language:
Find link is a tool written by Edward Betts.searching for Advanced Passenger Train 12 found (112 total)
alternate case: advanced Passenger Train
British Rail Class 41 (HST)
(769 words)
[view diff]
exact match in snippet
view article
Centre and used in various high speed trials associated with the Advanced Passenger Train and InterCity 225 projects.[citation needed] In December 1990,Glasgow Shields Road TMD (862 words) [view diff] exact match in snippet view article find links to article
first expansion as British Rail decided to base the Class 370 Advanced Passenger Train at the depot. Part of the expansion saw the extension of the maintenanceClifton and Lowther railway station (819 words) [view diff] exact match in snippet view article find links to article
Clifton & Lowther Advanced Passenger Train southbound approaching the site of the station in 1986 General information Location Clifton, Westmorland andBritish Rail Mark 4 (1,804 words) [view diff] exact match in snippet view article find links to article
[citation needed] Many of these innovations came from the abandoned Advanced Passenger Train, upon which the Mark 4 was heavily based. This influence was mostDerby Works (3,575 words) [view diff] exact match in snippet view article find links to article
time was six electric non-driving motor coaches in 1977 for the Advanced Passenger Train formations. In 1964 British Railways established the British RailBritish Rail Mark 3 (4,559 words) [view diff] exact match in snippet view article find links to article
alternator unit with compound-wound motor and seating derived from the Advanced Passenger Train (APT). Ten coaches were constructed to run between a pair of ClassBritish Rail Class 90 (3,412 words) [view diff] exact match in snippet view article find links to article
East Coast Main Line (ECML) and the cancelled procurement of the Advanced Passenger Train (APT), which was at one point intended for the APT to be the nextBritish Rail Class 87 (3,960 words) [view diff] exact match in snippet view article find links to article
Main Line (ECML) and the ultimately-cancelled procurement of the Advanced Passenger Train (APT), (the latter being at one point intended to succeed the ClassBritish Rail corporate liveries (3,722 words) [view diff] exact match in snippet view article find links to article
routinely outshopped in this livery. Following the introduction of the Advanced Passenger Train in 1983, a similar livery to the APT's (dark grey on the upperNottingham direct line of the Midland Railway (3,237 words) [view diff] exact match in snippet view article find links to article
route for testing novel rolling stock, particularly the future Advanced Passenger Train. Negotiations for this use were protracted, but once the line finallyRace to the North (6,110 words) [view diff] exact match in snippet view article find links to article
length of the WCML between Euston and Glasgow with its experimental Advanced Passenger Train (APT). This record for the northbound run still stands, althoughSecond presidency of Lula da Silva (22,907 words) [view diff] case mismatch in snippet view article find links to article
transport, the newspaper Poder360 found that there are 7 most advanced passenger train projects, stretches averaging 100 km connecting municipalities