Find link

Find link is a tool written by Edward Betts.

searching for Line length 199 found (3609 total)

alternate case: line length

Line (unit) (528 words) [view diff] no match in snippet view article

Not to be confused with Paris line. The line or British line (abbreviated L or l) was a small English unit of length, variously reckoned as 1⁄10, 1⁄12
Sporveien T-banen (106 words) [view diff] exact match in snippet view article find links to article
Akershus. The company has 521 employees, and operates 217 metro cars with a line length of 103.9 km. A total of 63.5 million passengers used the rapid transit
Qingdao–Rongcheng Intercity Railway (913 words) [view diff] exact match in snippet view article find links to article
travels along the Shandong Peninsula connecting to Qingdao and Rongcheng. Line length is 298.842 km (186 mi) (containing a total length of sidings, spurs and
Fathom (1,338 words) [view diff] no match in snippet view article find links to article
This article is about the unit of length. For other uses, see Fathom (disambiguation). A fathom = 6 feet or 1.8288 metres, is a unit of length in the
Trams in Aachen (219 words) [view diff] exact match in snippet view article find links to article
At its maximum extent, its route length was 181.4 kilometers and its line length was 213.5 kilometers. In 1914, it was the fourth largest tramway network
Red Line (Washington Metro) (2,163 words) [view diff] exact match in snippet view article
Date Event Total number of stations Total line length (mi) Total line length (km) March 29, 1976 Line opens between Farragut North and Rhode Island Avenue
Quoted-printable (797 words) [view diff] exact match in snippet view article find links to article
"=" as an escape character. It also limits line length to 76, as some software has limits on line length. MIME defines mechanisms for sending other
Liuzhou–Nanning Intercity Railway (117 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Operator(s) China Railway High-speed Technical Line length 226 km (140 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Classical Chinese poetry forms (5,057 words) [view diff] exact match in snippet view article find links to article
poems: this includes such poetic characteristics as meter (such as, line length and number of lines), rhythm (for example, presence of caesuras, end-stopping
Chongqing–Wanzhou Intercity Railway (131 words) [view diff] exact match in snippet view article find links to article
Stations 7 Operation Operator(s) China Railway High-speed Technical Line length 248 km (154 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Operating
Seoul Subway Line 2 (596 words) [view diff] exact match in snippet view article find links to article
Seongsu Branch (5.4 km) and the Sinjeong Branch (6.0 km) for a total line length of 60.2 km. The Line 2 loop is the second longest subway loop in the
Cicero (typography) (160 words) [view diff] exact match in snippet view article
derived from pica) as font size measurement – alongside millimeters in countries using the metric system – for line length and paper size measurement.
Opisometer (269 words) [view diff] exact match in snippet view article find links to article
handle while this is done, the length of the line can be ascertained: line length = wheel circumference × teeth counted/teeth on wheel. In more sophisticated
Strophe (742 words) [view diff] exact match in snippet view article find links to article
also mean a structural division of a poem containing stanzas of varying line length. Strophic poetry is to be contrasted with poems composed line-by-line
Clerihew (961 words) [view diff] exact match in snippet view article find links to article
light. The rhyme scheme is AABB, and the rhymes are often forced. The line length and metre are irregular. Bentley invented the clerihew in school and
Transport in Serbia (345 words) [view diff] exact match in snippet view article find links to article
length: 4,093 km Line length: 3,809 km Main lines length: 1,768 km Length of other lines I and II category; 2,041 km Electrified line length: 1,279 km Narrow
Zhangjiakou–Hohot High-Speed Railway (200 words) [view diff] exact match in snippet view article find links to article
East Stations 7 Services 1 Operation Operator(s) China Railway High-speed Technical Line length 286.803 km (178 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Split (Unix) (191 words) [view diff] exact match in snippet view article
permit a maximum character count (instead of a line count), a maximum line length, how many incrementing characters in generated filenames, and whether
Ci (poetry) (1,317 words) [view diff] no match in snippet view article
base set of certain patterns, in fixed-rhythm, fixed-tone, and variable line-length formal types, or model examples: the rhythmic and tonal pattern of the
Beijing–Tangshan Intercity Railway (282 words) [view diff] exact match in snippet view article find links to article
and Fengrun. Finally it terminates at Tangshan Railway Station. Total line length of will be approximately 163 km, a total of seven stations, with a design
Nokogiriyama Ropeway (90 words) [view diff] exact match in snippet view article find links to article
capacity 41 Passengers per cabin Trip duration 3 min Technical features Line length 680 m (2,231 ft) No. of cables 3 Vertical Interval 223 m (732 ft) Maximum
Levitha (130 words) [view diff] exact match in snippet view article find links to article
a family with one child. The total area of the island is 9.2 square kilometres (4 sq mi) and its total coast line length is 34 kilometres (21 miles).
Akechidaira Ropeway (110 words) [view diff] exact match in snippet view article find links to article
Passengers per cabin, 2 cabins Trip duration 3 min Technical features Line length 300 m (984 ft) No. of cables 3 Operating speed 2.5 m/s Vertical Interval
Fu (poetry) (4,551 words) [view diff] exact match in snippet view article
their compositions. Fu poems employ alternating rhyme and prose, varying line length, close alliteration, onomatopoeia, loose parallelism, and extensive cataloging
Yuefu (952 words) [view diff] exact match in snippet view article find links to article
now lost folk ballad tunes; although, later, the five-character fixed-line length became common. However, as a term of classification yuefu has a certain
Green Line (Dubai Metro) (558 words) [view diff] exact match in snippet view article
extension from Dubai Healthcare City to Dubai Creek via Al Jaddaf, the line length became 22.5 kilometres (14.0 mi) long. According to Gulfnews (on 13.09
Beijing-Zhangjiakou Intercity Railway (458 words) [view diff] exact match in snippet view article find links to article
Stations 10 Services 1 Operation Operator(s) China Railway High-speed Technical Line length 173.947 km (108 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Chongqing–Lanzhou Railway (531 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Operator(s) China Railway High-speed Technical Line length 832 km (517 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Trams in Dresden (1,263 words) [view diff] exact match in snippet view article find links to article
As of 2008[update], the network comprised 12 tram lines, with a total line length of approximately 210 kilometres (130 mi) and a total route length of
Samsun Tram (250 words) [view diff] exact match in snippet view article find links to article
ending in the station, starting station of the University. SHRs main line length of 15,695 meters, 1,900 meters of warehouse space and the interior of
Hainan Western Ring High-Speed Railway (477 words) [view diff] exact match in snippet view article find links to article
Operation Opened 30 December 2015 Rolling stock CRH1A, CRH380A Technical Line length 344 kilometres (214 mi) No. of tracks FLUG Track gauge 1,435 mm (4 ft 8 1⁄2 in)
RS-422 (1,059 words) [view diff] exact match in snippet view article find links to article
standard, but is included for information purposes only.) Limitations on line length and data rate varies with the parameters of the cable length, balance
Jilin–Hunchun Intercity Railway (457 words) [view diff] exact match in snippet view article find links to article
Opened 30th September 2015 Operator(s) China Railway High-speed Technical Line length 359 km (223 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Minimum
Dresdner Verkehrsbetriebe (1,774 words) [view diff] exact match in snippet view article find links to article
operates the Dresden tram network comprising 12 tram lines, with a total line length of approximately 210 kilometres (130 mi) and a total route length of
Sierpiński arrowhead curve (326 words) [view diff] no match in snippet view article find links to article
order, double length, int angle) { if ( 0 == order ) { draw_line( length); } else { curve( order - 1, length / 2, - angle);
Sabari railway line (439 words) [view diff] exact match in snippet view article find links to article
Southern Railway zone Depot(s) Kollam Ernakulam Rolling stock 0-6-0 Technical Line length 120 km (75 mi) No. of tracks 1 Track gauge 1,676 mm (5 ft 6 in)
Nanchang–Jiujiang Intercity Railway (86 words) [view diff] exact match in snippet view article find links to article
Opened September 20, 2010 Operator(s) China Railway High-speed Technical Line length 131.27 km (82 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Aarhus Letbane (153 words) [view diff] exact match in snippet view article find links to article
(construction project) Operation Opened August 2016 Owner Midttrafik Technical Line length 107 km (66 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Tempe Streetcar (92 words) [view diff] exact match in snippet view article find links to article
(planned) Owner Valley Metro (Phoenix) Operator(s) Valley Metro Technical Line length 3.44 mi (6 km) Track gauge 4 ft 8 1⁄2 in (1,435 mm) standard gauge
S7 (Rhine-Main S-Bahn) (58 words) [view diff] exact match in snippet view article
Regio Depot(s) Frankfurt Hbf Rolling stock DBAG Class 430 Technical Line length 35.2 km (21.9 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Ferranti effect (221 words) [view diff] exact match in snippet view article find links to article
applied. The relative voltage rise is proportional to the square of the line length. The Ferranti effect is much more pronounced in underground cables, even
Kaeng Khoi Line (111 words) [view diff] exact match in snippet view article find links to article
Buri Stations 37 Operation Owner State Railway of Thailand Technical Line length 125.10 km (77.73 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in) metre gauge
Seibu Chichibu Line (206 words) [view diff] exact match in snippet view article find links to article
Stations 6 Operation Opened October 14, 1969 Owner Seibu Railway Technical Line length 19.0 km (11.8 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Keisei Higashi-Narita Line (98 words) [view diff] exact match in snippet view article find links to article
Higashi-Narita Stations 2 Operation Owner Keisei Electric Railway Technical Line length 4.4 mi (7.0 km) Track gauge 1,435 mm Electrification 1500 V DC
Threnodia Augustalis (464 words) [view diff] exact match in snippet view article find links to article
of the Greek lyric poet Pindar. The stanzas are irregular, and both line length and the rhyming pattern vary. Early editions misunderstood the pindaric
Keisei Kanamachi Line (157 words) [view diff] exact match in snippet view article find links to article
Operation Opened 21 October 1913 Owner Keisei Electric Railway Technical Line length 2.5 km (1.6 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius 160
Charles E. Leiserson (544 words) [view diff] exact match in snippet view article find links to article
are algorithms that have no tuning parameters for cache size or cache-line length, but nevertheless use cache near-optimally. He developed the Cilk language
Lhasa–Xigazê Railway (324 words) [view diff] exact match in snippet view article find links to article
Railway Station Operation Opened 16 August 2014 (2014-08-16) Technical Line length 253 km (157 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Keiō Dōbutsuen Line (93 words) [view diff] exact match in snippet view article find links to article
Tama-Dōbutsukōen Stations 2 Operation Opened 1964 Owner Keio Corporation Technical Line length 2.0 km (1.2 mi) No. of tracks 1 Track gauge 1,372 mm (4 ft 6 in) Electrification
Keiō Dōbutsuen Line (93 words) [view diff] exact match in snippet view article find links to article
Tama-Dōbutsukōen Stations 2 Operation Opened 1964 Owner Keio Corporation Technical Line length 2.0 km (1.2 mi) No. of tracks 1 Track gauge 1,372 mm (4 ft 6 in) Electrification
Paris Métro Line 18 (37 words) [view diff] exact match in snippet view article find links to article
Opened 2023-2030 Operator(s) RATP Conduction system Automated Technical Line length 50 km (31 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Paris Métro Line 17 (37 words) [view diff] exact match in snippet view article find links to article
Opened 2025-2030 Operator(s) RATP Conduction system Automated Technical Line length 25 km (16 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Xi'an–Chengdu High-Speed Railway (446 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Operator(s) China Railway High-speed Technical Line length 510 km (317 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Aŭtazavodskaja Line (87 words) [view diff] exact match in snippet view article find links to article
Avtozavodskaya Overview Stations 14 Operation Opened 1990 Owner Minsk Metro Technical Line length 18.1 km (11.2 mi) Track gauge 1,524 mm (5 ft)
Wenzhou–Fuzhou Railway (457 words) [view diff] exact match in snippet view article find links to article
Operation Owner China Railway Operator(s) China Railway High-speed Technical Line length 298.1 km (185 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Yamaman Yūkarigaoka Line (125 words) [view diff] exact match in snippet view article find links to article
Yūkarigaoka Line Yūkarigaoka Line carriages at Yūkarigaoka Station Line length: 4.1 km (2.5 mi) Voltage: 750 DC Legend
Haizhu Tram (167 words) [view diff] exact match in snippet view article find links to article
Guangzhou Metro Character At-grade Depot(s) Modiesha Stabling Yard Technical Line length 7.7 km (4.78 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Be Un Limited (1,696 words) [view diff] exact match in snippet view article find links to article
Mbit/s downstream and 1.9 Mbit/s upstream, subject to Annex M enablement, line length and quality, making BE's network the fastest mainstream, and first ADSL2+
Tobu Kameido Line (130 words) [view diff] exact match in snippet view article find links to article
April 1904 Owner Tobu Railway Rolling stock Tobu 8000 series Technical Line length 3.4 km (2.1 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 160 m
Ryūgasaki Line (158 words) [view diff] exact match in snippet view article find links to article
Ryūgasaki Stations 3 Operation Opened 1900 Owner Kantō Railway Technical Line length 4.5 km (2.8 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 207 m
Tianjin–Qinhuangdao High-Speed Railway (58 words) [view diff] exact match in snippet view article find links to article
2013 Operator(s) Tianjin-Qinhuangdao Railway PDL Co. Ltd. Technical Line length 261.2 km (162 mi) (main line) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard
Seibu Toshima Line (149 words) [view diff] exact match in snippet view article find links to article
Stations 2 Operation Opened 15 October 1927 Owner Seibu Railway Technical Line length 1.0 km (0.6 mi) No. of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Electrification
Kintetsu Yoshino Line (171 words) [view diff] exact match in snippet view article find links to article
Depot(s) Muda (branch depot of Furuichi Inspection Depot) Technical Line length 25.2 km (15.7 mi) No. of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Minimum
Over (cricket) (1,096 words) [view diff] no match in snippet view article
batsman out. For example, he may bowl the first few balls with the same line, length, or spin. He intends to tempt the batsman into scoring runs by providing
Keiō Keibajō Line (114 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1955 Owner Keio Corporation Depot(s) None Technical Line length 0.9 km Track gauge 1,372 mm (4 ft 6 in) Minimum radius 200 m Electrification
Kabe Line (784 words) [view diff] exact match in snippet view article find links to article
Operator: West Japan Railway Company (Class-1 railroad) Official line length: 14 km Gauge: 1,067 mm (3 ft 6 in) Double track: none (entirely single
Hengyang–Liuzhou Intercity Railway (154 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Operator(s) China Railway High-speed Technical Line length 497.9 km (309 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Kansai Airport Line (149 words) [view diff] exact match in snippet view article find links to article
223-2500 series EMU 225-5000 series EMU 281 series EMU Technical Line length 11.1 km (6.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Par (command) (154 words) [view diff] exact match in snippet view article
the fmt command. Par reformats paragraphs of text to fit into a given line length optimally, keeping prefixes and suffixes intact, which is useful for
Yellow Line (Baltimore) (478 words) [view diff] exact match in snippet view article
Columbia Town Center (South) Hunt Valley, Maryland (North) Operation Operator(s) Maryland Transit Administration Technical Line length 42 mi (67.6 km)
Tree crown measurement (4,447 words) [view diff] exact match in snippet view article find links to article
limb where it emerges from the trunk are then measured. The straight line length of the limb from trunk to tip can then be calculated using the Law of
Gothenburg tram network (814 words) [view diff] exact match in snippet view article find links to article
which serve twelve day-time and five night-time lines with a combined line length of 190 km. These figures are expected to increase when the second stage
Chengdu–Dujiangyan Intercity Railway (611 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Opened 12 May 2010 Operator(s) China Railway High-speed Technical Line length 94.2 km (59 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Maizuru Line (250 words) [view diff] exact match in snippet view article find links to article
Higashi-Maizuru Stations 6 Operation Opened 1904 Owner JR West Technical Line length 26.4 km (16.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Line 2 (Metro Bilbao) (263 words) [view diff] exact match in snippet view article
Operation Opened April 13, 2002 Operator(s) Metro Bilbao S.A. Technical Line length 20 km (12 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Line 1 (Metro Bilbao) (158 words) [view diff] exact match in snippet view article
Operation Opened November 11, 1995 Operator(s) Metro Bilbao S.A. Technical Line length 31 km (19 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Nanjing–Tianchang Intercity Railway (108 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1 August 2014 Character Underground and elevated Technical Line length 45.21 km (28.1 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 7, Shanghai Metro (263 words) [view diff] exact match in snippet view article find links to article
Character Underground Elevated(Luonan Xincun and Meilan Lake) Technical Line length 44.2 km (27.5 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
MIA Mover (512 words) [view diff] exact match in snippet view article find links to article
non-sterile areas of the airport Rolling stock Mitsubishi Crystal Mover vehicles Technical Line length 1.27 miles (2.04 km) Highest elevation Elevated
Shijiazhuang–Taiyuan high-speed railway (338 words) [view diff] exact match in snippet view article find links to article
2009 Owner China Railway Operator(s) China Railway High-speed Technical Line length 189 km (117 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Keihan Nakanoshima Line (248 words) [view diff] exact match in snippet view article find links to article
Company Operator(s) Keihan Electric Railway Depot(s) none Technical Line length 3.0 km (1.9 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Sestina (2,665 words) [view diff] exact match in snippet view article find links to article
Petrarch and Dante, was in hendecasyllables. Since then, changes to the line length have been a relatively common variant, such that Stephen Burt has written:
Jurong Region MRT Line (484 words) [view diff] exact match in snippet view article find links to article
Extension) Owner Land Transport Authority Operator(s) TBA Rolling stock TBA Technical Line length 20 km (12 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Minsheng-Xizhi Line (Taipei Metro) (112 words) [view diff] exact match in snippet view article
Opened planning Operator(s) Taipei Rapid Transit Corporation Character Underground, Elevated Depot(s) Xizhi Depot Technical Line length 17 km (10.6 mi)
Nanjing–Anqing Intercity Railway (516 words) [view diff] exact match in snippet view article find links to article
Termini Nanjing South Anqing Operation Opened 6 December 2015 Technical Line length 258 kilometres (160 mi) (main line) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Port Island Line (318 words) [view diff] exact match in snippet view article find links to article
Locale Kobe Termini Sannomiya Kobe Airport Stations 12 Operation Opened February 5, 1981 Owner Kobe New Transit Technical Line length 10.8 km (6.71 mi)
Hasantha Fernando (219 words) [view diff] no match in snippet view article find links to article
bowling was impressive. He was gentle in pace, but showed variation in line, length and style. He was the professional at Whitehaven Cricket Club in 2006
Abukuma Express Line (198 words) [view diff] exact match in snippet view article find links to article
Tsukinoki Stations 23 Operation Opened 1968 Owner Abukuma Express Technical Line length 54.9 km (34.1 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 500
U4 (Vienna U-Bahn) (84 words) [view diff] exact match in snippet view article
Hütteldorf Heiligenstadt Stations 20 Operation Opened 1976 Operator(s) Wiener Linien Technical Line length 16.5 km Track gauge 1,435 mm (4 ft 8 1⁄2 in)
U2 (Vienna U-Bahn) (76 words) [view diff] exact match in snippet view article
Termini Karlsplatz Seestadt Stations 20 Operation Opened 1980 Operator(s) Wiener Linien Technical Line length 16.7 km Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Shenyang–Dandong Intercity Railway (965 words) [view diff] exact match in snippet view article find links to article
7349 meters long. Bridges and tunnels together account for 80.5% of the line length. In early 2008 – The Liaoning provincial government put forward to
LGV Atlantique (390 words) [view diff] exact match in snippet view article find links to article
Mans Operation Opened 1989-1990 Owner RFF Operator(s) SNCF Technical Line length 232 km (144 mi) + 52 km (32 mi) (western branch) No. of tracks Double
Meitetsu Kōwa Line (85 words) [view diff] exact match in snippet view article find links to article
Termini Ōtagawa Kōwa Stations 19 Operation Owner Meitetsu Technical Line length 28.8 km (17.9 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 280
Elgeseter Line (194 words) [view diff] exact match in snippet view article find links to article
Trondheim Operator(s) Trondheim Sporvei Trondheim Trafikkselskap Technical Line length 2.5 km Track length 5.0 km No. of tracks Double Track gauge 1,000 mm
Poetry (10,297 words) [view diff] exact match in snippet view article find links to article
poem is normal; either way with the even numbered lines rhyming. The line length is scanned by according number of characters (according to the convention
Keisei Chiba Line (128 words) [view diff] no match in snippet view article find links to article
Station. At Chiba Chūō Station, the line is connected to the Chihara Line. Length: 12.9 km Gauge: 1,435 mm Electrification: 1,500 V DC The entire line
Ganzhou–Shenzhen High-Speed Railway (163 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Operator(s) China Railway High-speed Technical Line length 452 km (281 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Keikyū Kurihama Line (366 words) [view diff] exact match in snippet view article find links to article
Termini Horinouchi Misakiguchi Stations 8 Operation Owner Keikyu Technical Line length 13.4 km (8.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Karasuyama Line (377 words) [view diff] exact match in snippet view article find links to article
Opened 1923 Owner JR East Rolling stock KiHa 40 series DMU Technical Line length 20.4 km (12.7 mi) No. of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Electrification
Line 7, Shenzhen Metro (70 words) [view diff] exact match in snippet view article find links to article
(Shenzhen Metro Group) Character Underground and elevated Technical Line length 30.3 km (18.83 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 5, Guangzhou Metro (119 words) [view diff] exact match in snippet view article find links to article
Guangzhou Metro Corporation Character Underground and Elevated Technical Line length 31.9 km (19.82 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Keikyū Kurihama Line (366 words) [view diff] exact match in snippet view article find links to article
Termini Horinouchi Misakiguchi Stations 8 Operation Owner Keikyu Technical Line length 13.4 km (8.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Stavne–Leangen Line (1,075 words) [view diff] exact match in snippet view article find links to article
Railways Character Commuter trains Rolling stock Class 92 Technical Line length 5.8 km (3.6 mi) No. of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tōgane Line (312 words) [view diff] exact match in snippet view article find links to article
Narutō Stations 5 Operation Opened 1900 Operator(s) JR East Technical Line length 13.8 km (8.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
U4 (Frankfurt U-Bahn) (106 words) [view diff] exact match in snippet view article
Stadtwerke Frankfurt Rolling stock Siemens–Duewag U2, U3-Triebwagen Technical Line length 11.3 km (7.0 mi) 24 minutes (avg.) Operating speed 28.3 km/h (17.6 mph) average
Karasuyama Line (377 words) [view diff] exact match in snippet view article find links to article
Opened 1923 Owner JR East Rolling stock KiHa 40 series DMU Technical Line length 20.4 km (12.7 mi) No. of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Electrification
Keikyū Zushi Line (297 words) [view diff] exact match in snippet view article find links to article
Stations 4 Operation Opened April 1930 Owner Keikyu Depot(s) None Technical Line length 5.9 km (3.7 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Mihintale Line (159 words) [view diff] exact match in snippet view article find links to article
Mihintale Operation Opened 1993 Owner Sri Lanka Railways Operator(s) Sri Lanka Railways Technical Line length 7 mi (11 km) Track gauge 5 ft 6 in (1,676 mm)
Chengdu–Chongqing Intercity Railway (267 words) [view diff] exact match in snippet view article find links to article
China Railway High-speed Rolling stock China Railways CRH380D Technical Line length 307 km (191 mi) 307 km (191 mi) (main line) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Wakayama Line (193 words) [view diff] exact match in snippet view article find links to article
series, 103 series, 117 series, 221 series, 201 series EMUs Technical Line length 87.5 km (54.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Arnhem–Nijmegen railway (67 words) [view diff] exact match in snippet view article find links to article
station Operation Opened 1879 Operator(s) Nederlandse Spoorwegen Technical Line length 17 km (11 mi) No. of tracks double track Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Coastal Line (TRA) (128 words) [view diff] exact match in snippet view article
Administration Operator(s) Taiwan Railways Administration Technical Line length 90.2 km (56.0 mi) No. of tracks 2 Track gauge 3 ft 6 in (1,067 mm) Electrification
Line 1, Guangzhou Metro (125 words) [view diff] exact match in snippet view article find links to article
Guangzhou Metro Corporation Character Underground and At-grade Technical Line length 18.5 km (11.50 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Meitetsu Chita New Line (116 words) [view diff] exact match in snippet view article find links to article
Operation Opened June 5, 1980 (1980-06-05) Owner Meitetsu Technical Line length 13.9 km (8.64 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Gyeongwon Line (543 words) [view diff] exact match in snippet view article find links to article
1911–1914 Owner Korea Rail Network Authority Operator(s) Korail Technical Line length 94.4 km (58.7 mi) No. of tracks Double track (Yongsan–Dongducheon) Single
Lillesand–Flaksvand Line (1,194 words) [view diff] exact match in snippet view article find links to article
1896 Closed 1 July 1953 Owner A/S Lillesand–Flaksvandbanen Technical Line length 16.59 km (10.31 mi) Track length 18.15 km (11.28 mi) No. of tracks Single
Masada cableway (147 words) [view diff] exact match in snippet view article find links to article
Nature and Parks Authority Operator Israel Nature and Parks Authority Technical features Line length 0.9 km Operating speed 28.8 km/h Notes elevation 33 m
Meitetsu Chikkō Line (122 words) [view diff] exact match in snippet view article find links to article
Operation Opened January 15, 1924 (1924-01-15) Owner Meitetsu Technical Line length 1.5 km (0.9 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 160 m
Line 13, Guangzhou Metro (93 words) [view diff] exact match in snippet view article find links to article
Operation Owner City of Guangzhou Operator(s) Guangzhou Metro Corporation Technical Line length 27.0 km (16.8 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 8, Guangzhou Metro (174 words) [view diff] exact match in snippet view article find links to article
Operator(s) Guangzhou Metro Corporation Character Underground Technical Line length 14.8 km (9.20 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 11, Guangzhou Metro (93 words) [view diff] exact match in snippet view article find links to article
Operation Owner City of Guangzhou Operator(s) Guangzhou Metro Corporation Technical Line length 42.4 km (26.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Mangu Line (73 words) [view diff] exact match in snippet view article find links to article
1964 Owner Korea Rail Network Authority Operator(s) Korail Technical Line length 4.9 km (3.0 mi) No. of tracks Single track Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Sydbanen (41 words) [view diff] exact match in snippet view article find links to article
Rødbyhavn Stations 9 Operation Owner Banedanmark Operator(s) DSB Technical Line length 142.3 km (88.4 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Line 3, Nanjing Metro (87 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1 April 2015 Character Elevated/underground Technical Line length 44.1 km (27.4 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Røykenvik Line (105 words) [view diff] exact match in snippet view article find links to article
Operator(s) Norwegian State Railways Character Passenger and freight Technical Line length 7 km No. of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in)
U8 (Frankfurt U-Bahn) (50 words) [view diff] exact match in snippet view article
Stadtwerke Frankfurt Rolling stock U4-Triebwagen, U5-Triebwagen Technical Line length 12.1 km (7.5 mi) 25 minutes (avg.) Operating speed 29 km/h (18 mph) average
Hjelmslev transformation (488 words) [view diff] exact match in snippet view article find links to article
that there must exist a distinct angle of parallelism for any given line length. Let us say for the length AE, its angle of parallelism is angle BAF
Yahiko Line (221 words) [view diff] exact match in snippet view article find links to article
Higashi-Sanjō Yahiko Stations 8 Operation Opened 1916 Owner JR East Technical Line length 17.5 km (10.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Seibu Yūrakuchō Line (342 words) [view diff] exact match in snippet view article find links to article
Kotake-Mukaihara Stations 3 Operation Owner Seibu Railway Technical Line length 2.6 km (1.6 mi) No. of tracks 2 Track gauge 1,067 mm (3 ft 6 in) Electrification
Changsha Metro (190 words) [view diff] exact match in snippet view article find links to article
2010 and is expected to be completed in late 2014. Line 1 will have a line length of 23.55 kilometres (14.63 mi) with 20 stations, of which 1 is elevated
MIRC scripting language (1,359 words) [view diff] exact match in snippet view article find links to article
of plain text. This limit is imposed by mIRC's scripting parser's own line length limitation (unless assigning a binary variable) Globally accessible via
Hankyū Minoo Line (99 words) [view diff] exact match in snippet view article find links to article
Operation Operator(s) Hankyu Railway Depot(s) Hirai Depot Technical Line length 4.0 km (2.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Dandong–Dalian Intercity Railway (393 words) [view diff] exact match in snippet view article find links to article
Opened 17 December 2015 Operator(s) China Railway High-speed Technical Line length 292 km (181 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm) Operating speed
511 Bathurst (291 words) [view diff] exact match in snippet view article find links to article
Roncesvalles, Russell Rolling stock CLRV, ALRV, Flexity Outlook Technical Line length 6.47 km (4.02 mi) Track gauge 4 ft 10 7⁄8 in (1,495 mm) - TTC Gauge
U5 (Frankfurt U-Bahn) (53 words) [view diff] exact match in snippet view article
Operator(s) Stadtwerke Frankfurt Rolling stock Ptb-Triebwagen Technical Line length 7.6 km (4.7 mi) 21 minutes (avg.) Operating speed 21.7 km/h (13.5 mph) average
Skreia Line (128 words) [view diff] exact match in snippet view article find links to article
Operator(s) Norwegian State Railways Character Passenger and freight Technical Line length 21.97 km No. of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Solbergfoss Line (59 words) [view diff] exact match in snippet view article find links to article
Railways Operator(s) Norwegian State Railways Character Freight Technical Line length 7.9 km No. of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Mount Tsukuba Ropeway (113 words) [view diff] exact match in snippet view article find links to article
capacity 70 Passengers per cabin, 2 cabins Trip duration 6 min Technical features Line length 1.3 kilometres (0.8 mi) Vertical Interval 298 m (978 ft)
Line 21, Guangzhou Metro (85 words) [view diff] exact match in snippet view article find links to article
Operation Owner City of Guangzhou Operator(s) Guangzhou Metro Corporation Technical Line length 60.9 km (37.8 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tsuyama Line (217 words) [view diff] exact match in snippet view article find links to article
Okayama Tsuyama Operation Opened 21 December 1898 Owner JR West Technical Line length 58.7 km (36.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Treviglio–Cremona railway (97 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1863 (1863) Owner RFI Operator(s) Trenord Technical Line length 65 km (40 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Chengdu–Mianyang–Leshan Intercity Railway (335 words) [view diff] exact match in snippet view article find links to article
Stations 21 Operation Operator(s) China Railway High-speed Technical Line length 314 km (195 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Tōbu Utsunomiya Line (232 words) [view diff] exact match in snippet view article find links to article
Railway Rolling stock Tobu 350 series, Tobu 8000 series EMUs Technical Line length 24.3 km (15.1 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Vestmarka Line (71 words) [view diff] exact match in snippet view article find links to article
Operator(s) Norwegian State Railways Character Passenger and freight Technical Line length 14.25 kilometres (9 mi) No. of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Sagami Railway Izumino Line (117 words) [view diff] exact match in snippet view article find links to article
56,843 (2010) Operation Opened 1976-99 Owner Sagami Railway Technical Line length 11.3 km (7.0 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Utrecht–Kampen railway (72 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1863-1865 Operator(s) Nederlandse Spoorwegen Technical Line length 101 km (63 mi) No. of tracks Utrecht–Zwolle double track, Zwolle–Kampen
Harbin–Jiamusi Intercity Railway (202 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Operator(s) China Railway High-speed Technical Line length 353 km (219 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
502 Downtowner (256 words) [view diff] exact match in snippet view article find links to article
Toronto Transit Commission Depot(s) Russell Rolling stock CLRV Technical Line length 9.38 km (5.83 mi) Track gauge 4 ft 10 7⁄8 in (1,495 mm) - TTC Gauge
Meitetsu Takehana Line (166 words) [view diff] exact match in snippet view article find links to article
Line at Meitetsu Operation Opened 1921 Owner Nagoya Railroad Technical Line length 10.3 km (6.40 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Overhead
Kishin Line (208 words) [view diff] exact match in snippet view article find links to article
Rolling stock KiHa 40 series, KiHa 120, KiHa 122/127 series Technical Line length 158.1 km (98.2 mi) Track gauge 1,067 mm (3 ft 6 in) Operating speed 100 km/h
Ui LRT (136 words) [view diff] exact match in snippet view article find links to article
Termini Ui Sinseol-dong Stations 13 Operation Opened 2016 (planned) Technical Line length 11.4 km (7.1 mi) No. of tracks 2 Operating speed 70~80 km/h
Treviglio–Cremona railway (97 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1863 (1863) Owner RFI Operator(s) Trenord Technical Line length 65 km (40 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Tōbu Utsunomiya Line (232 words) [view diff] exact match in snippet view article find links to article
Railway Rolling stock Tobu 350 series, Tobu 8000 series EMUs Technical Line length 24.3 km (15.1 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Regulated verse (900 words) [view diff] exact match in snippet view article find links to article
line length is fixed at five or seven or characters per line; although, there are some poems which have a six character line-length. The line length is
Maroochydore railway line (281 words) [view diff] exact match in snippet view article find links to article
Maroochydore line Overview Website queenslandrail.com.au Technical Line length 0 km (0 mi) Track length 109 km (68 mi) Track gauge 3 ft 6 in (1,067 mm)
Line 2, Dongguan Rail Transit (305 words) [view diff] exact match in snippet view article find links to article
Transit Corporation, Limited Character Underground and elevated Technical Line length 37.7 km (23.43 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tehran Metro Line 5 (102 words) [view diff] exact match in snippet view article find links to article
Suburban Railways Organization (Metro) Depot(s) Tehran-West Depot Technical Line length 39.4 km (24.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
U3 (Frankfurt U-Bahn) (50 words) [view diff] exact match in snippet view article
Verkehrsgesellschaft Frankfurt Depot(s) Heddernheim Rolling stock U4, U5 Technical Line length 19.3 km (12.0 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Hefei–Fuzhou High-Speed Railway (614 words) [view diff] exact match in snippet view article find links to article
Operation Opened 2015 Operator(s) China Railway High-speed Technical Line length 813 km (505 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Line 4, Guangzhou Metro (172 words) [view diff] exact match in snippet view article find links to article
Guangzhou Metro Corporation Character Underground and Elevated Technical Line length 43.7 km (27.15 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Yeoju Line (94 words) [view diff] exact match in snippet view article find links to article
Construction Termini Pangyo Yeoju Stations 11 Operation Opened 2016 (planned) Technical Line length 53.8 km (33.4 mi) or 54.8 km (34.1 mi) No. of tracks 2
Hafslund Line (98 words) [view diff] exact match in snippet view article find links to article
Halfslund Operator(s) Hafslund Smelteverk Character Freight Technical Line length 5.5 km No. of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Keisei Chihara Line (317 words) [view diff] exact match in snippet view article find links to article
Chiharadai Stations 6 Operation Opened April 1, 1992 Owner Keisei Electric Railway Technical Line length 10.9 km (6.8 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 3, Tianjin Metro (91 words) [view diff] exact match in snippet view article find links to article
Metro Corporation Character Underground, At-grade, & Elevated Technical Line length 30.755 km (19.11 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Seibu Sayama Line (188 words) [view diff] exact match in snippet view article find links to article
Seibu-Kyūjō-mae Stations 3 Operation Opened 1929 Owner Seibu Railway Technical Line length 4.2 km (2.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Seibu Kokubunji Line (354 words) [view diff] exact match in snippet view article find links to article
Seibu 101 series, Seibu 2000 series, and Seibu 3000 series Technical Line length 7.8 km (4.8 mi) No. of tracks 1 (1.2 km double-tracked) Track gauge 1
Comm (588 words) [view diff] exact match in snippet view article find links to article
read lines with the function readlinebuffer() which does not impose any line length limits if system memory suffices. Other implementations read lines with
Chongqing−Lichuan Railway (539 words) [view diff] exact match in snippet view article find links to article
Stations 9 Operation Operator(s) China Railway High-speed Technical Line length 259.5 km (161 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Kintetsu Namba Line (198 words) [view diff] exact match in snippet view article find links to article
March 15, 1970 (1970-03-15) Operator(s) Kintetsu Corporation Technical Line length 2.0 km (1.2 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
U1 (Frankfurt U-Bahn) (50 words) [view diff] exact match in snippet view article
Verkehrsgesellschaft Frankfurt Depot(s) Heddernheim Rolling stock U4, U5 Technical Line length 12.3 km (7.6 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Tehran Metro Line 3 (280 words) [view diff] exact match in snippet view article find links to article
Suburban Railways Organization (Metro) Depot(s) Azadegan Depot Technical Line length 38 km (24 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification Third
SAR Riyadh-Qurayyat Line (63 words) [view diff] exact match in snippet view article find links to article
trainsets and 2 thirteen-car trainsets of CAF Push-pull train Technical Line length 1,380 kilometres (857.5 mi) Track length 2,750 kilometres (1,708.8 mi)
Han poetry (3,045 words) [view diff] exact match in snippet view article find links to article
shi poetry, as the later development of the yuehfu into regular, fixed-line length forms makes it difficult to distinguish in form from the shi form of
Paris Métro Line 7bis (211 words) [view diff] exact match in snippet view article find links to article
Stations 8 Operation Opened 1967 Rolling stock MF 88 3 carriages per trainset Technical Line length 3.1 km (1.9 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Seibu Seibu-en Line (146 words) [view diff] exact match in snippet view article find links to article
Stations 2 Operation Opened 5 April 1930 Owner Seibu Railway Technical Line length 2.4 km (1.5 mi) No. of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Minimum
Meitetsu Hashima Line (106 words) [view diff] exact match in snippet view article find links to article
Website Meitetsu Operation Opened 1982 Owner Nagoya Railroad Technical Line length 1.3 km (0.81 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Overhead
Empirical theory of perception (2,922 words) [view diff] exact match in snippet view article find links to article
realm of biology. Consider, for example, the case of the distance and line length. When light reflected from a linear object falls on the retina, the object
Tobu Daishi Line (202 words) [view diff] exact match in snippet view article find links to article
December 1931 Owner Tobu Railway Rolling stock Tobu 8000 series Technical Line length 1.0 km (0.62 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Wells Harbour Railway (474 words) [view diff] exact match in snippet view article find links to article
called at: 2 Stations operated: 2 Route km operated: 1.1 Website: Official website Technical Line length: 1,200 yards (1.1 km) Gauge: 10 1⁄4 in (260 mm)
Daegok–Sosa Line (270 words) [view diff] exact match in snippet view article find links to article
(素砂-大谷線) Sosa-Daegokseon Status Planned Termini Daegok Sosa Stations 5 ~ 8 Operation Opened 2021 (planned) Technical Line length 18.36 km (11.41 mi)
Sakurai Line (251 words) [view diff] exact match in snippet view article find links to article
series EMU, 105 series EMU, 201 series EMU, 221 series EMU Technical Line length 29.4 km (18.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Suphan Buri Line (111 words) [view diff] exact match in snippet view article find links to article
16 Operation Opened June 16, 1963 Owner State Railway of Thailand Technical Line length 78 km (48 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in) metre gauge
South-Link Line (219 words) [view diff] exact match in snippet view article find links to article
Administration Operator(s) Taiwan Railways Administration Technical Line length 98.2 km (61.0 mi) No. of tracks 1 Track gauge 3 ft 6 in (1,067 mm) Operating
U2 (Frankfurt U-Bahn) (51 words) [view diff] exact match in snippet view article
Verkehrsgesellschaft Frankfurt Depot(s) Heddernheim Rolling stock U4, U5 Technical Line length 16.6 km (10.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Ube Line (288 words) [view diff] exact match in snippet view article find links to article
Termini Shin-Yamaguchi Ube Stations 18 Operation Owner JR West Technical Line length 33.2 km (20.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Kronberg Railway (419 words) [view diff] exact match in snippet view article find links to article
Kronberg–Frankfurt-Rödelheim Overview Locale Hesse Line number 3615 Technical Line length 9.5 km (5.9 mi) No. of tracks 2 (Rödelheim–Niederhöchstadt) Track gauge
Hankyū Itami Line (151 words) [view diff] exact match in snippet view article find links to article
Operation Operator(s) Hankyu Railway Depot(s) Nishinomiya Depot Technical Line length 3.1 km (1.9 mi) No. of tracks Double Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Sagano Line (292 words) [view diff] exact match in snippet view article find links to article
Termini Kyoto Sonobe Operation Opened 1988 (1897) Owner JR West Technical Line length 34.2 km (21.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Inbi Line (163 words) [view diff] exact match in snippet view article find links to article
Tottori Tsuyama Stations 19 Operation Opened 1919 Owner JR West Technical Line length 73.4 km (45.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Xi'an–Baoji High-Speed Railway (89 words) [view diff] exact match in snippet view article find links to article
Opened December 2013 Operator(s) China Railway High-speed Technical Line length 138 km (86 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Minimum
Jinshan Railway (236 words) [view diff] exact match in snippet view article find links to article
Operator(s) Jinshan Railway Co. Ltd. Character Commuter Rail Technical Line length 56.4 km (35.05 mi) No. of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Kanmon Tunnel (572 words) [view diff] exact match in snippet view article find links to article
Honshu-Kyushu Operation Opened 1942 Operator JR Kyushu Character Passenger and freight Technical Line length 3,604 m (11,824 ft)/ 3,614 m (11,857 ft)
S9 (Rhine-Main S-Bahn) (139 words) [view diff] exact match in snippet view article
DB Regio Depot(s) Frankfurt Hbf Rolling stock DB Class 420 Technical Line length 66.1 km (41.1 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Limes Railway (365 words) [view diff] exact match in snippet view article find links to article
Niederhöchstadt–Bad Soden Overview Locale Hesse Line number 3641 Technical Line length 5.2 km (3.2 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Guiyang–Kaiyang Intercity Railway (171 words) [view diff] exact match in snippet view article find links to article
Operation Opened May 1, 2015 Operator(s) China Railway High-speed Technical Line length 62 km (39 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Operating
TCDD District 1 (125 words) [view diff] exact match in snippet view article find links to article
Turkish State Railways Operator(s) Turkish State Railways Technical Line length 876 km (544 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm) Electrification
Kongsvinger Line (355 words) [view diff] exact match in snippet view article find links to article
Character Commuter trains Freight Rolling stock BM 69 Rc Regina Technical Line length 115 km No. of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Line 2, Chongqing Rail Transit (177 words) [view diff] exact match in snippet view article find links to article
Peak) Operation Opened 18 June 2005 Operator(s) Chongqing Rail Transit Corp., Ltd Rolling stock Hitachi Monorail Technical Line length 29.9 km (18.6 mi)
Edirne Cut-off (95 words) [view diff] exact match in snippet view article find links to article
(Kapıkule-Svilengrad) Depot(s) Edirne Yard, Kapıkule Yard Technical Line length 80 km (50 mi) No. of tracks 1 Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard