagi Stations 8 History Opened May 1911 Technical Line length 20.3 km (12.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Wakayama Line (197 words) [view diff] exact match in snippet view article find links to article
series, 221 series, 227-1000 series EMUs History Opened 1896 Technical Line length 87.5 km (54.4 mi) Number of tracks Fully single-track Track gauge 1,067 mmKeikyū Daishi Line (434 words) [view diff] exact match in snippet view article find links to article
History Opened 21 January 1899; 125 years ago (21 January 1899) Technical Line length 4.5 km (2.8 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8+1⁄2 in)S5 (Rhine-Main S-Bahn) (192 words) [view diff] exact match in snippet view article
stock DBAG Class 423 History Opened 28 May 1978 (1978-05-28) Technical Line length 28.9 km (18.0 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeBarkakana–Son Nagar line (466 words) [view diff] exact match in snippet view article find links to article
Electrified Operator(s) East Central Railway History Opened 1907 Technical Line length 313 km (194 mi) Number of tracks 2 Track gauge 5 ft 6 in (1,676 mm) broadSkøyen–Filipstad Line (156 words) [view diff] exact match in snippet view article find links to article
Norwegian Railway Operator(s) CargoNet History Opened 1872 Technical Line length 2 km (1.2 mi) Number of tracks Double Character Freight Track gauge 1Lucknow–Kanpur Suburban Railway (188 words) [view diff] exact match in snippet view article find links to article
Central Railway North Eastern Railway History Opened 1867 Technical Line length 72 km (45 mi) Track gauge 5 ft 6 in (1,676 mm) Indian gauge ElectrificationMeitetsu Bisai Line (206 words) [view diff] exact match in snippet view article find links to article
Daily ridership 11,897 (FY2008) History Opened 1898 (1898) Technical Line length 30.9 km (19.20 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Keçiören Gondola (353 words) [view diff] exact match in snippet view article find links to article
municipality dropped the fare from initially 5.00 ₺ to 1.00 ₺ in April 2013. Line length: 1,653 m (5,423 ft) Height distance: 65.5 m (215 ft) Number of stations:Bund Sightseeing Tunnel (330 words) [view diff] exact match in snippet view article find links to article
History Opened January 2, 2001; 23 years ago (2001-01-02) Technical Line length 646.7 m (2,122 ft) Number of tracks 2 Character Underground OperatingThiruvananthapuram–Nagercoil–Kanyakumari line (465 words) [view diff] exact match in snippet view article find links to article
History Opened 1979; 45 years ago (1979) Electrification 2012 Technical Line length 86 kilometres (53 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in)Ui LRT (445 words) [view diff] exact match in snippet view article find links to article
2-car Hyundai Rotem UL000 History Opened 2 September 2017 Technical Line length 11.4 km (7.1 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8+1⁄2 in)Kururi Line (548 words) [view diff] exact match in snippet view article find links to article
Kisarazu Rolling stock KiHa E130 series DMU History Opened 1912 Technical Line length 32.2 km (20.0 mi) Number of tracks Entire line single tracked CharacterKAI Commuter Tangerang Line (248 words) [view diff] exact match in snippet view article find links to article
(original) 1997 (electrified) 5 December 2011 (as 'Brown Line') Technical Line length 19.297 km (11.991 mi) Number of tracks Double-track Track gauge 1,067 mmNikkō Line (442 words) [view diff] exact match in snippet view article find links to article
Rolling stock E131-600/-680 series EMUs History Opened 1890 Technical Line length 40.5 km (25.2 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Line 10 (Shenyang Metro) (78 words) [view diff] exact match in snippet view article
Corporation History Opened 29 April 2020; 4 years ago (2020-04-29) Technical Line length 27.21 km (16.91 mi) Number of tracks 2 Character Underground Track gaugeHowrah–Gaya–Delhi line (830 words) [view diff] exact match in snippet view article find links to article
North Central Railway, Northern Railway History Opened 1906 Technical Line length 1,452 km (902 mi) Number of tracks 2 Track gauge 5 ft 6 in (1,676 mm)Line 13 (Shenzhen Metro) (317 words) [view diff] exact match in snippet view article
28 October 2024; 39 days' time (2024-10-28) (Phase 1 South section) Technical Line length 22.5km Number of tracks 2 Character Underground Track gauge 1,435 mmBarkakana–Netaji S.C.Bose Gomoh line (559 words) [view diff] exact match in snippet view article find links to article
Electrified Operator(s) East Central Railway History Opened 1902 Technical Line length 105 km (65 mi) Number of tracks 2 Track gauge 5 ft 6 in (1,676 mm) broadHankyū Kōyō Line (136 words) [view diff] exact match in snippet view article find links to article
Shukugawa Kōyōen Service Type Heavy rail History Opened 1924 Technical Line length 2.2 km (1.4 mi) Number of tracks Single Track gauge 1,435 mm (4 ft 8+1⁄2 in)Tenri Line (253 words) [view diff] exact match in snippet view article find links to article
History Opened 7 February 1915; 109 years ago (1915-02-07) Technical Line length 4.5 km (2.8 mi) Number of tracks Double-track Track gauge 1,435 mm (4 ft 8+1⁄2 in)Katihar–Siliguri line (618 words) [view diff] exact match in snippet view article find links to article
Operator(s) Northeast Frontier Railway History Opened 1958 Technical Line length 203.7 kilometres (126.6 mi) Track gauge 1,676 mm (5 ft 6 in) 5 ft 6 inBristol Airport Rail Link (993 words) [view diff] exact match in snippet view article find links to article
Bristol city centre Bristol Airport Service Type Rapid transit, light rail, airport rail link Technical Line length approx. 15 km (9.3 mi) Character UrbanKishin Line (238 words) [view diff] exact match in snippet view article find links to article
History Opened 21 August 1923; 101 years ago (1923-08-21) Technical Line length 158.1 km (98.2 mi) Number of tracks Entire line single tracked CharacterCaminho de Ferro de Penafiel à Lixa e Entre-os-Rios (74 words) [view diff] exact match in snippet view article find links to article
Penafiel station in 2009. Overview Termini Entre-os-Rios Lixa Technical Line length 45.9 km (28.5 mi) Track gauge 1,000 mm (3 ft 3+3⁄8 in) metre gaugeTrunk Line (339 words) [view diff] exact match in snippet view article find links to article
Rolling stock Class 72 (L1) Class 75 (R13) History Opened 1854 Technical Line length 68 km Track length 112 km Number of tracks 1–2 Character Local and freightKeio Sagamihara Line (273 words) [view diff] exact match in snippet view article find links to article
ago (1916-06-01) Last extension 30 March 1990; 34 years ago (1990-03-30) Technical Line length 22.6 km (14.0 mi) Number of tracks Double-track Track gauge 1,372 mmGuiyang–Nanning high-speed railway (152 words) [view diff] exact match in snippet view article find links to article
& China Railway Nanning Group History Opened 8 August 2023 Technical Line length 512 km (318 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speedHangzhou–Taizhou high-speed railway (321 words) [view diff] exact match in snippet view article find links to article
China Railway Shanghai Group History Opened 8 January 2022 Technical Line length 267 km (166 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speedBiwako Line (777 words) [view diff] exact match in snippet view article find links to article
Tōkaidō Main Line) March 13, 1988 (renamed as Biwako Line) Technical Line length 75.4 km (46.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1MRT Line 10 (258 words) [view diff] exact match in snippet view article find links to article
Termini Commonwealth Avenue Ninoy Aquino International Airport Stations 18 Technical Line length 22.5 km (14.0 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in)Gjøvik Line (316 words) [view diff] exact match in snippet view article find links to article
Vy Gjøvikbanen Rolling stock Class 75-2 History Opened 1902 Technical Line length 124 km Number of tracks Single Character Passenger trains Track gaugeRamal da Base Aérea da Maceda (84 words) [view diff] exact match in snippet view article find links to article
Closed Termini Carvalheira-Maceda Aeródromo Militar de Ovar Technical Line length 0.59 km (0.37 mi) Track gauge 1,668 mm (5 ft 5+21⁄32 in) Iberian gaugeSüdostbayernbahn (398 words) [view diff] exact match in snippet view article find links to article
Class 628 (34) Daily ridership 26,000 History Opened 2001 Technical Line length 540 kilometres (340 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standardOhmi Railway Yōkaichi Line (141 words) [view diff] exact match in snippet view article find links to article
Commuter rail Operator(s) Ohmi Railway History Opened 1913 (1913) Technical Line length 9.3 km (5.8 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500Line 8 (Chengdu Metro) (423 words) [view diff] exact match in snippet view article
History Opened 18 December 2020; 3 years ago (2020-12-18) Technical Line length 29.1 km (18.08 mi) Number of tracks 2 Character Underground Track gaugeKakogawa Line (183 words) [view diff] exact match in snippet view article find links to article
Last extension 27 December 1924; 99 years ago (1924-12-27) Technical Line length 48.5 km (30.1 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Merthyr line (1,235 words) [view diff] exact match in snippet view article find links to article
Operator(s) Transport for Wales Rail Rolling stock Class 150 DMUs Technical Line length Merthyr–Abercynon: 8 miles 18 chains (13.2 km) Aberdare–Abercynon: 6 milesHowrah–Bardhaman chord (769 words) [view diff] exact match in snippet view article find links to article
Commuter rail Operator(s) Eastern Railway History Opened 1917 Technical Line length 95 km (59 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationLine 8 (Chengdu Metro) (423 words) [view diff] exact match in snippet view article
History Opened 18 December 2020; 3 years ago (2020-12-18) Technical Line length 29.1 km (18.08 mi) Number of tracks 2 Character Underground Track gaugeRamal de Neves-Corvo (68 words) [view diff] exact match in snippet view article find links to article
Ramal de Neves-Corvo Overview Termini Ourique Neves-Corvo mine Technical Line length 30.8 km (19.1 mi) Track gauge 1,668 mm (5 ft 5+21⁄32 in) Iberian gaugeXiaoshan–Ningbo railway (503 words) [view diff] exact match in snippet view article find links to article
active) Service Type Heavy rail Operator(s) China Railway Technical Line length 147.32 km (91.54 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeOhmi Railway (576 words) [view diff] case mismatch in snippet view article find links to article
Technical Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500 V DC, overhead line Length 59.5 km (37.0 mi) Other Website www.ohmitetudo.co.jpPeddapalli–Nizamabad line (562 words) [view diff] exact match in snippet view article find links to article
Commenced 1993 Opened March 25, 2017; 7 years ago (2017-03-25) Technical Line length 177 km (110 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationRamal da Mina da Nogueirinha (69 words) [view diff] exact match in snippet view article find links to article
Overview Status Closed Termini Casa Branca Nogueirinha mine Technical Line length 5.2 km (3.2 mi) Track gauge 1,668 mm (5 ft 5+21⁄32 in) Iberian gaugeOhmi Railway Taga Line (222 words) [view diff] exact match in snippet view article find links to article
Operator(s) Ohmi Railway History Opened 8 March 1914 (1914-03-08) Technical Line length 2.5 km (1.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500Nagercoil–Tirunelveli line (436 words) [view diff] exact match in snippet view article find links to article
and WDG-3A, WDG-4 History Opened 1981; 43 years ago (1981) Technical Line length 73 kilometres (45 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in)Line 6 (Wuhan Metro) (133 words) [view diff] exact match in snippet view article
History Opened 28 December 2016; 7 years ago (2016-12-28) Technical Line length 42.537 km (26.43 mi) Number of tracks 2 Character Underground Track gaugeLine S2 (BCR) (626 words) [view diff] exact match in snippet view article
NDJ3 History Opened August 6, 2008; 16 years ago (2008-08-06) Technical Line length 108.3 km (main line + branch line) Track gauge 1,435 mm (4 ft 8+1⁄2 in)Ramal do Louriçal (113 words) [view diff] exact match in snippet view article find links to article
de Portugal Termini Louriçal Celbi and The Navigator Company Technical Line length 7 km (4.3 mi) Track gauge 1,668 mm (5 ft 5+21⁄32 in) Iberian gaugeLine 2 (Foshan Metro) (84 words) [view diff] exact match in snippet view article
History Opened 28 December 2021; 2 years ago (2021-12-28) Technical Line length 32.4 km (20.1 mi) Number of tracks 2 Character Underground and elevatedNew Jalpaiguri–New Bongaigaon section (747 words) [view diff] exact match in snippet view article find links to article
Operator(s) Northeast Frontier Railway History Opened 1963 Technical Line length 252 km (157 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationCochin State Forest Tramway (767 words) [view diff] exact match in snippet view article find links to article
3 October 1905 (1905-10-03) Opened 1907 (1907) Closed 1963 (1963) Technical Line length 79.5 km (49.4 mi) Track gauge 1,000 mm (3 ft 3+3⁄8 in) metre gaugeAkita Shinkansen (580 words) [view diff] exact match in snippet view article find links to article
series History Opened 22 March 1997; 27 years ago (1997-03-22) Technical Line length 127.3 km (79.1 mi) Number of tracks Double-track and Single-track TrackRamal de Maceira-Liz (82 words) [view diff] exact match in snippet view article find links to article
Overview Status Operational Termini Martingança Maceira-Liz Technical Line length 5 km (3.1 mi) Track gauge 1,668 mm (5 ft 5+21⁄32 in) Iberian gaugeSeibu Sayama Line (275 words) [view diff] exact match in snippet view article find links to article
Stations 3 Service Type Commuter rail History Opened 1929 Technical Line length 4.2 km (2.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500Loop line (Chongqing Rail Transit) (373 words) [view diff] exact match in snippet view article
History Opened 28 December 2018; 5 years ago (2018-12-28) Technical Line length 50.93 km (31.65 mi) Number of tracks 2 Character Underground and elevatedBarharwa–Azimganj–Katwa loop (844 words) [view diff] exact match in snippet view article find links to article
39 Service Operator(s) Eastern Railway History Opened 1913 Technical Line length 170 km (106 mi) Number of tracks 2 Track gauge 5 ft 6 in (1,676 mm) broadDandong–Dalian intercity railway (417 words) [view diff] exact match in snippet view article find links to article
CR Shenyang History Opened December 17, 2015 (2015-12-17) Technical Line length 292 km (181 mi) Number of tracks 2 (Double-track) Track gauge 1,435 mmBeijing–Shangqiu high-speed railway (252 words) [view diff] exact match in snippet view article find links to article
Fengtai Shangqiu Service Operator(s) China Railway High-speed Technical Line length 552.8 km (343 mi) (Xiong'an-Shangqiu section) 639 km (397 mi) (full line)Seibu Kokubunji Line (475 words) [view diff] exact match in snippet view article find links to article
History Opened 21 December 1894; 129 years ago (1894-12-21) Technical Line length 7.8 km (4.8 mi) Number of tracks 1 (1.2 km double-tracked) Track gaugeMeitetsu Hashima Line (101 words) [view diff] exact match in snippet view article find links to article
Rail Daily ridership 808 (2008) History Opened 1982 (1982) Technical Line length 1.3 km (0.81 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500Meitetsu Takehana Line (176 words) [view diff] exact match in snippet view article find links to article
Rail Daily ridership 4,657 (2008) History Opened 1921 (1921) Technical Line length 10.3 km (6.40 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Salsette–Trombay Railway (388 words) [view diff] exact match in snippet view article find links to article
Great Indian Peninsular Railway History Opened 1928 Closed 1934 Technical Line length 12 km (7.5 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeRamal da Siderurgia Nacional (65 words) [view diff] exact match in snippet view article find links to article
Overview Status Operational Termini Coina Siderurgia Nacional Technical Line length 3.7 km (2.3 mi) Track gauge 1,668 mm (5 ft 5+21⁄32 in) Iberian gaugeWest of England line (1,273 words) [view diff] exact match in snippet view article find links to article
Class 158 "Express Sprinter" Class 159 "South Western Turbo" Technical Line length 120 mi 77 ch (194.67 km) [Basingstoke to Exeter St Davids] 172 mi 12 chGyeonggang Line (372 words) [view diff] exact match in snippet view article find links to article
2016 (Pangyo - Yeoju) December 2017 (Seowonju - Gangneung) Technical Line length 53.8 km (33.4 mi) or 54.8 km (34.1 mi) Number of tracks 2 Track gaugeGyeongin Line (495 words) [view diff] exact match in snippet view article find links to article
Operator(s) Korail History Opened 18 September 1899 (1899-09-18) Technical Line length 27.0 km (16.8 mi) Number of tracks Double track Track gauge 1,435 mmSheerness line (712 words) [view diff] exact match in snippet view article find links to article
National Rail Operator(s) Southeastern Rolling stock Class 375 Technical Line length 7 mi 52 ch (12.3 km) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeMumbai–Chennai line (1,180 words) [view diff] exact match in snippet view article find links to article
South Central Railway, Southern Railway History Opened 1871 Technical Line length 1,281 km (796 mi) Number of tracks 2/1 Track gauge 5 ft 6 in (1,676 mm)Muzaffarpur–Gorakhpur main line (344 words) [view diff] exact match in snippet view article find links to article
Locos: WDM-2, WDM-3A, WDP 4 and WDG 4 History Opened 1930s Technical Line length 309.720 km (192 mi) Track length 318 km Number of tracks 1 (electrified)R11 (Rodalies de Catalunya) (1,248 words) [view diff] exact match in snippet view article
Vallès Oriental, Selva, Gironès and Alt Empordà regions. With a total line length of 172 kilometres (107 mi), it extends notably beyond the limits of theIkegami Line (450 words) [view diff] exact match in snippet view article find links to article
History Opened 6 October 1922; 101 years ago (1922-10-06) Technical Line length 10.8 km (6.7 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500Kualanamu Airport Rail Link (280 words) [view diff] exact match in snippet view article find links to article
trainsets History Opened 25 July 2013; 11 years ago (2013-07-25) Technical Line length 40 km (25 mi) Character Ground, and elevated Track gauge 1,067 mm (3 ft 6 in)Netaji S.C.Bose Gomoh–Hatia line (566 words) [view diff] exact match in snippet view article find links to article
Bokaro Shed and WDM-3A of Bokaro shed History Opened 1961 Technical Line length 152 km (94 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationHowrah–Nagpur–Mumbai line (759 words) [view diff] exact match in snippet view article find links to article
Central Railway History Opened 1890; 134 years ago (1890) Technical Line length 1,968 km (1,223 mi) Number of tracks 2/3/4 Track gauge 5 ft 6 in (1,676 mm)Hakushin Line (296 words) [view diff] exact match in snippet view article find links to article
Service Type Heavy rail Operator(s) JR East History Opened 1952 Technical Line length 27.3 km (17.0 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Welsh Marches line (736 words) [view diff] exact match in snippet view article find links to article
Crewe) 15 (Newport to Chester) Service System National Rail Technical Line length 84.38 miles (135.80 km) Number of tracks Double track throughout TrackBatara Kresna Railbus (246 words) [view diff] exact match in snippet view article find links to article
Indonesia History Opened 5 August 2012; 12 years ago (2012-08-05) Technical Line length 37 km Character Fully subsurface Track gauge 1 067 mm Conduction systemShanghai–Kunming high-speed railway (238 words) [view diff] exact match in snippet view article find links to article
History Opened December 28, 2016; 7 years ago (2016-12-28) Technical Line length 2,066 km (1,284 mi) Number of tracks 2 (Double-track) Track gauge 1,435 mmShoranur–Mangalore section (571 words) [view diff] exact match in snippet view article find links to article
Railway Division of Southern Railway zone History Opened 1907 Technical Line length 328 km (203.81 mi) Track length 328 km (203.81 mi) Number of tracks 2Beijing–Kowloon railway (686 words) [view diff] exact match in snippet view article find links to article
History Opened 1 September 1996; 28 years ago (1996-09-01) Technical Line length 2,311 km (1,436 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) ElectrificationWessex Main Line (1,198 words) [view diff] exact match in snippet view article find links to article
Service Type Regional rail, Heavy rail System National Rail Technical Line length 85mi 49ch (137.77 km) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeRamal de Aveiro-Mar (110 words) [view diff] exact match in snippet view article find links to article
over Linha do Norte under construction. Overview Status Closed Termini Aveiro Canal do Cojo Technical Line length 0.9 km (0.56 mi) Track gauge MetreHankyū Itami Line (149 words) [view diff] exact match in snippet view article find links to article
Service Operator(s) Hankyu Railway Depot(s) Nishinomiya Depot Technical Line length 3.1 km (1.9 mi) Number of tracks Double Track gauge 1,435 mm (4 ft 8+1⁄2 in)Bankura–Masagram line (646 words) [view diff] exact match in snippet view article find links to article
broad-gauge railway) Closed 1965 (as Bakura-Damodar Railway) Technical Line length Broad gauge: 120.3 km (75 mi) Track length Broad gauge: 120.3 km (75 mi)Aunrihar–Jaunpur line (527 words) [view diff] exact match in snippet view article find links to article
WDG-4 WAP-4 WAP-7 History Opened 1904; 120 years ago (1904) Technical Line length 60 km (37 mi) Track gauge 1,676 mm (5 ft 6 in) Electrification DoubleLine 4 (Chengdu Metro) (216 words) [view diff] exact match in snippet view article
History Opened 26 December 2015; 8 years ago (2015-12-26) Technical Line length 43.3 km (26.91 mi) Number of tracks 2 Character Underground/ElevatedFerny Grove railway line (738 words) [view diff] exact match in snippet view article find links to article
Mitchelton, 1920 Dayboro Closed West of Ferny Grove, 1955 Technical Line length 13.535 km (8.410 mi) Track length 13.535 km (8.410 mi) Number of tracksBankura–Masagram line (646 words) [view diff] exact match in snippet view article find links to article
broad-gauge railway) Closed 1965 (as Bakura-Damodar Railway) Technical Line length Broad gauge: 120.3 km (75 mi) Track length Broad gauge: 120.3 km (75 mi)Ryōmō Line (425 words) [view diff] exact match in snippet view article find links to article
Stations 19 Service Operator(s) JR East History Opened 1889 Technical Line length 84.4 km (52.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Line 7 (Chengdu Metro) (166 words) [view diff] exact match in snippet view article
Peak) History Opened 6 December 2017; 6 years ago (2017-12-06) Technical Line length 38.61 km (23.99 mi) Number of tracks 2 Character Underground only TrackRamal de Rio Maior (111 words) [view diff] exact match in snippet view article find links to article
Overview Status closed Termini Vale de Santarém Espadanal mines Technical Line length 30.4 km (18.9 mi) Track gauge 1,668 mm (5 ft 5+21⁄32 in) Iberian gaugeHakata-Minami Line (295 words) [view diff] exact match in snippet view article find links to article
series History Opened April 1, 1990; 34 years ago (1990-04-01) Technical Line length 8.5 km (5.3 mi) Number of tracks Double-track Track gauge 1,435 mm (4 ft 8+1⁄2 in)Kansai Airport Line (278 words) [view diff] exact match in snippet view article find links to article
series EMU 271 series EMU 281 series EMU History Opened 1994 Technical Line length 11.1 km (6.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500 V DCSangla Hill–Kundian Branch Line (103 words) [view diff] exact match in snippet view article find links to article
Junction Kundian Junction Service Operator(s) Pakistan Railways Technical Line length 241 km (150 mi) Track gauge 1,676 mm (5 ft 6 in) Operating speed 70 km/hAunrihar–Jaunpur line (527 words) [view diff] exact match in snippet view article find links to article
WDG-4 WAP-4 WAP-7 History Opened 1904; 120 years ago (1904) Technical Line length 60 km (37 mi) Track gauge 1,676 mm (5 ft 6 in) Electrification DoubleNingbo–Taizhou–Wenzhou railway (473 words) [view diff] exact match in snippet view article find links to article
rail System China Railway High-speed Operator(s) CR Shanghai Technical Line length 275 km (171 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge ElectrificationHuairou–Miyun line (501 words) [view diff] exact match in snippet view article find links to article
History Opened 31 December 2017; 6 years ago (2017-12-31) Technical Line length 144.6 km (89.9 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speedSōtetsu Izumino Line (425 words) [view diff] exact match in snippet view article find links to article
rail Daily ridership 56,843 (2010) History Opened 1976–1999 Technical Line length 11.3 km (7.0 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500Meitetsu Kōwa Line (231 words) [view diff] exact match in snippet view article find links to article
Termini Ōtagawa Kōwa Stations 20 Service Type Commuter rail Technical Line length 28.8 km (17.9 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 280Mysore–Bangalore line (667 words) [view diff] exact match in snippet view article find links to article
History Opened 25 February 1882; 142 years ago (1882-02-25) Technical Line length 138.25 kilometres (85.90 mi) Number of tracks 2 Track gauge 1,676 mmLine 5 (Suzhou Rail Transit) (143 words) [view diff] exact match in snippet view article
Rail Transit Co., Ltd History Opened 29 June 2021; 3 years ago (2021-06-29) Technical Line length 44.1 km (27.4 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in)Peterborough–Lincoln line (660 words) [view diff] exact match in snippet view article find links to article
Super Sprinter Class 158 Express Sprinter Class 800 "Azuma" Technical Line length 24 mi (39 km) Number of tracks Two Track gauge 4 ft 8+1⁄2 in (1,435 mm)Shoranur–Cochin Harbour section (987 words) [view diff] exact match in snippet view article find links to article
WDG-4 History Opened 16 July 1902; 122 years ago (1902-07-16) Technical Line length 107 kilometres (66 mi) Number of tracks 2 Character Suburban and longCentral line (Mumbai Suburban Railway) (903 words) [view diff] exact match in snippet view article
million History Opened 16 April 1853; 171 years ago (1853-04-16) Technical Line length 180 km (110 mi) Character At Grade Track gauge 5 ft 6 in (1,676 mm) broadSørlandet Line (796 words) [view diff] exact match in snippet view article find links to article
El 18 History Opened 1871 (to Kongsberg) 1944 (completed) Technical Line length 528 Number of tracks Single or Double Character Long-haul passenger/freightPink Line (Delhi Metro) (761 words) [view diff] exact match in snippet view article
August 2021 (Trilokpuri Sanjay Lake – Mayur Vihar Pocket I) Technical Line length 59.24 km (36.81 mi) Character Underground and Elevated Track gauge 1Line 10 (CPTM) (190 words) [view diff] exact match in snippet view article
History Opened 16 February 1867; 157 years ago (1867-02-16) Technical Line length 35 km (22 mi) Character At-grade Track gauge 1,600 mm (5 ft 3 in) ElectrificationLine 4 (Changsha Metro) (103 words) [view diff] exact match in snippet view article
Type B History Opened 26 May 2019; 5 years ago (2019-05-26) Technical Line length 33.5 km (20.82 mi) Number of tracks 2 Character Underground Track gaugeOdakyū Enoshima Line (383 words) [view diff] exact match in snippet view article find links to article
rail History Opened 1 June 1974; 50 years ago (1 June 1974) Technical Line length 27.6 km (17.1 mi) Number of tracks Double-track Track gauge 1,067 mmLine 3 (Changsha Metro) (162 words) [view diff] exact match in snippet view article
Corporation History Opened 28 June 2020; 4 years ago (2020-06-28) Technical Line length 53.69 km (33.36 mi) Number of tracks 2 Character Underground Track gaugeWest Bengal State Electricity Transmission Company (437 words) [view diff] exact match in snippet view article find links to article
2009-10 among all state utilities. At the end of 2009-10, its transmission line length stood at over 11,450 ckt. km, growing at a CAGR of 6.5% from 2005-06Line 10 (Nanjing Metro) (165 words) [view diff] exact match in snippet view article
2014; 10 years ago (2014-07-01) Last extension 28 May 2022 Technical Line length 35.9 km (22.3 mi) Number of tracks 2 Character Underground Elevated (Xiaohang)Shintetsu Sanda Line (238 words) [view diff] exact match in snippet view article find links to article
10 Service Route number KB History Opened November 11, 1928 Technical Line length 12 km (7.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1500List of bicycle routes in North Carolina (941 words) [view diff] case mismatch in snippet view article find links to article
U.S. Bicycle Route 1 Carolina Connection Location SC State Line–VA State Line Length 200 mi (320 km)Line 4 (Qingdao Metro) (98 words) [view diff] exact match in snippet view article
History Opened 26 December 2022; 20 months ago (2022-12-26) Technical Line length 30.7 km (19.1 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8+1⁄2 in)Line 7 (CPTM) (76 words) [view diff] exact match in snippet view article
History Opened 16 February 1867; 157 years ago (1867-02-16) Technical Line length 62.7 km (39.0 mi) Character At-grade Track gauge 1,600 mm (5 ft 3 in)Keio Inokashira Line (561 words) [view diff] exact match in snippet view article find links to article
ago (1933-08-01) Last extension 1 April 1934; 90 years ago (1934-04-01) Technical Line length 12.7 km (7.9 mi) Number of tracks Double-track Track gauge 1,067 mm (3 ft 6 in)Lanzhou–Zhongchuan Airport intercity railway (395 words) [view diff] exact match in snippet view article find links to article
History Opened September 30, 2015; 8 years ago (2015-09-30) Technical Line length 61 km (38 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge MinimumXi'an–Baoji high-speed railway (103 words) [view diff] exact match in snippet view article find links to article
Operator(s) China Railway High-speed History Opened December 2013 Technical Line length 138 km (86 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge MinimumKent Downs line (616 words) [view diff] exact match in snippet view article find links to article
"Networker" Class 466 "Networker" Class 700 "Desiro City" Technical Line length 76 mi 17 ch (122.7 km) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standardKyoto Line (Kintetsu) (408 words) [view diff] exact match in snippet view article
History Opened 3 November 1928; 95 years ago (1928-11-03) Technical Line length 34.6 km (21.5 mi) Number of tracks Double-track Character Heavy railFredericksburg Line (287 words) [view diff] exact match in snippet view article find links to article
Operator(s) Virginia Railway Express History Opened July 20, 1992 Technical Line length 54 miles Character 2 track main line Track gauge 1,435 mm (4 ft 8+1⁄2 in)Xiong'an–Xinzhou high-speed railway (115 words) [view diff] exact match in snippet view article find links to article
Stations 13 Service Type High-speed rail System China Railway Technical Line length 342 km (213 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8+1⁄2 in)Metre (poetry) (7,792 words) [view diff] exact match in snippet view article
extent, but moves toward variations in line length. Han Dynasty poetry tended towards the variable line-length forms of the folk ballads and the MusicLine 7 (Hangzhou Metro) (288 words) [view diff] exact match in snippet view article
History Opened 30 December 2020; 3 years ago (2020-12-30) Technical Line length 47.48 km (29.50 mi) Character Underground Track gauge 1,435 mm (4 ft 8+1⁄2 in)Mito Line (355 words) [view diff] exact match in snippet view article find links to article
History Opened 16 January 1889; 135 years ago (16 January 1889) Technical Line length 50.2 km (31.2 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 20Line 4 (Nanjing Metro) (225 words) [view diff] exact match in snippet view article
History Opened January 18, 2017; 7 years ago (2017-01-18) Technical Line length 33.75 km (21.0 mi) Number of tracks 2 Character Underground (except elevatedHengyang–Liuzhou intercity railway (339 words) [view diff] exact match in snippet view article find links to article
Operator(s) China Railway High-speed History Opened 28 December 2013 Technical Line length 497.9 km (309 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Minimum radiusSeibu Haijima Line (477 words) [view diff] exact match in snippet view article find links to article
Termini Kodaira Haijima Stations 8 Service Type Commuter rail Technical Line length 14.3 km (8.9 mi) Number of tracks 2 (Single-tracked: from Tamagawa-JōsuiSagami Line (593 words) [view diff] exact match in snippet view article find links to article
Commuter rail Rolling stock E131-500 series History Opened 1921 Technical Line length 33.3 km (20.7 mi) Number of tracks Single track Track gauge 1,067 mmTehran Metro Line 5 (132 words) [view diff] exact match in snippet view article find links to article
March 7, 1999 (Initially) December 31, 2019 (Most recent) Technical Line length 67.5 km (41.9 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) ElectrificationBarauni–Katihar section (948 words) [view diff] exact match in snippet view article find links to article
Operator(s) East Central Railway, Northeast Frontier Railway Technical Line length 185 km (115 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationHowrah–Prayagraj–Mumbai line (863 words) [view diff] exact match in snippet view article find links to article
Itarsi Junction railway station, Katni History Opened 1870 Technical Line length Since 2004 2,160 km (1,342 mi). Before 2004 2,146 km (1,333 mi) NumberBase64 (3,772 words) [view diff] exact match in snippet view article find links to article
fixed length for Base64-encoded lines, but it does specify a maximum line length of 76 characters. Additionally, it specifies that any character outsideLine 4 (Nanjing Metro) (225 words) [view diff] exact match in snippet view article
History Opened January 18, 2017; 7 years ago (2017-01-18) Technical Line length 33.75 km (21.0 mi) Number of tracks 2 Character Underground (except elevatedMetre (poetry) (7,792 words) [view diff] exact match in snippet view article
extent, but moves toward variations in line length. Han Dynasty poetry tended towards the variable line-length forms of the folk ballads and the MusicNeiwan line (278 words) [view diff] exact match in snippet view article find links to article
Taiwan Railways Administration History Opened 11 September 1951 Technical Line length 27.9 km (17.3 mi) Number of tracks 2 (Hsinchu - Zhuzhong) 1 (ZhuzhongNanchang–Ganzhou high-speed railway (199 words) [view diff] exact match in snippet view article find links to article
Type High-speed rail Operator(s) China Railway Nanchang Group Technical Line length 422 km (262 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge MinimumKeisei Main Line (624 words) [view diff] exact match in snippet view article find links to article
History Opened 3 November 1912; 111 years ago (1912-11-03) Technical Line length 69.3 km (43.1 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeSkipton railway line (77 words) [view diff] exact match in snippet view article find links to article
passenger service History Opened Newtown – Linton 1890, Linton – Skipton 1916 Closed 1986 Technical Line length 55 km Number of tracks 1 (now removed)Odakyū Tama Line (471 words) [view diff] exact match in snippet view article find links to article
rail History Opened 1 June 1974; 50 years ago (1 June 1974) Technical Line length 10.6 km (6.6 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 555 mLine 9 (Hangzhou Metro) (301 words) [view diff] exact match in snippet view article
PM145 History Opened 10 July 2021; 3 years ago (2021-07-10) Technical Line length 29.45 km (18.30 mi) Number of tracks 2 Character Underground and ElevatedZhengzhou–Kaifeng intercity railway (461 words) [view diff] exact match in snippet view article find links to article
December 28, 2014 (2014-12-28) (Zhengzhou East-Songchenglu section) Technical Line length 50.33 km (31 mi) Number of tracks 2 (Double-track) Track gauge 1,435 mmMeitetsu Tokoname Line (269 words) [view diff] exact match in snippet view article find links to article
History Opened August 13, 1913 (1913-08-13) (entire line) Technical Line length 29.3 km (18.2 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Litang–Zhanjiang railway (441 words) [view diff] exact match in snippet view article find links to article
Zhanjiang Service Type Heavy rail History Opened 1 July 1955 Technical Line length 318.2 km (198 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeHefei–Bengbu high-speed railway (228 words) [view diff] exact match in snippet view article find links to article
High-speed Rolling stock CRH380A History Opened 16 October 2012 Technical Line length 130 km (81 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge OperatingHMS St Albans (1706) (165 words) [view diff] case mismatch in snippet view article
rebuild Class and type 1706 Establishment 50-gun fourth rate ship of the line Length 130 ft (39.6 m) (gundeck) Beam 35 ft (10.7 m) Depth of hold 14 ft (4Meitetsu Komaki Line (378 words) [view diff] exact match in snippet view article find links to article
7000 series (through service) Daily ridership 14,743 (FY2008) Technical Line length 20.6 km (12.80 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Lahore–Wagah Branch Line (131 words) [view diff] exact match in snippet view article find links to article
Railways Termini Lahore Junction Wagah Stations 6 Service Operator(s) Pakistan Railways Technical Line length 25 km (16 mi) Track gauge 1,676 mm (5 ft 6 in)Guruvayur–Thrissur spur line (370 words) [view diff] exact match in snippet view article find links to article
WAG-5 History Opened 9 January 1994; 30 years ago (1994-01-09) Technical Line length 23 kilometres (14 mi) Track length 90 km Number of tracks 1 CharacterMedway Valley line (1,026 words) [view diff] exact match in snippet view article find links to article
375 "Electrostar" Class 395 "Javelin" History Opened 1856 Technical Line length 21 miles 19 chains (34.18 km) Number of tracks 2 Track gauge 1,435 mmTaichung line (227 words) [view diff] exact match in snippet view article find links to article
Taiwan Railway Corporation History Opened 20 February 1908 Technical Line length 85.5 km (53.1 mi) Number of tracks 2 Track gauge 3 ft 6 in (1,067 mm)CDG Express (536 words) [view diff] exact match in snippet view article find links to article
stock Alstom Coradia Liner History Planned opening early 2027 Technical Line length 32 km (20 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeHarbin Metro (865 words) [view diff] exact match in snippet view article find links to article
Harbin Urban Rail Transit Construction Plan (2017-2022)". The planned line length is about 85 km, including 65 stations. According to updated news in 2023Kishigawa Line (400 words) [view diff] exact match in snippet view article find links to article
Owner Wakayama Electric Railway Locale Wakayama Stations 14 Technical Line length 14.3 km (8.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500Yinchuan–Xi'an high-speed railway (392 words) [view diff] exact match in snippet view article find links to article
Operator(s) China Railway High-speed History Opened 26 December 2020 Technical Line length 616.55 km (383.11 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) OperatingLight Blue Line (Bangkok) (338 words) [view diff] exact match in snippet view article
(Planned) Service System Bangkok Mass Rapid Transit Operator(s) Bangkok Metropolitan Administration Technical Line length 9.5 kilometers (5.9 mi) (est.)Data and information visualization (7,868 words) [view diff] exact match in snippet view article find links to article
process differences in line length than surface area, it may be more effective to use a bar chart (which takes advantage of line length to show comparison)Kongsvinger Line (461 words) [view diff] exact match in snippet view article find links to article
CargoNet Rolling stock Class 75 Rc Regina History Opened 1862 Technical Line length 115 km Number of tracks Single Character Commuter trains Freight TrackNarrow-gauge railways in Norway (114 words) [view diff] case mismatch in snippet view article find links to article
Line Length Opened Gauge Converted Notes Ålgård Line 12 km (7.5 mi) 1921 1,067 mm (3 ft 6 in) 1944 Branch of the Sørlandet Line Brevik Line 10 km (6.2 mi)Harbour line (Mumbai Suburban Railway) (1,126 words) [view diff] exact match in snippet view article
History Opened 12 December 1910; 113 years ago (1910-12-12) Technical Line length 73.84 km (45.88 mi) Character At grade and elevated Track gauge 5 ft 6 inNippori-Toneri Liner (902 words) [view diff] exact match in snippet view article find links to article
series, 330 series, 320 series History Opened 30 March 2008 Technical Line length 9.7 km (6.0 mi) Number of tracks 2 Track gauge 1,700 mm (5 ft 7 in) ElectrificationLGV Atlantique (602 words) [view diff] exact match in snippet view article find links to article
September 1989 (Paris–Le Mans) 25 September 1990 (full line) Technical Line length 232 km (144 mi) (main line) 52 km (32 mi) (western branch) Number ofSouth West Line, Chennai Suburban (117 words) [view diff] exact match in snippet view article find links to article
Operator(s) Southern Railway (India) Depot(s) Tambaram, Egmore Technical Line length 122.71 km Track gauge Broad Gauge Operating speed 90 km/h (maximum serviceLausanne–Bern railway (415 words) [view diff] exact match in snippet view article find links to article
train on the Grandfey Viaduct Overview Termini Lausanne Bern Technical Line length 97.2 km (60.4 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8+1⁄2 in)Ramal do Porto de Aveiro (82 words) [view diff] exact match in snippet view article find links to article
Bridge Overview Status Operational Termini Cacia Port of Aveiro Technical Line length 9 km (5.6 mi) Track gauge 1,668 mm (5 ft 5+21⁄32 in) Iberian gauge ElectrificationAtlantic Axis high-speed rail line (719 words) [view diff] exact match in snippet view article find links to article
Ridership 3.6 million (2017) History Opened 20 April 2015 Technical Line length 155.6 km (96.7 mi) Number of tracks Double track Track gauge 1,668 mmMaesteg Line (489 words) [view diff] exact match in snippet view article find links to article
DMUs History Opened 28 June 1866; 158 years ago (1866-06-28) Technical Line length 8 miles 29 chains (13.5 km) Number of tracks Single track Track gaugeLine 6 Branch (Shenzhen Metro) (303 words) [view diff] exact match in snippet view article
History Opened 28 November 2022; 21 months ago (2022-11-28) Technical Line length 6.13 km (3.8 mi) (Phase 1) 11.03 km (6.9 mi) (Phase 1 & Phase 2) NumberGaya–Pandit Deen Dayal Upadhyaya Junction section (761 words) [view diff] exact match in snippet view article find links to article
Service Operator(s) East Central Railway History Opened 1907 Technical Line length 197 km (122 mi) Number of tracks 2 Track gauge 5 ft 6 in (1,676 mm) broadNorth-link line (224 words) [view diff] exact match in snippet view article find links to article
Taiwan Railways Administration History Opened 1 February 1980 Technical Line length 79.2 km (49.2 mi) Number of tracks 2 Track gauge 3 ft 6 in (1,067 mm)Gotemba Line (522 words) [view diff] exact match in snippet view article find links to article
History Opened 1 February 1889; 135 years ago (1889-02-01) Technical Line length 60.2 km (37.4 mi) Number of tracks Entirely single-track Track gaugeBarauni–Guwahati line (1,059 words) [view diff] exact match in snippet view article find links to article
Central Railway, Northeast Frontier Railway History Opened 1950 Technical Line length 784 km (487 mi) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationSkitube Alpine Railway (1,135 words) [view diff] exact match in snippet view article find links to article
Services 3 per hour (peak season) History Opened 29 August 1988 Technical Line length 8.5 kilometres (5.3 mi) (Map) Number of tracks single track with passingTehran Metro Line 3 (290 words) [view diff] exact match in snippet view article find links to article
(Metro) Depot(s) Azadegan Depot History Opened December 16, 2012 Technical Line length 33.7 km (20.9 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) ElectrificationKeihan Ōtō Line (453 words) [view diff] exact match in snippet view article find links to article
Sanjō Demachiyanagi Stations 3 History Opened 5 October 1989 Technical Line length 2.3 km (1.4 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) ElectrificationLine 3 (Suzhou Rail Transit) (234 words) [view diff] exact match in snippet view article
Transit Co., Ltd History Opened 25 December 2019; 4 years ago (2019-12-25) Technical Line length 45.272 km (28.131 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in)Shintetsu Ao Line (250 words) [view diff] exact match in snippet view article find links to article
20 Service Type Heavy rail History Opened 28 December 1936 Technical Line length 29.2 km (18.1 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Line 3 (Nanjing Metro) (260 words) [view diff] exact match in snippet view article
Peak) History Opened 1 April 2015; 9 years ago (2015-04-01) Technical Line length 44.87 km (27.9 mi) Number of tracks 2 Character Elevated & undergroundHenbury Loop Line (756 words) [view diff] exact match in snippet view article find links to article
5 (0 in use) Service Type Heavy rail System National Rail Technical Line length 6 miles 39 chains (10.4 km) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standardCoryton Line (367 words) [view diff] exact match in snippet view article find links to article
for Wales Rail Rolling stock Class 150 DMUs Class 153 DMUs Technical Line length 5 miles 37 chains (8.8 km) Number of tracks Single track covering 6 stationsTōkyū Tamagawa Line (451 words) [view diff] exact match in snippet view article find links to article
History Opened 6 August 2000; 24 years ago (6 August 2000) Technical Line length 5.6 km (3.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500G.992.1 (3,004 words) [view diff] exact match in snippet view article find links to article
right summarise the speeds obtainable for each ADSL standard based on line length and attenuation. The second graph is of more importance since it is attenuationLanzhou (Xining)–Guangzhou corridor (361 words) [view diff] exact match in snippet view article
Type High-speed rail Operator(s) China Railway High-speed Technical Line length 2,106 km (1,309 mi) (Lanzhou - Guangzhou) Track gauge 1,435 mm (4 ft 8+1⁄2 in)Santiago Metro Line 8 (258 words) [view diff] exact match in snippet view article find links to article
Empresa de Transporte de Pasajeros Metro S.A. History Planned opening 2032 Technical Line length 19 km (12 mi) Number of tracks 2 Character UndergroundG.992.1 (3,004 words) [view diff] exact match in snippet view article find links to article
right summarise the speeds obtainable for each ADSL standard based on line length and attenuation. The second graph is of more importance since it is attenuationLanzhou (Xining)–Guangzhou corridor (361 words) [view diff] exact match in snippet view article
Type High-speed rail Operator(s) China Railway High-speed Technical Line length 2,106 km (1,309 mi) (Lanzhou - Guangzhou) Track gauge 1,435 mm (4 ft 8+1⁄2 in)Toden Arakawa Line (666 words) [view diff] exact match in snippet view article find links to article
Tram Company, Otsuka-ekimae - Asukayama) 1974 (Arakawa Line) Technical Line length 12.2 km (7.6 mi) Track gauge 1,372 mm (4 ft 6 in) Electrification 600Line 5 (Changsha Metro) (144 words) [view diff] exact match in snippet view article
Corporation History Opened 28 June 2020; 4 years ago (2020-06-28) Technical Line length 22.5 km (13.98 mi) Number of tracks 2 Character Underground Track gaugeKeihan Main Line (544 words) [view diff] exact match in snippet view article find links to article
Sanjō Service Depot(s) Neyagawa, Yodo History Opened 1910 Technical Line length 49.3 km (30.6 mi) Number of tracks 2 (Yodoyabashi - Temmabashi, NeyagawashiHenbury Loop Line (756 words) [view diff] exact match in snippet view article find links to article
5 (0 in use) Service Type Heavy rail System National Rail Technical Line length 6 miles 39 chains (10.4 km) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standardSahibganj loop (1,720 words) [view diff] exact match in snippet view article find links to article
Junction Service Operator(s) Eastern Railway History Opened 1866 Technical Line length 403.8 km (251 mi) Number of tracks 1/ 2 Track gauge 5 ft 6 in (1,676 mm)Tōkyū Tamagawa Line (451 words) [view diff] exact match in snippet view article find links to article
History Opened 6 August 2000; 24 years ago (6 August 2000) Technical Line length 5.6 km (3.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500Osaka Monorail Saito Line (216 words) [view diff] exact match in snippet view article find links to article
Station Saito-nishi Station Stations 5 Service Type Monorail Operator(s) Osaka Monorail Technical Line length 6.8 km (4.2 mi) Electrification 1,500 V DCLake Huron (3,357 words) [view diff] exact match in snippet view article find links to article
mark was eclipsed in January 2013. Lake Huron has the largest shore line length of any of the Great Lakes, counting its 30,000 islands. It is separatedStafford–Manchester line (376 words) [view diff] exact match in snippet view article find links to article
Civity Class 350 Desiro Class 390 Pendolino History Opened 1848 Technical Line length 53.9 miles (86.7 km) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeLine 16 (Shenzhen Metro) (172 words) [view diff] exact match in snippet view article
History Opened 28 December 2022; 20 months ago (2022-12-28) Technical Line length 29.2 km (18.14 mi) Character Underground Track gauge 1,435 mm (4 ft 8+1⁄2 in)Thorpdale railway line (57 words) [view diff] exact match in snippet view article find links to article
Type Victorian Railways passenger service History Opened 8 May 1888 Closed 4 December 1958 Technical Line length 18 km (11 mi) Number of tracks SingleBishan SkyShuttle (230 words) [view diff] exact match in snippet view article find links to article
Chongqing Rail Transit History Opened 16 April 2021; 3 years ago (2021-04-16) Technical Line length 15.4 km (9.6 mi) Operating speed 80 km/h (50 mph)Pachuria–Bhanga line (293 words) [view diff] exact match in snippet view article find links to article
(opened 1899, rebuilt 2014) Faridpur–Bhanga (26 January 2020) Technical Line length 62 km Track gauge Broad-gauge 1,676 mm (5 ft 6 in) Operating speed 80Hefei–Anqing–Jiujiang high-speed railway (191 words) [view diff] exact match in snippet view article find links to article
Type High-speed rail Operator(s) China Railway High-speed Technical Line length 340 km (211 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gauge OperatingShorkot–Sheikhupura Branch Line (247 words) [view diff] exact match in snippet view article find links to article
Pakistan Railways History Opened 1 March 1911 (1911-03-01) Technical Line length 218 km (135 mi) Track gauge 1,676 mm (5 ft 6 in) Operating speed 105 km/hYokohama Municipal Subway Green Line (418 words) [view diff] exact match in snippet view article find links to article
(FY2014) History Opened 30 March 2008; 16 years ago (2008-03-30) Technical Line length 13.0 km (8.1 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeParis Métro Line 2 (727 words) [view diff] exact match in snippet view article find links to article
Opened 13 December 1900; 123 years ago (13 December 1900) Technical Line length 12.4 km (7.7 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) ElectrificationMeitetsu Inuyama Line (351 words) [view diff] exact match in snippet view article find links to article
Daily ridership 57,443 (FY2008) History Opened 1910 (1910) Technical Line length 26.8 km (16.65 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1JR Tōzai Line (405 words) [view diff] exact match in snippet view article find links to article
2015) History Opened 8 March 1997; 27 years ago (1997-03-08) Technical Line length 12.5 km (7.8 mi) Number of tracks Double-track Track gauge 1,067 mm (3 ft 6 in)Manchester–Southport line (689 words) [view diff] exact match in snippet view article find links to article
National Rail Operator(s) Northern Trains History Opened 1855/1888 Technical Line length 35.75 miles Track gauge 4 ft 8+1⁄2 in (1,435 mm) standard gaugeLine 2 (Chongqing Rail Transit) (322 words) [view diff] exact match in snippet view article
Peak) History Opened 18 June 2005; 19 years ago (2005-06-18) Technical Line length 31.3 km (19.4 mi) Electrification 1,500 V DC third rail Operating speedXi'an–Chongqing high speed railway (328 words) [view diff] exact match in snippet view article find links to article
Wanzhou North Service Operator(s) China Railway High-speed Technical Line length 653 km (406 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) Operating speedDubai Trolley (399 words) [view diff] exact match in snippet view article find links to article
Emirates Service System Tram History Opened 2015 Closed 2019 Technical Line length 1.1 km (0.68 mi) (Phase I) 4.6 km (2.9 mi) (total) Track gauge 1,435 mmDatong–Zhangjiakou high-speed railway (244 words) [view diff] exact match in snippet view article find links to article
Operator(s) China Railway High-speed History Opened 30 December 2019 Technical Line length 141.524 km (87.939 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standardJōsō Line (406 words) [view diff] exact match in snippet view article find links to article
series steam train History Opened 1 November 1913 (1913-11-01) Technical Line length 51.1 km (31.8 mi) Number of tracks Single and double Character FairlyHaryana Orbital Rail Corridor (757 words) [view diff] exact match in snippet view article find links to article
Infrastructure Development Corporation Ridership 20,000 (projected) Technical Line length 121.7 km (75.6 mi) Track gauge 5 ft 6 in (1,676 mm) Broad gaugeTongi–Manikganj–Paturia Ghat line (250 words) [view diff] exact match in snippet view article find links to article
Junction railway station Paturia Ghat railway station Service Type Railway line Operator(s) East Zone Technical Line length 80 km Track gauge Dual gaugeÎle-de-France tramway Line 2 (501 words) [view diff] exact match in snippet view article find links to article
Opened 2 July 1997 (1997-07-02) Last extension 19 November 2012 Technical Line length 17.9 km (11.1 mi) Track gauge 1,435 mm (4 ft 8+1⁄2 in) standard gaugeWadamisaki Line (285 words) [view diff] exact match in snippet view article find links to article
Network Rolling stock 207 series History Opened 8 July 1890 Technical Line length 2.7 km (1.7 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500Edinburgh Airport Rail Link (838 words) [view diff] exact match in snippet view article find links to article
/ Airport rail link proposal System ScotRail/National Rail Technical Line length 14 kilometres (8.7 mi) Character Underground spurs linking existing railwayMinsterley branch line (347 words) [view diff] exact match in snippet view article find links to article
(Minsterley station) Stations 3 History Opened 1861 Closed 1967 Technical Line length 6.5 mi (10.5 km) Number of tracks 1 Track gauge 1,435 mm (4 ft 8+1⁄2 in)Oga Line (389 words) [view diff] exact match in snippet view article find links to article
EV-E801 series BEMU History Opened 9 November 1913 (1913-11-09) Technical Line length 26.4 km (16.4 mi) Number of tracks Entire line single tracked CharacterSoekarno–Hatta Airport Skytrain (384 words) [view diff] exact match in snippet view article find links to article
History Opened 17 September 2017; 6 years ago (2017-09-17) Technical Line length 3.05 km (1.90 mi) Electrification Third rail Operating speed 60 km/hGyeongjeon Line (2,356 words) [view diff] exact match in snippet view article find links to article
Gyeongjeon Line. By the mid-2000s, alignment modifications shortened the line length to 300.6 km (186.8 mi). The line is being upgraded to an electrifiedYilan line (224 words) [view diff] exact match in snippet view article find links to article
Operator(s) Taiwan Railways Administration History Opened 1924-11-30 Technical Line length 93.6 km (58.2 mi) Number of tracks 2 Track gauge 3 ft 6 in (1,067 mm)Jolarpettai–Shoranur line (732 words) [view diff] exact match in snippet view article find links to article
Rolling stock Indian Railways coaching stock History Opened 1861 Technical Line length 366 km (227 mi) (Main) Track gauge 5 ft 6 in (1,676 mm) broad gauge ElectrificationRamal do Canal de São Roque (84 words) [view diff] exact match in snippet view article find links to article
Roque Overview Status closed Termini Aveiro Canal de São Roque Technical Line length 30.4 km (18.9 mi) Track gauge 1,668 mm (5 ft 5+21⁄32 in) Iberian gaugeHanawa Line (162 words) [view diff] exact match in snippet view article find links to article
East Rolling stock KiHa 110 series DMU History Opened 1914 Technical Line length 106.9 km (66.4 mi) Number of tracks Entire line single tracked CharacterSeibu Tamako Line (430 words) [view diff] exact match in snippet view article find links to article
and Seibu 3000 series History Opened 1928[citation needed] Technical Line length 9.2 km (5.7 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in) ElectrificationColeraine railway line (183 words) [view diff] exact match in snippet view article find links to article
Junction Coleraine Connecting lines Portland Stations 5 History Opened 20 November 1888 Closed 12 September 1977 Technical Line length 37 km (23 mi)MRT Line 8 (Metro Manila) (576 words) [view diff] exact match in snippet view article
ridership 600,000 (projected) History Planned opening TBA Technical Line length 9.4 km (5.8 mi) Track length 18.8 km (11.7 mi) Number of tracks Double-trackQingyuan Maglev Tourist Line (452 words) [view diff] exact match in snippet view article find links to article
CRRC Changchun) History Commenced 2017 Planned opening 2024 Technical Line length 8.014 km (4.980 mi) Number of tracks 2 Character Fully elevated TrackLine 12 (CPTM) (203 words) [view diff] exact match in snippet view article
trains) History Opened 1 April 1934; 90 years ago (1934-04-01) Technical Line length 39 km (24 mi) Track gauge 1,600 mm (5 ft 3 in) Electrification 3,000Line 3 (Wuhan Metro) (408 words) [view diff] exact match in snippet view article
History Opened 28 December 2015; 8 years ago (2015-12-28) Technical Line length 33.2 km (20.63 mi) Number of tracks 2 Character Underground Track gaugeSōbu Line (Rapid) (587 words) [view diff] exact match in snippet view article
East Daily ridership 693,998 (daily 2015) History Opened 1972 Technical Line length 60.2 km (37.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1Carmelit (1,020 words) [view diff] exact match in snippet view article find links to article
History Opened October 6, 1959; 64 years ago (1959-10-06) Technical Line length 1.8 km (1.1 mi) Number of tracks 1 Character 1 Track gauge 1,980 mm (6 ft 6 in)Sagano Line (281 words) [view diff] exact match in snippet view article find links to article
years ago (1988-03-13) (Sagano Line name becomes first used) Technical Line length 34.2 km (21.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1