Find link

langauge:

Find link is a tool written by Edward Betts.

searching for Line length 543 found (4005 total)

alternate case: line length

Sporveien T-banen (106 words) [view diff] exact match in snippet view article find links to article

Akershus. The company has 521 employees, and operates 217 metro cars with a line length of 103.9 km. A total of 63.5 million passengers used the rapid transit
Fathom (1,457 words) [view diff] no match in snippet view article find links to article
This article is about the unit of length. For other uses, see Fathom (disambiguation). A fathom is a unit of length in the imperial and the U.S. customary
Qingdao–Rongcheng Intercity Railway (971 words) [view diff] exact match in snippet view article find links to article
travels along the Shandong Peninsula connecting to Qingdao and Rongcheng. Line length is 298.842 km (186 mi) (containing a total length of sidings, spurs and
Line (unit) (510 words) [view diff] no match in snippet view article
Not to be confused with Paris line. The line (abbreviated L or l) was a small English unit of length, variously reckoned as  1⁄10,  1⁄12,  1⁄16, or  1⁄40
Seoul Subway Line 2 (595 words) [view diff] exact match in snippet view article find links to article
Seongsu Branch (5.4 km) and the Sinjeong Branch (6.0 km) for a total line length of 60.2 km. The Line 2 loop is the second longest subway loop in the
Trams in Aachen (223 words) [view diff] exact match in snippet view article find links to article
At its maximum extent, its route length was 181.4 kilometers and its line length was 213.5 kilometers. In 1914, it was the fourth largest tramway network
Circle MRT Line (Klang Valley) (300 words) [view diff] exact match in snippet view article
Corporation Sdn Bhd Conduction system Automated and driverless Technical Line length 0 km (0 mi)Elevated: 0 km (0 mi) Underground: 0 km (0 mi) Track gauge
Ryūgasaki Line (158 words) [view diff] exact match in snippet view article find links to article
Ryūgasaki Stations 3 Operation Opened 1900 Owner Kantō Railway Technical Line length 4.5 km (2.8 mi) Track gauge 1,067 mm (3 ft 6 in) Old gauge 762 mm (2 ft 6 in)
Île-de-France tramway Line 2 (187 words) [view diff] exact match in snippet view article find links to article
Opened 1997 (1997) (last extension in 2012) Rolling stock Alstom Citadis Technical Line length 17.9 km (11.1 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Strophe (745 words) [view diff] exact match in snippet view article find links to article
also mean a structural division of a poem containing stanzas of varying line length. Strophic poetry is to be contrasted with poems composed line-by-line
Liuzhou–Nanning Intercity Railway (117 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Operator(s) China Railway High-speed Technical Line length 226 km (140 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Chongqing–Wanzhou Intercity Railway (125 words) [view diff] exact match in snippet view article find links to article
Opened November 29, 2016 Operator(s) China Railway High-speed Technical Line length 248 km (154 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Classical Chinese poetry forms (5,058 words) [view diff] exact match in snippet view article find links to article
poems: this includes such poetic characteristics as meter (such as, line length and number of lines), rhythm (for example, presence of caesuras, end-stopping
Clerihew (970 words) [view diff] exact match in snippet view article find links to article
them. The rhyme scheme is AABB, and the rhymes are often forced. The line length and metre are irregular. Bentley invented the clerihew in school and
Bangalore–Arsikere–Hubli line (39 words) [view diff] exact match in snippet view article find links to article
Owner Indian Railway Operator(s) South Western Railway zone Technical Line length 469 km (291 mi) Number of tracks 1/2 Track gauge 1,676 mm (5 ft 6 in)
Ci (poetry) (1,325 words) [view diff] no match in snippet view article
base set of certain patterns, in fixed-rhythm, fixed-tone, and variable line-length formal types, or model examples: the rhythmic and tonal pattern of the
Quoted-printable (909 words) [view diff] exact match in snippet view article find links to article
"=" as an escape character. It also limits line length to 76, as some software has limits on line length. MIME defines mechanisms for sending other
Line 9, Shanghai Metro (375 words) [view diff] exact match in snippet view article find links to article
1 Metro Operation Co. Ltd. Character Underground, Elevated Technical Line length 51.7 km (32.12 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Regulated verse (895 words) [view diff] exact match in snippet view article find links to article
line length is fixed at five or seven or characters per line; although, there are some poems which have a six character line-length. The line length is
Transport in Serbia (275 words) [view diff] exact match in snippet view article find links to article
length: 4,093 km Line length: 3,809 km Main lines length: 1,768 km Length of other lines I and II category; 2,041 km Electrified line length: 1,279 km Narrow
Beijing–Tangshan Intercity Railway (286 words) [view diff] exact match in snippet view article find links to article
and Fengrun. Finally it terminates at Tangshan Railway Station. Total line length of will be approximately 163 km, a total of seven stations, with a design
Santa Fe Western Railway (266 words) [view diff] exact match in snippet view article find links to article
SF Cruz Alta Services 1 Operation Opened 1883 Closed 1900; 116 years ago (1900) Technical Line length 120 km (75 mi) Track gauge 1,676 mm (5 ft 6 in)
Yuefu (953 words) [view diff] exact match in snippet view article find links to article
now lost folk ballad tunes; although, later, the five-character fixed-line length became common. However, as a term of classification yuefu has a certain
Tashkent–Samarkand high-speed rail line (669 words) [view diff] exact match in snippet view article find links to article
Uzbekistan Railways Character Passenger Rolling stock Talgo 250 Technical Line length 344 km (214 mi) Track gauge 1,520 mm (4 ft 11 27⁄32 in) Russian gauge
Green Line (Dubai Metro) (558 words) [view diff] exact match in snippet view article
extension from Dubai Healthcare City to Dubai Creek via Al Jaddaf, the line length became 22.5 kilometres (14.0 mi) long. According to Gulfnews (on 13.09
Guiyang–Kaiyang Intercity Railway (175 words) [view diff] exact match in snippet view article find links to article
Operation Opened May 1, 2015 Operator(s) China Railway High-speed Technical Line length 62 km (39 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 250 km/h
Hainan Western Ring High-Speed Railway (464 words) [view diff] exact match in snippet view article find links to article
Operation Opened 30 December 2015 Rolling stock CRH1A, CRH380A Technical Line length 344 kilometres (214 mi) Number of tracks FLUG Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tōbu Kiryū Line (213 words) [view diff] exact match in snippet view article find links to article
Akagi Stations 8 Operation Opened May 1911 Owner Tobu Railway Technical Line length 20.3 km (12.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Trams in Dresden (1,273 words) [view diff] exact match in snippet view article find links to article
As of 2008[update], the network comprised 12 tram lines, with a total line length of approximately 210 kilometres (130 mi) and a total route length of
Red Line (Washington Metro) (2,197 words) [view diff] exact match in snippet view article
Date Event Total number of stations Total line length (mi) Total line length (km) March 29, 1976 Line opens between Farragut North and Rhode Island Avenue
Cicero (typography) (160 words) [view diff] exact match in snippet view article
derived from pica) as font size measurement – alongside millimeters in countries using the metric system – for line length and paper size measurement.
Split (Unix) (191 words) [view diff] exact match in snippet view article
permit a maximum character count (instead of a line count), a maximum line length, how many incrementing characters in generated filenames, and whether
Haldibari–New Jalpaiguri line (480 words) [view diff] exact match in snippet view article find links to article
Owner Indian Railway Operator(s) Northeast Frontier Railway Technical Line length 58 kilometres (36 mi) Track gauge 1,676 mm (5 ft 6 in) broad gauge
Charles E. Leiserson (544 words) [view diff] exact match in snippet view article find links to article
are algorithms that have no tuning parameters for cache size or cache-line length, but nevertheless use cache near-optimally. He developed the Cilk language
Dresdner Verkehrsbetriebe (1,777 words) [view diff] exact match in snippet view article find links to article
operates the Dresden tram network comprising 12 tram lines, with a total line length of approximately 210 kilometres (130 mi) and a total route length of
Nokogiriyama Ropeway (90 words) [view diff] exact match in snippet view article find links to article
capacity 41 Passengers per cabin Trip duration 3 min Technical features Line length 680 m (2,231 ft) No. of cables 3 Vertical Interval 223 m (732 ft) Maximum
Base64 (3,162 words) [view diff] exact match in snippet view article find links to article
fixed length for Base64-encoded lines, but it does specify a maximum line length of 76 characters. Additionally it specifies that any extra-alphabetic
Opisometer (269 words) [view diff] exact match in snippet view article find links to article
handle while this is done, the length of the line can be ascertained: line length = wheel circumference × teeth counted/teeth on wheel. In more sophisticated
Wenzhou–Fuzhou Railway (459 words) [view diff] exact match in snippet view article find links to article
Operation Owner China Railway Operator(s) China Railway High-speed Technical Line length 298.1 km (185 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
RS-422 (1,168 words) [view diff] exact match in snippet view article find links to article
standard, but is included for information purposes only.) Limitations on line length and data rate varies with the parameters of the cable length, balance
Tsuyama Line (217 words) [view diff] exact match in snippet view article find links to article
Okayama Tsuyama Operation Opened 21 December 1898 Owner JR West Technical Line length 58.7 km (36.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Hefei–Fuzhou High-Speed Railway (615 words) [view diff] exact match in snippet view article find links to article
Owner China Railways Operator(s) China Railway High-speed Technical Line length 813 km (505 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Tarumi Line (334 words) [view diff] exact match in snippet view article find links to article
Tarumi Line A "Haimo 230" railbus with exterior livery designed by Masuo Ikeda Technical Line length 34.5 km (21.4 mi) Track gauge 1,067 mm (3 ft 6 in)
Par (command) (154 words) [view diff] exact match in snippet view article
the fmt command. Par reformats paragraphs of text to fit into a given line length optimally, keeping prefixes and suffixes intact, which is useful for
Sotobō Line (572 words) [view diff] exact match in snippet view article find links to article
27 Operation Opened 1896 Operator(s) JR East Depot(s) Chiba Technical Line length 93.3 km (58.0 mi) Track gauge 1,067 mm (3 ft 6 in) Operating speed 110 km/h
Be Un Limited (1,774 words) [view diff] exact match in snippet view article find links to article
Mbit/s downstream and 1.9 Mbit/s upstream, subject to Annex M enablement, line length and quality, making BE's network the fastest mainstream, and first ADSL2+
HMS Devonshire (1745) (92 words) [view diff] case mismatch in snippet view article
characteristics Class and type: 1741 proposals 66-gun third rate ship of the line Length: 161 ft (49.1 m) (gundeck) Beam: 46 ft (14.0 m) Depth of hold: 19 ft
Tree crown measurement (4,457 words) [view diff] exact match in snippet view article find links to article
limb where it emerges from the trunk are then measured. The straight line length of the limb from trunk to tip can then be calculated using the Law of
RER B (796 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1977 (last extension in 1994) Rolling stock MI 79, MI 84 Technical Line length 80.0 km (49.7 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Green Line (Yokohama) (228 words) [view diff] exact match in snippet view article
Municipal Subway Depot(s) Kawawa Rolling stock 10000 series Technical Line length 13.0 km Track gauge 1,435 mm Electrification 1,500 V DC, overhead Operating
Gothenburg tram network (824 words) [view diff] exact match in snippet view article find links to article
which serve twelve day-time and five night-time lines with a combined line length of 190 km. These figures are expected to increase when the second stage
Grey Line (Bangkok Rapid Transit) (695 words) [view diff] exact match in snippet view article
Bridge Stations 21 (planned) Operation Owner BMA Operator(s) BMA Technical Line length 26 kilometers (16 mi) (est.) Operating speed 80 km/h (50 mph) ?
Leaves of Grass (3,876 words) [view diff] exact match in snippet view article find links to article
exception, the poems do not rhyme or follow standard rules for meter and line length. Among the poems in the collection are "Song of Myself", "I Sing the
Guntur–Tenali section (160 words) [view diff] exact match in snippet view article find links to article
1916 Owner Indian Railway Operator(s) South Central Railway Technical Line length 24.27 km (15.08 mi) Track length 44 km (27 mi) Number of tracks 1 Track
Kabe Line (784 words) [view diff] exact match in snippet view article find links to article
Operator: West Japan Railway Company (Class-1 railroad) Official line length: 14 km Gauge: 1,067 mm (3 ft 6 in) Double track: none (entirely single
Debashish Mohanty (321 words) [view diff] no match in snippet view article find links to article
fast bowler India has produced ever.He gained fame for his accurate line, length and ability to swing the ball both the ways. Cricket Archive – profile
Nanchang–Jiujiang Intercity Railway (86 words) [view diff] exact match in snippet view article find links to article
Opened September 20, 2010 Operator(s) China Railway High-speed Technical Line length 131.27 km (82 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Soft tennis (270 words) [view diff] case mismatch in snippet view article find links to article
Line Name Line Length Base Line for Singles 8.23 m Base Line for Doubles 10.97 m Side Line for Singles 23.77 m Side Line for Doubles 23.77 m Service Line
Kronberg Railway (419 words) [view diff] exact match in snippet view article find links to article
Kronberg–Frankfurt-Rödelheim Overview Locale Hesse Line number 3615 Technical Line length 9.5 km (5.9 mi) Number of tracks 2 (Rödelheim–Niederhöchstadt) Track
Elgeseter Line (194 words) [view diff] exact match in snippet view article find links to article
Trondheim Operator(s) Trondheim Sporvei Trondheim Trafikkselskap Technical Line length 2.5 km Track length 5.0 km Number of tracks Double Track gauge 1,000 mm
Mysore–Chamarajanagar branch line (230 words) [view diff] exact match in snippet view article find links to article
Krishnarajapuram Rolling stock WDM-2 WDM-3A WDP-4D WDP-4 WDG-3A WDG-4 Technical Line length 61 kilometres (38 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in)
Shenyang–Dandong Intercity Railway (965 words) [view diff] exact match in snippet view article find links to article
7349 meters long. Bridges and tunnels together account for 80.5% of the line length. In early 2008 – The Liaoning provincial government put forward to
Sydbanen (41 words) [view diff] exact match in snippet view article find links to article
Gedser, Rødbyhavn Stations 9 Operation Owner Banedanmark Operator(s) DSB Technical Line length 142.3 km (88.4 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Ishizuchi Tozan Ropeway (109 words) [view diff] exact match in snippet view article find links to article
cabin, 2 cabins Trip duration 7 minutes 30 seconds Technical features Line length 1.8 kilometres (1.1 mi) No. of cables 3 Operating speed 5.0 m/s Vertical
Kongsvinger Line (355 words) [view diff] exact match in snippet view article find links to article
Character Commuter trains Freight Rolling stock BM 69 Rc Regina Technical Line length 115 km Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Keisei Higashi-Narita Line (109 words) [view diff] exact match in snippet view article find links to article
Higashi-Narita Stations 2 Operation Owner Keisei Electric Railway Technical Line length 7.1 km (4.4 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius 360
Keiō Dōbutsuen Line (93 words) [view diff] exact match in snippet view article find links to article
Tama-Dōbutsukōen Stations 2 Operation Opened 1964 Owner Keio Corporation Technical Line length 2.0 km (1.2 mi) Number of tracks 1 Track gauge 1,372 mm (4 ft 6 in) Electrification
Nanjing–Anqing Intercity Railway (516 words) [view diff] exact match in snippet view article find links to article
Termini Nanjing South Anqing Operation Opened 6 December 2015 Technical Line length 258 kilometres (160 mi) (main line) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Seibu Chichibu Line (206 words) [view diff] exact match in snippet view article find links to article
Stations 6 Operation Opened October 14, 1969 Owner Seibu Railway Technical Line length 19.0 km (11.8 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Grand Paris Express (1,573 words) [view diff] exact match in snippet view article find links to article
Stations 36 Operation Opened 2020-2030 Operator(s) RATP Conduction system Automated Technical Line length 75 km (47 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Keisei Kanamachi Line (157 words) [view diff] exact match in snippet view article find links to article
Operation Opened 21 October 1913 Owner Keisei Electric Railway Technical Line length 2.5 km (1.6 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius 160
LGV Rhône-Alpes (398 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1992-1994 Owner SNCF Réseau Operator(s) SNCF Technical Line length 115 km (71 mi) Number of tracks Double track Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Newline (3,750 words) [view diff] exact match in snippet view article find links to article
considered a feature or a nuisance depending on the application. Fixed line length was used by some early mainframe operating systems. In such a system
Sierpiński arrowhead curve (326 words) [view diff] no match in snippet view article find links to article
order, double length, int angle) { if ( 0 == order ) { draw_line( length); } else { curve( order - 1, length / 2, - angle);
MIRC scripting language (1,359 words) [view diff] exact match in snippet view article find links to article
of plain text. This limit is imposed by mIRC's scripting parser's own line length limitation (unless assigning a binary variable) Globally accessible via
Chengdu–Chongqing Intercity Railway (275 words) [view diff] exact match in snippet view article find links to article
China Railway High-speed Rolling stock China Railways CRH380D Technical Line length 307 km (191 mi) 307 km (191 mi) (main line) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Krishna Canal–Guntur section (90 words) [view diff] exact match in snippet view article find links to article
ago (1966) Owner Indian Railway Operator(s) South Central Railway Technical Line length 25.36 km (15.76 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in)
Keisei Chihara Line (317 words) [view diff] exact match in snippet view article find links to article
Chiharadai Stations 6 Operation Opened April 1, 1992 Owner Keisei Electric Railway Technical Line length 10.9 km (6.8 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Ishinomaki Line (329 words) [view diff] exact match in snippet view article find links to article
Kogota Onagawa Stations 14 Operation Opened 1912 Owner JR East Technical Line length 44.9 km (27.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Devonshire Street Tunnel (63 words) [view diff] exact match in snippet view article find links to article
Devonshire Street Tunnel Overview Location Sydney central business district Operation Opened 1906 Owner RailCorp Technical Line length 300 metres
Tobu Kameido Line (201 words) [view diff] exact match in snippet view article find links to article
April 1904 Owner Tobu Railway Rolling stock Tobu 8000 series Technical Line length 3.4 km (2.1 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 160 m
Bairabi Sairang Railway (278 words) [view diff] exact match in snippet view article find links to article
Target 2019 Locale Mizoram, India Website http://www.indianrailways.gov.in Technical Line length 84.25 km (52.35 mi) Track gauge 5 ft 6 in (1,676 mm)
G Line (RTD) (409 words) [view diff] exact match in snippet view article
Transportation District Operator(s) Denver Transit Partners Technical Line length 11.2 miles (18.0 km) Track gauge 4 ft 8 1⁄2 in (1,435 mm) standard gauge
Santahar–Kaunia line (387 words) [view diff] exact match in snippet view article find links to article
Services 2 Operation Opened 1878 Owner Bangladesh Railway Technical Line length ? Number of tracks ? Track gauge Metre gauge 1,000 mm (3 ft 3 3⁄8 in)
Kaeng Khoi Line (111 words) [view diff] exact match in snippet view article find links to article
Lamphong Sara Buri Stations 37 Operation Owner State Railway of Thailand Technical Line length 125.10 km (77.73 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in)
Yamaman Yūkarigaoka Line (139 words) [view diff] exact match in snippet view article find links to article
Yūkarigaoka Line Yūkarigaoka Line carriages at Yūkarigaoka Station Line length: 4.1 km (2.5 mi) Voltage: 750 DC Legend
Jurong Region MRT Line (508 words) [view diff] exact match in snippet view article find links to article
2030 (West Coast Extension) Owner Land Transport Authority Operator(s) TBA Technical Line length 20 km (12 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Meitetsu Kakamigahara Line (207 words) [view diff] exact match in snippet view article find links to article
Meitetsu-Gifu Shin-Unuma Stations 18 Operation Owner Meitetsu Technical Line length 17.6 km (10.94 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Shijiazhuang–Wuhan High-Speed Railway (457 words) [view diff] exact match in snippet view article find links to article
Status operational Locale China Operation Operator(s) China Railway High-speed Technical Line length 840 km (522 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Alna Line (1,060 words) [view diff] exact match in snippet view article find links to article
Administration Operator(s) CargoNet, Cargolink Character Freight Technical Line length 4.3 km (2.7 mi) Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Threnodia Augustalis (464 words) [view diff] exact match in snippet view article find links to article
of the Greek lyric poet Pindar. The stanzas are irregular, and both line length and the rhyming pattern vary. Early editions misunderstood the pindaric
Guangzhou–Shenzhen–Hong Kong Express Rail Link (4,159 words) [view diff] exact match in snippet view article find links to article
Railway Station and ends at Shenzhen Futian Railway Station, it is 116 km line length, with a design speed of 350 km / h. From there it travels south to Qingsheng
Seibu Toshima Line (149 words) [view diff] exact match in snippet view article find links to article
Stations 2 Operation Opened 15 October 1927 Owner Seibu Railway Technical Line length 1.0 km (0.6 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Electrification
Port Island Line (325 words) [view diff] exact match in snippet view article find links to article
Locale Kobe Termini Sannomiya Kobe Airport Stations 12 Operation Opened February 5, 1981 Owner Kobe New Transit Technical Line length 10.8 km (6.71 mi)
Keiō Keibajō Line (114 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1955 Owner Keio Corporation Depot(s) None Technical Line length 0.9 km Track gauge 1,372 mm (4 ft 6 in) Minimum radius 200 m Electrification
Tianjin–Qinhuangdao High-Speed Railway (58 words) [view diff] exact match in snippet view article find links to article
Opened 1st Dec, 2013 Operator(s) China Railway High-speed Technical Line length 261.2 km (162 mi) (main line) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Tehran Metro Line 5 (100 words) [view diff] exact match in snippet view article find links to article
Suburban Railways Organization (Metro) Depot(s) Tehran-West Depot Technical Line length 41 km (25 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 25
Keiō Keibajō Line (114 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1955 Owner Keio Corporation Depot(s) None Technical Line length 0.9 km Track gauge 1,372 mm (4 ft 6 in) Minimum radius 200 m Electrification
Yoshino Line (166 words) [view diff] exact match in snippet view article find links to article
Depot(s) Muda (branch depot of Furuichi Inspection Depot) Technical Line length 25.2 km (15.7 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in)
Chongqing−Lichuan Railway (541 words) [view diff] exact match in snippet view article find links to article
Stations 9 Operation Operator(s) China Railway High-speed Technical Line length 259.5 km (161 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Itō Line (447 words) [view diff] exact match in snippet view article find links to article
Type Passenger Termini Atami Itō Stations 6 Operation Opened 1935 Operator(s) JR East Technical Line length 16.9 km Track gauge 1,067 mm (3 ft 6 in)
Ventura County Line (896 words) [view diff] exact match in snippet view article find links to article
Operator(s) Metrolink Character Elevated and surface-level Technical Line length 70.9 miles (114.1 km) (average length between stations: 6.445 miles)
Akechidaira Ropeway (110 words) [view diff] exact match in snippet view article find links to article
Passengers per cabin, 2 cabins Trip duration 3 min Technical features Line length 300 m (984 ft) No. of cables 3 Operating speed 2.5 m/s Vertical Interval
Han poetry (3,049 words) [view diff] exact match in snippet view article find links to article
shi poetry, as the later development of the yuehfu into regular, fixed-line length forms makes it difficult to distinguish in form from the shi form of
Pagidipalli–Nallapadu section (108 words) [view diff] exact match in snippet view article find links to article
1930 Owner Indian Railway Operator(s) South Central Railway Technical Line length 238.49 km (148 mi) Track length 130 km (81 mi) Number of tracks 1 Track
Line 1 (Taipei Metro) (287 words) [view diff] exact match in snippet view article
Depot Rolling stock Matra VAL 256, Bombardier Innovia APM 256 Technical Line length 25.7 km (16.0 mi) Track gauge 1,880 mm (6 ft 2 in) Electrification Third
Ikaho Ropeway (389 words) [view diff] exact match in snippet view article find links to article
Japan Operator City of Shibukawa Technical features Aerial lift type Aerial tramway Line length 0.499 km (0.310 mi) Notes 182 m (597 ft) Electric motor
Chengdu–Mianyang–Leshan Intercity Railway (335 words) [view diff] exact match in snippet view article find links to article
Stations 21 Operation Operator(s) China Railway High-speed Technical Line length 314 km (195 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Chord Line, Tamil Nadu (501 words) [view diff] exact match in snippet view article find links to article
Operator(s) Southern Railway zone Depot(s) Villupuram Golden Rock Technical Line length 178 km (111 mi) Track gauge 1,676 mm (5 ft 6 in) Old gauge 1,000 mm (3 ft 3 3⁄8 in)
LGV Atlantique (409 words) [view diff] exact match in snippet view article find links to article
Mans Operation Opened 1989-1990 Owner RFF Operator(s) SNCF Technical Line length 232 km (144 mi) + 52 km (32 mi) (western branch) Number of tracks Double
Carmelit (714 words) [view diff] exact match in snippet view article find links to article
Character 1 Rolling stock 4 Von Roll funicular cars 2 per train Technical Line length 1.8 km (1.1 mi) Number of tracks 1 Track gauge 1,980 mm (6 ft 6 in)[discuss]
Zhengzhou–Jiaozuo Intercity Railway (201 words) [view diff] exact match in snippet view article find links to article
Opened June 26, 2015 Operator(s) China Railway High-speed Technical Line length 77.786 km (48 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Fuzhou–Xiamen Railway (878 words) [view diff] exact match in snippet view article find links to article
Operation Owner China Railway Operator(s) China Railway High-speed Technical Line length 274.9 km (171 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Kansai Airport Line (149 words) [view diff] exact match in snippet view article find links to article
223-2500 series EMU 225-5000 series EMU 281 series EMU Technical Line length 11.1 km (6.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
French ship Conquérant (1812) (131 words) [view diff] case mismatch in snippet view article
General characteristics Class and type: Bucentaure-class Type: ship of the line Length: 55.88 m (183.33 ft) (overall) 53.92 m (176.90 ft) (keel) Beam: 15
Llobregat–Anoia Line (1,695 words) [view diff] exact match in snippet view article find links to article
formed. It also includes several freight branches, accounting for a total line length of 138 kilometres (86 mi) and 41 passenger stations. Barcelona Metro
Kawagoe Line (912 words) [view diff] exact match in snippet view article find links to article
Stations 11 Operation Opened 1940 Owner JR East Depot(s) Kawagoe Technical Line length 30.6 km (19.0 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Changchun–Jilin Intercity Railway (264 words) [view diff] exact match in snippet view article find links to article
Opened January 11, 2011 Operator(s) China Railway High-speed Technical Line length 111 km (69 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 250 km/h
HMS Eagle (1745) (460 words) [view diff] case mismatch in snippet view article
1767 General characteristics Class and type: Fourth rate ship of the line Length: 147 ft (44.8 m) (gundeck) Beam: 42 ft (12.8 m) Depth of hold: 18 ft
Yellow Line (Baltimore) (478 words) [view diff] exact match in snippet view article
Columbia Town Center (South) Hunt Valley, Maryland (North) Operation Operator(s) Maryland Transit Administration Technical Line length 42 mi (67.6 km)
Negishi Line (817 words) [view diff] exact match in snippet view article find links to article
Opened 1872 Owner JR East Operator(s) JR East, JR Freight Technical Line length 22.1 km (13.7 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
S7 (Rhine-Main S-Bahn) (60 words) [view diff] exact match in snippet view article
Regio Depot(s) Frankfurt Hbf Rolling stock DBAG Class 430 Technical Line length 35.2 km (21.9 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Senmō Main Line (593 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1924 Operator(s) Hokkaido Railway Company Technical Line length 166,2 km Track gauge 1,067 mm (3 ft 6 in) Operating speed 80 km/h (50 mph)
Keisei Chiba Line (128 words) [view diff] no match in snippet view article find links to article
Station. At Chiba Chūō Station, the line is connected to the Chihara Line. Length: 12.9 km Gauge: 1,435 mm Electrification: 1,500 V DC The entire line
4 ft 6 in gauge railway (1,227 words) [view diff] no match in snippet view article find links to article
instead. The Toden Arakawa Line. Length: 12.2 km (7.6 mi). Only surviving line of Tokyo municipal tram. The Tōkyū Setagaya Line. Length: 5.0 km (3.1 mi). Another
Eaglehawk–Inglewood railway line (84 words) [view diff] exact match in snippet view article find links to article
Eaglehawk - Inglewood Overview Type Branch Status Freight only line Operation Opened 1876 Technical Line length 50 kilometres Number of tracks 1
Inchicore railway station (136 words) [view diff] exact match in snippet view article find links to article
Éireann Operator(s) Iarnród Éireann Rolling stock DART EMUs Technical Line length 7.6 km Number of tracks 2 Track gauge 1,600 mm (5 ft 3 in) Irish gauge
Oxford and Rugby Railway (304 words) [view diff] exact match in snippet view article find links to article
Owner Great Western Railway Operator(s) Great Western Railway Technical Line length 50.5 miles (81.3 km)[citation needed] Number of tracks 2 Track gauge
Xiamen–Shenzhen Railway (578 words) [view diff] exact match in snippet view article find links to article
Operation Owner China Railway Operator(s) China Railway High-speed Technical Line length 502.4 km (312 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Mysore–Bangalore railway line (472 words) [view diff] exact match in snippet view article find links to article
Rolling stock WDM-2 WDM-3A WDP-4D WDP-4 WDG-3A WDG-4 WDM3D Technical Line length 138.25 kilometres (85.90 mi) Number of tracks 1 Track gauge 1,676 mm
Margin (typography) (1,501 words) [view diff] case mismatch in snippet view article
Retrieved 2 November 2014.  Franz, Laura. "Size Matters: Balancing Line Length And Font Size In Responsive Web Design". Smashing Magazine. Retrieved
U1 (Hamburg U-Bahn) (345 words) [view diff] exact match in snippet view article
transit System Hamburg U-Bahn Stations 46 Operation Opened 1 December 1914 Technical Line length 55.383 km (34.413 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Data visualization (3,643 words) [view diff] exact match in snippet view article find links to article
process differences in line length than surface area, it may be more effective to use a bar chart (which takes advantage of line length to show comparison)
Keikyū Kurihama Line (366 words) [view diff] exact match in snippet view article find links to article
Termini Horinouchi Misakiguchi Stations 9 Operation Owner Keikyu Technical Line length 13.4 km (8.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Baoji–Lanzhou High-Speed Railway (261 words) [view diff] exact match in snippet view article find links to article
Opened 2017 (projected) Operator(s) China Railway High-speed Technical Line length 401 km (249 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Maizuru Line (250 words) [view diff] exact match in snippet view article find links to article
Higashi-Maizuru Stations 6 Operation Opened 1904 Owner JR West Technical Line length 26.4 km (16.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Hankyū Minoo Line (99 words) [view diff] exact match in snippet view article find links to article
Operation Operator(s) Hankyu Railway Depot(s) Hirai Depot Technical Line length 4.0 km (2.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
U2 (Hamburg U-Bahn) (291 words) [view diff] exact match in snippet view article
transit System Hamburg U-Bahn Stations 25 Operation Opened 21 October 1913 Technical Line length 24.543 km (15.250 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Chengdu–Dujiangyan Intercity Railway (614 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Opened 12 May 2010 Operator(s) China Railway High-speed Technical Line length 94.2 km (59 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Norristown High Speed Line (2,031 words) [view diff] exact match in snippet view article find links to article
separated) Rolling stock 26 ASEA (Asea Brown Boveri) Type N-5 MU Technical Line length 13.4 mi (21.6 km) Number of tracks 1–3 Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Greenbush Line (1,944 words) [view diff] exact match in snippet view article find links to article
(modern use) Operator(s) Keolis North America Character Elevated and surface-level Technical Line length 27.6 miles Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Eastern Line (Thailand) (523 words) [view diff] exact match in snippet view article
Operation Opened 24 January 1907 Owner State Railway of Thailand Depot(s) Makkasan depot Technical Line length 255 km (158 mi) Track gauge 1,000 mm
Hampton Court Branch Line (292 words) [view diff] exact match in snippet view article find links to article
Opened 1849 Owner Network Rail Operator(s) South West Trains Technical Line length 1.54 miles (2.48 km) (1 mi 51 chains) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Over (cricket) (1,106 words) [view diff] no match in snippet view article
batsman out. For example, he may bowl the first few balls with the same line, length, or spin. He intends to tempt the batsman into scoring runs by providing
Iiyama Line (117 words) [view diff] exact match in snippet view article find links to article
Echigo-Kawaguchi Stations 31 Operation Opened 1921 Owner JR East Technical Line length 96.7 km (60.1 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Tōgane Line (312 words) [view diff] exact match in snippet view article find links to article
Narutō Stations 5 Operation Opened 1900 Operator(s) JR East Technical Line length 13.8 km (8.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Over (cricket) (1,106 words) [view diff] no match in snippet view article
batsman out. For example, he may bowl the first few balls with the same line, length, or spin. He intends to tempt the batsman into scoring runs by providing
Keio Sagamihara Line (233 words) [view diff] exact match in snippet view article find links to article
Hashimoto Stations 12 Operation Opened 1916 Owner Keio Corporation Technical Line length 22.6 km (14.0 mi) Track gauge 1,372 mm (4 ft 6 in) Electrification 1
Tōbu Utsunomiya Line (232 words) [view diff] exact match in snippet view article find links to article
Railway Rolling stock Tobu 350 series, Tobu 8000 series EMUs Technical Line length 24.3 km (15.1 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Comm (583 words) [view diff] exact match in snippet view article find links to article
read lines with the function readlinebuffer() which does not impose any line length limits if system memory suffices. Other implementations read lines with
Keiō New Line (364 words) [view diff] exact match in snippet view article find links to article
Sasazuka Stations 4 Operation Opened 1978 Owner Keio Corporation Technical Line length 3.6 kilometres (2.2 mi) Track gauge 1,372 mm (4 ft 6 in) Electrification
Meitetsu Gamagōri Line (225 words) [view diff] exact match in snippet view article find links to article
Operation Opened November 10, 1936 (1936-11-10) Owner Meitetsu Technical Line length 17.6 km (10.94 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Tarka Line (668 words) [view diff] exact match in snippet view article find links to article
Depot(s) Exeter TMD Rolling stock Class 143, 150 or 153 DMUs Technical Line length 39 mi (62.76 km) Number of tracks 1 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tōkyū Setagaya Line (213 words) [view diff] exact match in snippet view article find links to article
Shimo-Takaido Stations 10 Operation Owner Tokyu Corporation Technical Line length 5 km (3.1 mi) Track gauge 1,372 mm (4 ft 6 in) Electrification 600 V
Mont-Saint-Hilaire line (330 words) [view diff] exact match in snippet view article find links to article
303,100 (2014) Operation Opened 1859 Operator(s) CN's Montrain Division Technical Line length 34.9 km (21.7 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Nagano Line (Kintetsu) (323 words) [view diff] exact match in snippet view article
Prefecture, Japan Stations 8 Operation Operator(s) Kintetsu Railway Technical Line length 12.5 km (7.8 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Keifuku Electric Railroad (661 words) [view diff] exact match in snippet view article find links to article
(叡山ロープウェイ, Eizan Rōpuwei?) (Ja) is an aerial tramway in Sakyo-ku, Kyoto. The line length is 0.5 km. The cable and ropeway lines are for visitors to Mount Hiei
Keihan Nakanoshima Line (248 words) [view diff] exact match in snippet view article find links to article
Company Operator(s) Keihan Electric Railway Depot(s) none Technical Line length 3.0 km (1.9 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Haizhu Tram (170 words) [view diff] exact match in snippet view article find links to article
Guangzhou Metro Character At-grade Depot(s) Modiesha Stabling Yard Technical Line length 7.7 km (4.78 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Lhasa–Xigazê Railway (324 words) [view diff] exact match in snippet view article find links to article
Railway Station Operation Opened 16 August 2014 (2014-08-16) Technical Line length 253 km (157 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Nanjing–Tianchang Intercity Railway (112 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1 August 2014 Character Underground and elevated Technical Line length 45.21 km (28.1 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Linkou Line (145 words) [view diff] exact match in snippet view article find links to article
Administration Operator(s) Taiwan Railways Administration Technical Line length 18.4 km (11.4 mi) Number of tracks 1 Track gauge 3 ft 6 in (1,067 mm)
Seibu Yūrakuchō Line (342 words) [view diff] exact match in snippet view article find links to article
Kotake-Mukaihara Stations 3 Operation Owner Seibu Railway Technical Line length 2.6 km (1.6 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in) Electrification
Tianjin–Baoding Intercity Railway (596 words) [view diff] exact match in snippet view article find links to article
Opened December 28, 2015 Operator(s) China Railway High-speed Technical Line length 157.925 km (98 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Donghae Line (123 words) [view diff] exact match in snippet view article find links to article
2015 Owner korea Rail Network Authority Operator(s) Korail Technical Line length 35.1 km (21.8 mi) Number of tracks Double track Track gauge 1,435 mm
Jammu–Poonch railway line (190 words) [view diff] exact match in snippet view article find links to article
indianrailways.gov.in Operation Operator(s) Indian Railways Technical Line length 234 km (145 mi) Number of tracks Broad Gauge Track gauge 5 ft 6 in (1
Xuzhou–Lanzhou High-Speed Railway (285 words) [view diff] exact match in snippet view article find links to article
Owner China Railways Operator(s) China Railway High-speed Technical Line length 1,363 km (847 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Onoda Line (253 words) [view diff] exact match in snippet view article find links to article
Yamaguchi Prefecture Termini Inō Onoda Operation Owner JR West Technical Line length 11.6 km (7.2 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Shijiazhuang–Taiyuan high-speed railway (338 words) [view diff] exact match in snippet view article find links to article
2009 Owner China Railway Operator(s) China Railway High-speed Technical Line length 189 km (117 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Line 3, Nanjing Metro (87 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1 April 2015 Character Elevated/underground Technical Line length 44.1 km (27.4 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 5 (Taipei Metro) (481 words) [view diff] exact match in snippet view article
stock Siemens C321 and C341 3 cars per set, 2 sets per train Technical Line length 28.2 km (17.5 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Daegu Line (561 words) [view diff] exact match in snippet view article find links to article
1917–1918 Owner Korea Rail Network Authority Operator(s) Korail Technical Line length 29.0 km (18.0 mi) Number of tracks Double track (Gacheon–Geumho) Single
Coastal Line (TRA) (128 words) [view diff] exact match in snippet view article
Administration Operator(s) Taiwan Railways Administration Technical Line length 90.2 km (56.0 mi) Number of tracks 2 Track gauge 3 ft 6 in (1,067 mm)
Longhai Railway (585 words) [view diff] exact match in snippet view article find links to article
Longhai Railway Line length: 1,759 km (1,093 mi) Track gauge: 1,435 mm (4 ft 8 1⁄2 in) Stations and structures Legend
R3 (Rodalies de Catalunya) (958 words) [view diff] exact match in snippet view article
through the Vallès Oriental, Osona and Ripollès regions. With a total line length of 165.9 kilometres (103.1 mi), it extends notably beyond the limits
Dandong–Dalian Intercity Railway (399 words) [view diff] exact match in snippet view article find links to article
Opened 17 December 2015 Operator(s) China Railway High-speed Technical Line length 292 km (181 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Ferranti effect (237 words) [view diff] exact match in snippet view article find links to article
applied. The relative voltage rise is proportional to the square of the line length. The Ferranti effect is much more pronounced in underground cables, even
Île-de-France tramway Line 5 (95 words) [view diff] exact match in snippet view article find links to article
year Operation Opened 2013 (2013) Operator(s) RATP Rolling stock Translohr Technical Line length 6.6 km (4.1 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Jinshan Railway (251 words) [view diff] exact match in snippet view article find links to article
Opened 1975 Owner China Railways Operator(s) Shanghai Metro Technical Line length 56.4 km (35.05 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Sagami Railway Izumino Line (123 words) [view diff] exact match in snippet view article find links to article
56,843 (2010) Operation Opened 1976-99 Owner Sagami Railway Technical Line length 11.3 km (7.0 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Fu (poetry) (5,033 words) [view diff] exact match in snippet view article
their compositions. Fu poems employ alternating rhyme and prose, varying line length, close alliteration, onomatopoeia, loose parallelism, and extensive cataloging
Suphan Buri Line (113 words) [view diff] exact match in snippet view article find links to article
Maen Stations 16 Operation Opened 16 June 1963 Owner State Railway of Thailand Technical Line length 78 km (48 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in)
Kishin Line (208 words) [view diff] exact match in snippet view article find links to article
Rolling stock KiHa 40 series, KiHa 120, KiHa 122/127 series Technical Line length 158.1 km (98.2 mi) Track gauge 1,067 mm (3 ft 6 in) Operating speed 100 km/h
Wonthaggi railway line (761 words) [view diff] exact match in snippet view article find links to article
Wonthaggi railway Overview Type V/Line passenger service Status Closed Operation Commenced 1909 Opened 1910 Closed 1978 Technical Line length 30 mi (48.3 km)
Nallapadu–Nandyal section (114 words) [view diff] exact match in snippet view article find links to article
Operation Owner Indian Railway Operator(s) South Central Railway Technical Line length 256.91 km (159.64 mi) Track gauge 1,676 mm (5 ft 6 in) Broad gauge
Guangzhou–Zhuhai Intercity Railway (1,409 words) [view diff] exact match in snippet view article find links to article
Opened 7 January 2011 Operator(s) China Railway High-speed Technical Line length 187 km (116.196 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Meitetsu Chikkō Line (122 words) [view diff] exact match in snippet view article find links to article
Operation Opened January 15, 1924 (1924-01-15) Owner Meitetsu Technical Line length 1.5 km (0.9 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 160 m
Metrotrén (132 words) [view diff] exact match in snippet view article find links to article
Metropolitanos S.A. Rolling stock UT-440 series RENFE Class 440 Technical Line length 133.8 km (83.14 mi) Track gauge 1,676 mm (5 ft 6 in) Electrification
South-Link Line (238 words) [view diff] exact match in snippet view article find links to article
Administration Operator(s) Taiwan Railways Administration Technical Line length 98.2 km (61.0 mi) Number of tracks 1 Track gauge 3 ft 6 in (1,067 mm)
Frankfurt Airport loop (348 words) [view diff] exact match in snippet view article find links to article
Overview Native name Flughafenschleife Frankfurt Locale Hesse, Germany Line number 3683 Technical Line length 15.8 km (9.8 mi) Route number 645.8, 645.9
Gudivada–Machilipatnam branch line (119 words) [view diff] exact match in snippet view article find links to article
Operation Owner Indian Railway Operator(s) South Central Railway Technical Line length 36.70 km (22.80 mi) Track gauge 1,676 mm (5 ft 6 in) Broad gauge
Cross Island MRT Line (976 words) [view diff] exact match in snippet view article find links to article
(expected) Operation Opened 2030 Owner Land Transport Authority Operator(s) TBA Technical Line length 50 km (31 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
HMS Princess Louisa (1744) (92 words) [view diff] case mismatch in snippet view article
characteristics Class and type: 1741 proposals 58-gun fourth rate ship of the line Length: 147 ft (44.8 m) (gundeck) Beam: 42 ft (12.8 m) Depth of hold: 18 ft
Line 8, Shenzhen Metro (115 words) [view diff] exact match in snippet view article find links to article
(Shenzhen Metro Group) Character Underground and elevated Technical Line length 12.34 km (7.67 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 7, Shenzhen Metro (264 words) [view diff] exact match in snippet view article find links to article
Operator(s) SZMC (Shenzhen Metro Group) Character Underground Technical Line length 30.173 km (18.75 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
HMS Princess Louisa (1744) (92 words) [view diff] case mismatch in snippet view article
characteristics Class and type: 1741 proposals 58-gun fourth rate ship of the line Length: 147 ft (44.8 m) (gundeck) Beam: 42 ft (12.8 m) Depth of hold: 18 ft
Tehran Metro Line 2 (338 words) [view diff] exact match in snippet view article find links to article
Organization (Metro) Depot(s) Tehran-East Depot Tehran-West Depot Technical Line length 23.4 km (14.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Seibu Kokubunji Line (354 words) [view diff] exact match in snippet view article find links to article
Seibu 101 series, Seibu 2000 series, and Seibu 3000 series Technical Line length 7.8 km (4.8 mi) Number of tracks 1 (1.2 km double-tracked) Track gauge
Cross Island MRT Line (976 words) [view diff] exact match in snippet view article find links to article
(expected) Operation Opened 2030 Owner Land Transport Authority Operator(s) TBA Technical Line length 50 km (31 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Line 8, Shenzhen Metro (115 words) [view diff] exact match in snippet view article find links to article
(Shenzhen Metro Group) Character Underground and elevated Technical Line length 12.34 km (7.67 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 1, Guangzhou Metro (143 words) [view diff] exact match in snippet view article find links to article
Guangzhou Metro Corporation Character Underground and At-grade Technical Line length 18.5 km (11.50 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Seibu Seibu-en Line (146 words) [view diff] exact match in snippet view article find links to article
Stations 2 Operation Opened 5 April 1930 Owner Seibu Railway Technical Line length 2.4 km (1.5 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Minimum
Paris Métro Line 7bis (211 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1967 Rolling stock MF 88 3 carriages per trainset Technical Line length 3.1 km (1.9 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Empirical theory of perception (2,962 words) [view diff] exact match in snippet view article find links to article
realm of biology. Consider, for example, the case of the distance and line length. When light reflected from a linear object falls on the retina, the object
Meitetsu Chita New Line (116 words) [view diff] exact match in snippet view article find links to article
Operation Opened June 5, 1980 (1980-06-05) Owner Meitetsu Technical Line length 13.9 km (8.64 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Livoberezhna Line (Kiev Light Rail) (219 words) [view diff] exact match in snippet view article
Troieschyna-2 Stations 7 Operation Opened May 26, 2000 Operator(s) Kyivpastrans Technical Line length 13.2 kilometres (8.2 mi) Track gauge 1,524 mm (5 ft)
Fernleigh Track (548 words) [view diff] no match in snippet view article find links to article
(16 ft) (nr Belmont Station) Maximum elevation, 88 m (289 ft) (on main line) Length of Line, 15.51 km (10 mi) 1880 - Rail line opened to Redhead December
Tobu Daishi Line (281 words) [view diff] exact match in snippet view article find links to article
December 1931 Owner Tobu Railway Rolling stock Tobu 8000 series Technical Line length 1.0 km (0.62 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Line 4, Nanjing Metro (100 words) [view diff] exact match in snippet view article find links to article
Operation Opened January 18, 2017 Operator(s) Nanjing Metro Technical Line length 33.5 km (20.8 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Seibu Sayama Line (188 words) [view diff] exact match in snippet view article find links to article
Seibu-Kyūjō-mae Stations 3 Operation Opened 1929 Owner Seibu Railway Technical Line length 4.2 km (2.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Mokama–Barauni section (200 words) [view diff] exact match in snippet view article find links to article
Stations 9 Operation Owner Indian Railway Operator(s) East Central Railway Technical Line length 21 km (13 mi) Track gauge 1,676 mm (5 ft 6 in) broad gauge
Riga–Daugavpils Railway (80 words) [view diff] exact match in snippet view article find links to article
Daugavpils Station Operation Opened 1861 Operator(s) Latvian Railways, Belarusian Railway Technical Line length 218 km (135 mi) Track gauge 1,524 mm (5 ft)
Pune–Miraj–Londa line (343 words) [view diff] exact match in snippet view article find links to article
Railway Operator(s) Central Railway, South Western Railway Technical Line length 468 km (291 mi) Number of tracks 2/1 Track gauge 1,676 mm (5 ft 6 in)
Meitetsu Kōwa Line (85 words) [view diff] exact match in snippet view article find links to article
Termini Ōtagawa Kōwa Stations 19 Operation Owner Meitetsu Technical Line length 28.8 km (17.9 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 280
Kintetsu Namba Line (199 words) [view diff] exact match in snippet view article find links to article
Opened March 15, 1970 (1970-03-15) Operator(s) Kintetsu Railway Technical Line length 2.0 km (1.2 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Mount Tsukuba Ropeway (117 words) [view diff] exact match in snippet view article find links to article
capacity 70 Passengers per cabin, 2 cabins Trip duration 6 min Technical features Line length 1.3 kilometres (0.8 mi) Vertical Interval 298 m (978 ft)
Warburton railway line (224 words) [view diff] exact match in snippet view article find links to article
and Healesville lines Stations 12 Operation Opened 1901 Closed 1965 Technical Line length 37 km (23 mi) (From Lilydale) Number of tracks Single track
Lille to Fontinettes railway (96 words) [view diff] exact match in snippet view article find links to article
Fontinettes, Calais Operation Opened 1848 Owner RFF Operator(s) SNCF Technical Line length 105 km (65 mi) Number of tracks Double track Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line S6 (Milan suburban railway service) (500 words) [view diff] exact match in snippet view article
Trenord (Italian) Operation Opened 2004 Rolling stock TAF / TSR Technical Line length 84 km (52 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 3
Hengyang–Liuzhou Intercity Railway (148 words) [view diff] exact match in snippet view article find links to article
Opened 28 December 2013 Operator(s) China Railway High-speed Technical Line length 497.9 km (309 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Vestmarka Line (71 words) [view diff] exact match in snippet view article find links to article
Operator(s) Norwegian State Railways Character Passenger and freight Technical Line length 14.25 kilometres (9 mi) Number of tracks Single Track gauge 1,435 mm
Line 10, Nanjing Metro (145 words) [view diff] exact match in snippet view article find links to article
Operator(s) Nanjing Metro Character Underground Elevated (Xiaohang) Technical Line length 21.6 km (13.4 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Masada cableway (147 words) [view diff] exact match in snippet view article find links to article
Israel Nature and Parks Authority Technical features Aerial lift type Aerial tramway Line length 0.9 km Operating speed 28.8 km/h Notes elevation 33 m
Line 4, Shanghai Metro (298 words) [view diff] exact match in snippet view article find links to article
Metro Operation Co. Ltd. Character Underground and elevated Technical Line length 33.7 km (20.94 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 5, Guangzhou Metro (98 words) [view diff] exact match in snippet view article find links to article
Guangzhou Metro Corporation Character Underground and Elevated Technical Line length 31.9 km (19.82 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Kashihara Line (175 words) [view diff] exact match in snippet view article find links to article
ago (1921-04-01) Owner Kintetsu Railway Character Commuter rail Technical Line length 23.8 km (14.8 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius
Line 8, Shanghai Metro (509 words) [view diff] exact match in snippet view article find links to article
Metro Operation Co. Ltd. Character Underground and elevated Technical Line length 37.4 km (23.24 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 3, Tianjin Metro (86 words) [view diff] exact match in snippet view article find links to article
Metro Corporation Character Underground, At-grade, & Elevated Technical Line length 30.755 km (19.11 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 2, Chongqing Rail Transit (173 words) [view diff] exact match in snippet view article find links to article
Peak) Operation Opened 18 June 2005 Operator(s) Chongqing Rail Transit Corp., Ltd Rolling stock Hitachi Monorail Technical Line length 31.3 km (19.4 mi)
Monongahela Incline (503 words) [view diff] exact match in snippet view article find links to article
 1870 (1870-05-28) Owner Port Authority of Allegheny County Technical Line length 635 feet (194 m) Track gauge 5 ft (1,524 mm) Electrification 1935 Operating
Ode (651 words) [view diff] exact match in snippet view article find links to article
English are by Abraham Cowley. These were iambic, but had irregular line length patterns and rhyme schemes. Cowley based the principle of his Pindariques
Pingtung Line (71 words) [view diff] exact match in snippet view article find links to article
Administration Operator(s) Taiwan Railways Administration Technical Line length 61.3 km (38.1 mi) Number of tracks 2 Track gauge 3 ft 6 in (1,067 mm)
Skreia Line (128 words) [view diff] exact match in snippet view article find links to article
Operator(s) Norwegian State Railways Character Passenger and freight Technical Line length 21.97 km Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tel Aviv Metro (269 words) [view diff] case mismatch in snippet view article find links to article
Line Length Route 1–2 Ra'anana – Herzliya – Ramat HaSharon – Northern Tel Aviv – Tel Aviv University – Bavli – Ayalon Highway (Tel Aviv) – Holon Industrial
Line 12, Shanghai Metro (273 words) [view diff] exact match in snippet view article find links to article
Shanghai No.4 Metro Operation Co. Ltd. Character Underground Technical Line length 40.4 km (25.10 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Patna–Gaya line (238 words) [view diff] exact match in snippet view article find links to article
1900 Owner Indian Railway Operator(s) East Central Railway Technical Line length 92 km (57 mi) Track gauge Broad Gauge 1,676 mm (5 ft 6 in) Electrification
Manila Light Rail Transit System Line 6 (281 words) [view diff] exact match in snippet view article find links to article
Opened TBA Owner Light Rail Transit Authority Operator(s) TBA Technical Line length 19 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
SEPTA Main Line (525 words) [view diff] exact match in snippet view article find links to article
Website septa.org Operation Operator(s) SEPTA Regional Rail Technical Line length 26.25 miles (42.25 km) Number of tracks 2–4 Track gauge 4 ft 8 1⁄2 in
Røykenvik Line (115 words) [view diff] exact match in snippet view article find links to article
Operator(s) Norwegian State Railways Character Passenger and freight Technical Line length 7 km Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Minatomirai Line (433 words) [view diff] exact match in snippet view article find links to article
Railway Company, Tokyu Corporation Rolling stock Y500 series Technical Line length 4.1 km (2.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Wells Harbour Railway (474 words) [view diff] exact match in snippet view article find links to article
called at: 2 Stations operated: 2 Route km operated: 1.1 Website: Official website Technical Line length: 1,200 yards (1,100 m) Gauge: 10 1⁄4 in (260 mm)
502 Downtowner (264 words) [view diff] exact match in snippet view article find links to article
Transit Commission Depot(s) Russell Rolling stock Shuttle buses Technical Line length 9.38 km (5.83 mi) Track gauge 4 ft 10 7⁄8 in (1,495 mm) - TTC Gauge
Yizhuang Line, Beijing Subway (243 words) [view diff] exact match in snippet view article find links to article
Operator(s) Beijing Mass Transit Railway Operation Corp., Ltd Technical Line length 23.23 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 80 km/h
Samsun–Kalın railway (63 words) [view diff] exact match in snippet view article find links to article
Owner Turkish State Railways Operator(s) TCDD Taşımacılık Technical Line length 377.7 km (234.7 mi) Number of tracks 1 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Trams in Mannheim/Ludwigshafen (190 words) [view diff] exact match in snippet view article find links to article
Area, Germany Open 1878 (1878) Status Operational Lines 10 (total line length 97 km (60 mi)) Operator(s) Rhein-Neckar-Verkehr (RNV) Infrastructure
Changsha Metro (357 words) [view diff] exact match in snippet view article find links to article
construction began in 2010 and was open on Jun 28, 2016. Line 1 has a line length of 23.62 kilometres (14.68 mi) with 20 stations, of which 1 is elevated
Meitetsu Tsushima Line (115 words) [view diff] exact match in snippet view article find links to article
at Meitetsu (Japanese) Operation Opened 1914 Owner Meitetsu Technical Line length 11.8 km (7.33 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Overhead
Keikyū Daishi Line (428 words) [view diff] exact match in snippet view article find links to article
Kojimashinden Stations 7 Operation Opened 1899 Owner Keikyu Technical Line length 4.5 km (2.8 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Keihin-Tōhoku Line (1,504 words) [view diff] exact match in snippet view article find links to article
Operator(s) JR East Depot(s) Saitama Rolling stock E233-1000 series Technical Line length 59.1 km (36.7 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Line 11, Shanghai Metro (343 words) [view diff] exact match in snippet view article find links to article
Nanxiang to North Jiading and East Changji Road to Huaqiao) Technical Line length 82.4 km (51.20 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Sørlandet Line (455 words) [view diff] exact match in snippet view article find links to article
Long-haul passenger/freight Rolling stock Class 73, El 18 Technical Line length 528 Number of tracks Single or Double Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Île-de-France tramway Line 7 (86 words) [view diff] exact match in snippet view article find links to article
Athis-Mons Stations 18 Operation Opened 2013 Rolling stock Alstom Citadis 302 Technical Line length 11.2 km (7.0 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Jōsō Line (304 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1 November 1913 (1913-11-01) Owner Kanto Railway Technical Line length 51.1 km Track gauge 1,067 mm (3 ft 6 in) Minimum radius 290 m Electrification
Line 7, Shanghai Metro (267 words) [view diff] exact match in snippet view article find links to article
Character Underground Elevated(Luonan Xincun and Meilan Lake) Technical Line length 44.2 km (27.5 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
MIA Mover (518 words) [view diff] exact match in snippet view article find links to article
the airport Rolling stock Mitsubishi Crystal Mover vehicles Technical Line length 1.27 miles (2.04 km) Operating speed 43 miles per hour (69 km/h) (top)
Gandhidham–Ahmedabad main line (327 words) [view diff] exact match in snippet view article find links to article
Opened 1969 Owner Indian Railways Operator(s) Western Railway Technical Line length 299.2 km (186 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in)
Battipaglia–Reggio di Calabria railway (85 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1895 (1895) Owner RFI Operator(s) Trenitalia Technical Line length 374 km (232 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Green Line (Baltimore) (556 words) [view diff] exact match in snippet view article
Hopkins Hospital Morgan State University Stations 13 Services 1 Operation Operator(s) Maryland Transit Administration Technical Line length 4 mi (6.4 km)
Hafslund Line (98 words) [view diff] exact match in snippet view article find links to article
Halfslund Operator(s) Hafslund Smelteverk Character Freight Technical Line length 5.5 km Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Bethpage Branch (451 words) [view diff] exact match in snippet view article find links to article
Railroad of Long Island (1873-1876) Long Island Rail Road (1876-1942) Technical Line length 1.75 miles (2.8 km) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
French ship Robuste (1806) (300 words) [view diff] case mismatch in snippet view article
General characteristics Class and type: Bucentaure-class Type: ship of the line Length: 55.88 m (183.33 ft) (overall) 53.92 m (176.90 ft) (keel) Beam: 15
Andal–Sainthia branch line (234 words) [view diff] exact match in snippet view article find links to article
Opened 1913 Owner Indian Railway Operator(s) Eastern Railway Technical Line length 73 km (45 mi) Track gauge 1,676 mm (5 ft 6 in) Broad Gauge Operating
Line 10, Shanghai Metro (282 words) [view diff] exact match in snippet view article find links to article
peak) Operation Opened April 10, 2010 Character Underground Technical Line length 36 km (22.37 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 8, Guangzhou Metro (149 words) [view diff] exact match in snippet view article find links to article
Operator(s) Guangzhou Metro Corporation Character Underground Technical Line length 14.8 km (9.20 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tehran Metro Line 3 (280 words) [view diff] exact match in snippet view article find links to article
Suburban Railways Organization (Metro) Depot(s) Azadegan Depot Technical Line length 38 km (24 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification Third
Maroochydore railway line (281 words) [view diff] exact match in snippet view article find links to article
Maroochydore line Overview Website queenslandrail.com.au Technical Line length 0 km (0 mi) Track length 109 km (68 mi) Track gauge 3 ft 6 in (1,067 mm)
Twin Peaks Tunnel (369 words) [view diff] exact match in snippet view article find links to article
Underground subway tunnel for light rail/streetcar system Technical Line length 2.27 mi (3.65 km) No. of tracks 2 Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Meitetsu Takehana Line (166 words) [view diff] exact match in snippet view article find links to article
Line at Meitetsu Operation Opened 1921 Owner Nagoya Railroad Technical Line length 10.3 km (6.40 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Overhead
Line 16, Shanghai Metro (488 words) [view diff] exact match in snippet view article find links to article
Transportation Development Co., Ltd. Character Elevated/Underground Technical Line length 58.96 km (36.64 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
B-Line (Hamilton) (414 words) [view diff] exact match in snippet view article
Hamilton Rapid Transit Operation Operator(s) Hamilton Street Railway Technical Line length 13.4 kilometres (8.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 13, Shanghai Metro (203 words) [view diff] exact match in snippet view article find links to article
Shanghai No. 2 Metro Operation Co., Ltd. Character Underground Technical Line length 22.2 km (13.79 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Kisuki Line (174 words) [view diff] exact match in snippet view article find links to article
Bingo Ochiai Stations 18 Operation Opened 1932 Owner JR West Technical Line length 81.9 km (50.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Bankura Damodar Railway (619 words) [view diff] exact match in snippet view article find links to article
McLeod's Light Railway Company till 1967 thereafter South Eastern Railway Technical Line length Narrow gauge: 97 km (60 mi) Track gauge 2 ft 6 in (762 mm)
U4 (Hamburg U-Bahn) (242 words) [view diff] exact match in snippet view article
Type Rapid transit System Hamburg U-Bahn Stations 11 Operation Opened 2012 Technical Line length 11.9 km (7.4 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Aarhus Letbane (157 words) [view diff] exact match in snippet view article find links to article
(construction project) Operation Opened May 2017 Owner Midttrafik Technical Line length 107 km (66 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Spikkestad Line (104 words) [view diff] exact match in snippet view article find links to article
Statsbaner Character Commuter trains Rolling stock Class 72 Technical Line length 14 km (8.7 mi) Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Sōbu Line (Rapid) (409 words) [view diff] exact match in snippet view article
Chiba Stations 10 Operation Opened 1972 Operator(s) JR East Technical Line length 60.2 km (37.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Second Beijing–Tianjin Intercity Railway (242 words) [view diff] exact match in snippet view article find links to article
Beijing East Binhai Services 1 Operation Operator(s) China Railway High-speed Technical Line length 171.7 km (107 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Madhupur Giridih Rail Line (485 words) [view diff] exact match in snippet view article find links to article
2012,2015 Owner Indian Railways Operator(s) Eastern Railway Technical Line length 149 km (93 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in) Broad
Akita Shinkansen (413 words) [view diff] exact match in snippet view article find links to article
Opened 22 March 1997 Owner JR East Rolling stock E6 series Technical Line length 127.3 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 20 kV AC
Underarm bowling (2,102 words) [view diff] no match in snippet view article find links to article
flight of the ball and experimented for long hours with variations of line, length and speed of delivery until he had mastered the art of pitching. Other
U3 (Hamburg U-Bahn) (275 words) [view diff] exact match in snippet view article
Rapid transit System Hamburg U-Bahn Stations 25 Operation Opened 1912 Technical Line length 20.68 km (12.85 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Orlyval (236 words) [view diff] exact match in snippet view article find links to article
Orlyval Overview Stations 3 Ridership 2,500,000 journeys per year Operation Opened 1991 Rolling stock VAL 206 Technical Line length 7.3 km (4.5 mi)
Tōyō Rapid Railway Line (245 words) [view diff] exact match in snippet view article find links to article
1996 Owner Toyo Rapid Railway Depot(s) Yachiyo-Midorigaoka Technical Line length 16.2 km (10.1 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in)
Web page (2,643 words) [view diff] case mismatch in snippet view article find links to article
Norman Group. Retrieved 2016-11-16.  Lynch, Patrick. "Page Width and Line Length". Yale University Press. Retrieved 2016-11-14.  Broider, Rick (2013)
Lanzhou–Zhongchuan Airport Intercity Railway (339 words) [view diff] exact match in snippet view article find links to article
Opened September 30, 2015 Operator(s) China Railway High-speed Technical Line length 61 km (38 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius 3,500 m
Pamban–Dhanushkodi branch line (108 words) [view diff] exact match in snippet view article find links to article
Owner Indian Railways Operator(s) Southern Railway zone Depot(s) Golden Rock Technical Line length 30 km (19 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in)
Sprinter (light rail) (2,212 words) [view diff] exact match in snippet view article
Transportation Rolling stock 12 married pairs of Siemens VT642 Desiro DMUs Technical Line length 22 mi (35 km) Track gauge 4 ft 8 1⁄2 in (1,435 mm) standard gauge
HMS St Albans (1706) (162 words) [view diff] case mismatch in snippet view article
rebuild Class and type: 1706 Establishment 50-gun fourth rate ship of the line Length: 130 ft (39.6 m) (gundeck) Beam: 35 ft (10.7 m) Depth of hold: 14 ft
Minsheng-Xizhi Line, Taipei Metro (110 words) [view diff] exact match in snippet view article find links to article
Opened planning Operator(s) Taipei Rapid Transit Corporation Character Underground, Elevated Depot(s) Xizhi Depot Technical Line length 17 km (10.6 mi)
Narrow-gauge railways in Norway (114 words) [view diff] case mismatch in snippet view article find links to article
Line Length Opened Gauge Converted Notes Ålgård Line 12 km (7.5 mi) 1921 1,067 mm (3 ft 6 in) 1944 Branch of the Sørlandet Line Brevik Line 10 km (6.2 mi)
Guntakal–Vasco da Gama section (75 words) [view diff] exact match in snippet view article find links to article
Central Railway zone South Western Railway zone Konkan Railway Technical Line length 457 km (284 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in) Old
Manamadurai–Virudhunagar line (494 words) [view diff] exact match in snippet view article find links to article
Railways Operator(s) Southern Railway zone Depot(s) Golden Rock Technical Line length 67 km (42 mi) Track gauge 1,676 mm (5 ft 6 in) Old gauge 1,000 mm (3 ft 3 3⁄8 in)
Keikyū Airport Line (390 words) [view diff] exact match in snippet view article find links to article
Domestic Terminal Stations 7 Operation Opened 1902 Owner Keikyu Technical Line length 6.5 km (4.0 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Île-de-France tramway Line 8 (76 words) [view diff] exact match in snippet view article find links to article
Operator(s) RATP Rolling stock Alstom Citadis 302 Technical Line length 8.46 km (5.26 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Section restoration (1,167 words) [view diff] exact match in snippet view article find links to article
started. This method does not guarantee that area is conserved, only line length. The technique was applied to areas of extensional tectonics initially
Line 2, Dongguan Rail Transit (200 words) [view diff] exact match in snippet view article find links to article
Underground and elevated Rolling stock Bombardier Innovia Metro Technical Line length 37.7 km (23.43 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Meitetsu Hashima Line (106 words) [view diff] exact match in snippet view article find links to article
Website Meitetsu Operation Opened 1982 Owner Nagoya Railroad Technical Line length 1.3 km (0.81 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Overhead
Odakyū Tama Line (422 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1 June 1974 Owner Odakyu Electric Railway Technical Line length 10.6 km Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500 V DC overhead
Keikyū Airport Line (390 words) [view diff] exact match in snippet view article find links to article
Domestic Terminal Stations 7 Operation Opened 1902 Owner Keikyu Technical Line length 6.5 km (4.0 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Hankyu Senri Line (393 words) [view diff] exact match in snippet view article find links to article
Stations 11 Operation Operator(s) Hankyu Railway Depot(s) Shojaku Technical Line length 13.6 km (8.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Île-de-France tramway Line 8 (76 words) [view diff] exact match in snippet view article find links to article
Operator(s) RATP Rolling stock Alstom Citadis 302 Technical Line length 8.46 km (5.26 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Saitama Rapid Railway Line (299 words) [view diff] exact match in snippet view article find links to article
2001 Owner Saitama Railway Corporation Depot(s) Urawa-Misono Technical Line length 14.6 km (9.1 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in)
Balranald railway line (129 words) [view diff] exact match in snippet view article find links to article
1986 (1986) Closed beyond Caldwell March 9, 2006 (2006-03-09) Technical Line length 193.53 km (120.25 mi) Track gauge 5 ft 3 in (1,600 mm) Operating speed
Beijing–Zhangjiakou Intercity Railway (466 words) [view diff] exact match in snippet view article find links to article
Stations 10 Services 1 Operation Operator(s) China Railway High-speed Technical Line length 173.947 km (108 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Keio Inokashira Line (565 words) [view diff] exact match in snippet view article find links to article
1933 Owner Keio Corporation Rolling stock Keio 1000 series Technical Line length 12.7 km (7.9 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in)
Traction power network (1,774 words) [view diff] exact match in snippet view article find links to article
usually laid parallel to the railway line, in order to allow a shorter line length and to avoid unnecessary influences to the electrical system near the
Xiaoshan–Ningbo Railway (304 words) [view diff] exact match in snippet view article find links to article
Hangzhou Ningbo Stations 23 (14 active) Operation Operator(s) China Railways Technical Line length 147.32 km (91.54 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Dovre Line (699 words) [view diff] exact match in snippet view article find links to article
Statsbaner CargoNet Rolling stock Class 73, El 14, El 16, El 18 Technical Line length 553 km (344 mi) Number of tracks Single or double Track gauge 1,435 mm
Taketoyo Line (445 words) [view diff] exact match in snippet view article find links to article
Owner JR Central Rolling stock 311 series/313 series EMUs Technical Line length 19.3 km (12.0 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Honam Line (1,377 words) [view diff] exact match in snippet view article find links to article
of Korea Train Express (KTX) services on April 1, 2004. The present line length from Daejeon to Mokpo is 252.5 km (156.9 mi), the line distance from
Itsukaichi Line (616 words) [view diff] exact match in snippet view article find links to article
Musashi-Itsukaichi Stations 7 Operation Opened 1925 Operator(s) JR East Technical Line length 11.1 km (6.90 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Mito Line (328 words) [view diff] exact match in snippet view article find links to article
Operator(s) JR East Rolling stock E501 series/E531 series EMUs Technical Line length 50.2 km (31.2 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 20
Fredericksburg Line (272 words) [view diff] exact match in snippet view article find links to article
CSX Transportation Operator(s) Virginia Railway Express Character 2 track main line Technical Line length 54 miles Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Sagami Line (341 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1921 Owner JR East Rolling stock 205-500 series Technical Line length 33.3 km (20.7 mi) Number of tracks Single track Track gauge 1,067 mm
Hanwa Line (814 words) [view diff] exact match in snippet view article find links to article
Opened September 18, 1929 Owner JR West Depot(s) Hineno, Suita Technical Line length 63.0 km (39.1 mi) 61.3 km (38.1 mi) (Tennoji - Wakayama) 1.7 km (1
Skøyen–Filipstad Line (153 words) [view diff] exact match in snippet view article find links to article
Rail Administration Operator(s) CargoNet Character Freight Technical Line length 2 km (1.2 mi) Number of tracks Double Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 6, Shanghai Metro (459 words) [view diff] exact match in snippet view article find links to article
Metro Operation Co. Ltd. Character Underground and elevated Technical Line length 32.318 km (20.08 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Shanghai–Kunming High-Speed Railway (162 words) [view diff] exact match in snippet view article find links to article
Owner China Railways Operator(s) China Railway High-speed Technical Line length 2,066 km (1,284 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Tōkyū Ōimachi Line (264 words) [view diff] exact match in snippet view article find links to article
Stations 15 Operation Opened 6 July 1927 Owner Tokyu Corporation Technical Line length 12.4 km (7.7 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Ningbo–Fenghua Intercity Railway (279 words) [view diff] exact match in snippet view article find links to article
Ningbo Rail Transit Co.,Ltd. Character Underground / Elevated Technical Line length 21.808 km (13.55 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tama Toshi Monorail Line (155 words) [view diff] exact match in snippet view article find links to article
Monorail Co., Ltd. Rolling stock Tama Toshi Monorail 1000 series Technical Line length 16.0 km (9.94 mi) Electrification 1,500 V DC Operating speed 65 km/h
Zhengzhou–Kaifeng Intercity Railway (366 words) [view diff] exact match in snippet view article find links to article
17th December 2014 Operator(s) China Railway High-speed Technical Line length 50.33 km (31 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Kakogawa Line (172 words) [view diff] exact match in snippet view article find links to article
Opened 1913 Owner JR West Rolling stock 103 series, 125 series Technical Line length 48.5 km (30.1 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Pacific DC Intertie (1,544 words) [view diff] exact match in snippet view article find links to article
In general the total costs for HVDC are less than an AC line if the line length is over 500–600 miles and with advances in conversion technology this
Port Vell Aerial Tramway (838 words) [view diff] exact match in snippet view article find links to article
1931 Operation Operator Teleféricos de Barcelona Technical features Line length 1.3 km (0.81 mi) Operating speed 3 m/s Notes elevation 107 m (351 ft)
Jubilee line (4,464 words) [view diff] exact match in snippet view article find links to article
Stratford Market Rolling stock 1996 Tube Stock 7 carriages per trainset Technical Line length 36.2 km (22.5 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Chengdu–Pujiang Intercity Railway (261 words) [view diff] exact match in snippet view article find links to article
Stations 12 Operation Operator(s) China Railway High-speed Technical Line length 99 km (62 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 200 km/h
Manila Metro Rail Transit System Line 7 (589 words) [view diff] exact match in snippet view article find links to article
Transportation and Communications Rolling stock Hyundai Rotem Technical Line length 22.8 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Thorpdale railway line (60 words) [view diff] exact match in snippet view article find links to article
Type V/Line passenger service Stations 4 Operation Opened 8 May 1888 Closed 4 December 1958 Technical Line length 18 km (11 mi) Number of tracks Single
Overscan (2,119 words) [view diff] exact match in snippet view article find links to article
pixels per line. In order to accommodate both formats within the same line length, and to avoid cutting off parts of the active picture if the timing of
Shanghai–Wuhan–Chengdu high-speed railway (937 words) [view diff] exact match in snippet view article find links to article
Owner China Railways Operator(s) China Railway High-speed Technical Line length 2078 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 350-200
Jilin–Hunchun Intercity Railway (490 words) [view diff] exact match in snippet view article find links to article
Opened September 30, 2015 Operator(s) China Railway High-speed Technical Line length 359 km (223 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius 4
Noto Line (215 words) [view diff] exact match in snippet view article find links to article
Takojima Stations 30 Operation Opened 1959 Closed 2005 Operator(s) Noto Railway Technical Line length 61.0 km (37.90 mi) Track gauge 1,067 mm (3 ft 6 in)
Pinggu Line, Beijing Subway (167 words) [view diff] exact match in snippet view article find links to article
Operator(s) Beijing Mass Transit Railway Operation Corp., Ltd Technical Line length 72km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 160 km/h (maximum
Meitetsu Bisai Line (202 words) [view diff] exact match in snippet view article find links to article
ridership 11,897 (FY2008) Operation Opened 1898 Owner Meitetsu Technical Line length 30.9 km (19.20 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Overhead
Kanmon Tunnel (572 words) [view diff] exact match in snippet view article find links to article
Honshu-Kyushu Operation Opened 1942 Operator JR Kyushu Character Passenger and freight Technical Line length 3,604 m (11,824 ft)/ 3,614 m (11,857 ft)
Kururi Line (390 words) [view diff] exact match in snippet view article find links to article
Operator(s) JR East Depot(s) Kisarazu Rolling stock KiHa E130 series Technical Line length 32.2 km (20.0 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in)
Meitetsu Inuyama Line (318 words) [view diff] exact match in snippet view article find links to article
http://www.meitetsu.co.jp/ Operation Opened 1910 Owner Meitetsu Technical Line length 26.8 km (16.65 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Line 1 (Metro Bilbao) (158 words) [view diff] exact match in snippet view article
Stations 28 Operation Opened November 11, 1995 Operator(s) Metro Bilbao S.A. Technical Line length 31 km (19 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Sahibganj Loop (942 words) [view diff] exact match in snippet view article find links to article
Opened 1866 Owner Indian Railway Operator(s) Eastern Railway Technical Line length 410 km (255 mi) Number of tracks 1/ 2 Track gauge 1,676 mm (5 ft 6 in)
Punggol LRT Line (601 words) [view diff] exact match in snippet view article find links to article
Mover C810 Mitsubishi Heavy Industries Crystal Mover C810A Technical Line length 10.3 km (6.4 mi) Track gauge 1850 mm Broad Gauge Electrification 750
Tenri Line (219 words) [view diff] exact match in snippet view article find links to article
Line number H Operation Opened 1915 Owner Kintetsu Railway Technical Line length 4.5 km (2.8 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Trunk Line (354 words) [view diff] exact match in snippet view article find links to article
Local and freight trains Rolling stock Class 69 and Class 72 Technical Line length 68 km Track length 112 km Number of tracks 1–2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Webb Dock railway line (329 words) [view diff] exact match in snippet view article find links to article
Operation Opened 27 February 1986 Closed 14 June 1996 Owner V/Line Operator(s) V/Line Technical Line length 7.8 kilometres Track gauge 1,600 mm (5 ft 3 in)
Nandyal–Yerraguntla section (177 words) [view diff] exact match in snippet view article find links to article
2016 Owner Indian Railway Operator(s) South Central Railway Technical Line length 123 km (76 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in) Broad
Hankyū Kōyō Line (130 words) [view diff] exact match in snippet view article find links to article
Shukugawa Kōyōen Operation Opened 1924 Owner Hankyu Railway Technical Line length 2.2 km (1.4 mi) Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Nikkō Line (410 words) [view diff] exact match in snippet view article find links to article
Opened 1890 Owner JR East Rolling stock 205-600 series EMUs Technical Line length 40.5 km (25.2 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Nankai Airport Line (158 words) [view diff] exact match in snippet view article find links to article
series 7100 series 8000 series 9000 series 50000 series Technical Line length 8.8 km (5.5 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in) Electrification
Dongguan Rail Transit (737 words) [view diff] exact match in snippet view article find links to article
plan, in 2010 the planning was further adjusted to increase planned line length to 218 kilometres and 76 stations. Network construction period was extended
S4 (Rhine-Main S-Bahn) (181 words) [view diff] exact match in snippet view article
Regio Depot(s) Frankfurt Hbf Rolling stock DBAG Class 423 Technical Line length 33.5 km (20.8 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Taichung Line (248 words) [view diff] exact match in snippet view article find links to article
Administration Operator(s) Taiwan Railways Administration Technical Line length 85.5 km (53.1 mi) Number of tracks 2 Track gauge 3 ft 6 in (1,067 mm)
Shenzhen–Maoming High Speed Railway (260 words) [view diff] exact match in snippet view article find links to article
Stations 18 Operation Operator(s) China Railway High-speed Technical Line length 387 km (240 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Gudur–Renigunta section (177 words) [view diff] exact match in snippet view article find links to article
ago (1957) Owner Indian Railway Operator(s) South Central Railway Technical Line length 134.78 km (83.75 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in)
Chichibu Main Line (485 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1901 Owner Chichibu Railway Depot(s) Hirosegawara Technical Line length 71.7 km (44.6 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in)
Taiwan Trunk Line (southern section) (88 words) [view diff] exact match in snippet view article
Administration Operator(s) Taiwan Railways Administration Technical Line length 188.9 km (117.4 mi) Number of tracks 2 Track gauge 3 ft 6 in (1,067 mm)
COMMAND.COM (1,291 words) [view diff] exact match in snippet view article find links to article
command1 is executed until termination, then command2. The command line length in interactive mode is limited to 126 characters. “Loading COMMAND.COM”
Hasantha Fernando (219 words) [view diff] no match in snippet view article find links to article
bowling was impressive. He was gentle in pace, but showed variation in line, length and style. He was the professional at Whitehaven Cricket Club in 2006
Keisei Oshiage Line (465 words) [view diff] exact match in snippet view article find links to article
Oshiage Aoto Stations 6 Operation Owner Keisei Electric Railway Technical Line length 5.7 km (3.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius 260
Sakai Line (113 words) [view diff] exact match in snippet view article find links to article
Termini Yonago Sakaiminato Stations 16 Operation Owner JR West Technical Line length 17.9 km (11.1 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in)
Jelgava–Liepāja Railway (67 words) [view diff] exact match in snippet view article find links to article
Jelgava Station Liepāja Station Operation Opened 1929 Operator(s) Latvian Railways Technical Line length 180 km (111.85 mi) Track gauge 1,524 mm (5 ft)
Toyohashi Railroad Atsumi Line (534 words) [view diff] exact match in snippet view article find links to article
Park. The line is entirely within the cities of Toyohashi and Tahara. Line length: 18.0 km (11.2 mi) Number of stations: 16 Track: single Rail gauge: 1
Karasuyama Line (429 words) [view diff] exact match in snippet view article find links to article
Opened 1923 Owner JR East Rolling stock KiHa 40 series DMU Technical Line length 20.4 km (12.7 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in)
S6 (Rhine-Main S-Bahn) (166 words) [view diff] exact match in snippet view article
Regio Depot(s) Frankfurt Hbf Rolling stock DBAG Class 423 Technical Line length 39.1 km (24.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Ube Line (288 words) [view diff] exact match in snippet view article find links to article
Termini Shin-Yamaguchi Ube Stations 18 Operation Owner JR West Technical Line length 33.2 km (20.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Meitetsu Komaki Line (342 words) [view diff] exact match in snippet view article find links to article
Series Nagoya Municipal Subway 7000 series (through service) Technical Line length 20.6 km (12.80 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Overhead
Manchester–Southport line (621 words) [view diff] exact match in snippet view article find links to article
Opened 1855/1888 Owner Network Rail Operator(s) Northern Rail Technical Line length 35.75 miles Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Ahmedabad–Mumbai Main Line (318 words) [view diff] exact match in snippet view article find links to article
Operation Owner Indian Railways Operator(s) Western Railway Technical Line length 493 km (306 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in) Broad
Lopburi Line (128 words) [view diff] exact match in snippet view article find links to article
Lamphong Lop Buri Stations 39 Operation Owner State Railway of Thailand Technical Line length 132.81 km (82.52 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in)
S9 (Rhine-Main S-Bahn) (139 words) [view diff] exact match in snippet view article
DB Regio Depot(s) Frankfurt Hbf Rolling stock DB Class 420 Technical Line length 66.1 km (41.1 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Hankyū Itami Line (153 words) [view diff] exact match in snippet view article find links to article
Operation Operator(s) Hankyu Railway Depot(s) Nishinomiya Depot Technical Line length 3.1 km (1.9 mi) Number of tracks Double Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Sagami Railway Main Line (452 words) [view diff] exact match in snippet view article find links to article
(FY2010) Operation Owner Sagami Railway Depot(s) Kashiwadai Technical Line length 24.6 km (15.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
St Kilda railway line (402 words) [view diff] exact match in snippet view article find links to article
Windsor, Port Melbourne line Stations 5 Operation Opened 1857 Closed 31 July 1987 Technical Line length 4.5 kilometres Number of tracks Double track
Yilan Line (86 words) [view diff] exact match in snippet view article find links to article
Administration Operator(s) Taiwan Railways Administration Technical Line length 93.6 km (58.2 mi) Number of tracks 2 Track gauge 3 ft 6 in (1,067 mm)
Limes Railway (365 words) [view diff] exact match in snippet view article find links to article
Niederhöchstadt–Bad Soden Overview Locale Hesse Line number 3641 Technical Line length 5.2 km (3.2 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Shibayama Railway (443 words) [view diff] exact match in snippet view article find links to article
Electric Railway crews Rolling stock Keisei 3600 series EMU Technical Line length 2.2 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 1,500 V DC
Line 2 (Metro Bilbao) (263 words) [view diff] exact match in snippet view article
Santurzi Stations 25 Operation Opened April 13, 2002 Operator(s) Metro Bilbao S.A. Technical Line length 20 km (12 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
S5 (Rhine-Main S-Bahn) (204 words) [view diff] exact match in snippet view article
Regio Depot(s) Frankfurt Hbf Rolling stock DBAG Class 423 Technical Line length 28.9 km (18.0 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
South Side main line (CTA) (547 words) [view diff] exact match in snippet view article
Railroad (1892–1924) Character Elevated Rolling stock 5000-series Technical Line length 6.5 mi (10.5 km) Track gauge 4 ft 8 1⁄2 in (1,435 mm) Electrification
Kolkata Metro Line 7 (32 words) [view diff] exact match in snippet view article find links to article
Character Underground – 16 Elevated – 4 Depot(s) Joka Technical Line length 38.10 kilometres (23.67 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Abukuma Express Line (198 words) [view diff] exact match in snippet view article find links to article
23 Operation Opened April 1st, 1968 Owner Abukuma Express Technical Line length 54.9 km (34.1 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 500
Gyeongwon Line (704 words) [view diff] exact match in snippet view article find links to article
1911–1914 Owner Korea Rail Network Authority Operator(s) Korail Technical Line length 94.4 km (58.7 mi) Number of tracks Double track (Yongsan–Dongducheon)
Howrah–Bardhaman main line (642 words) [view diff] exact match in snippet view article find links to article
Opened 1854 Owner Indian Railway Operator(s) Eastern Railway Technical Line length 108 km (67 mi) Number of tracks 4 Track gauge 1,676 mm (5 ft 6 in) Broad
JR Tōzai Line (387 words) [view diff] exact match in snippet view article find links to article
Operator(s) JR West Rolling stock 207 series EMU 321 series EMU Technical Line length 12.5 km (7.8 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in)
Nambour and Gympie North railway line (585 words) [view diff] exact match in snippet view article find links to article
Operation Owner Queensland Rail Operator(s) Queensland Rail Technical Line length 180 km (110 mi) Track length 172.21 km (107.01 mi) Track gauge 3 ft 6 in
Daegok–Sosa Line (270 words) [view diff] exact match in snippet view article find links to article
(素砂-大谷線) Sosa-Daegokseon Status Planned Termini Daegok Sosa Stations 5 ~ 8 Operation Opened 2021 (planned) Technical Line length 18.36 km (11.41 mi)
Hjelmslev transformation (488 words) [view diff] exact match in snippet view article find links to article
that there must exist a distinct angle of parallelism for any given line length. Let us say for the length AE, its angle of parallelism is angle BAF
Sealdah South lines (410 words) [view diff] exact match in snippet view article find links to article
Operation Owner Indian Railway Operator(s) Eastern Railway Technical Line length 26 km (16 mi) (Sealdah-Budge Budge), 60 km (37 mi)(Sealdah-Diamond
Line 4, Guangzhou Metro (141 words) [view diff] exact match in snippet view article find links to article
Guangzhou Metro Corporation Character Underground and Elevated Technical Line length 43.7 km (27.15 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Keiō Takao Line (487 words) [view diff] exact match in snippet view article find links to article
Takaosanguchi Stations 7 Operation Opened 1967 Owner Keio Corporation Technical Line length 8.6 km Track gauge 1,372 mm (4 ft 6 in) Electrification 1,500 V DC, overhead
Nippori-Toneri Liner (363 words) [view diff] exact match in snippet view article find links to article
2008 Owner Tokyo Metropolitan Bureau of Transportation (Toei) Technical Line length 9.7 km (6.0 mi) Number of tracks 2 Electrification 600 V DC third rail
Trafford Park Line (322 words) [view diff] exact match in snippet view article find links to article
Character Reserved track & street running Rolling stock M5000 Technical Line length 5.5 km (3.4 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Line 3, Guangzhou Metro (318 words) [view diff] exact match in snippet view article find links to article
Operator(s) Guangzhou Metro Corporation Character Underground Technical Line length 67.3 km (41.82 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Naples–Aversa railway (158 words) [view diff] exact match in snippet view article find links to article
Italy Stations 5 Operation Opened 2005 (2005) Operator(s) EAV Technical Line length 10.5 km (6.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Valiant-class ship of the line (188 words) [view diff] case mismatch in snippet view article find links to article
August 1759 - 1850 Completed: 2 General characteristics Type: Ship of the line Length: 172 ft (52 m) (gundeck) 139 ft (42 m) (keel) Beam: 49 ft 8 in (15
Nippori-Toneri Liner (363 words) [view diff] exact match in snippet view article find links to article
2008 Owner Tokyo Metropolitan Bureau of Transportation (Toei) Technical Line length 9.7 km (6.0 mi) Number of tracks 2 Electrification 600 V DC third rail
Metronit (588 words) [view diff] case mismatch in snippet view article find links to article
Line Length Towns served Route description Number of stations Frequency Approximate journey time (end to end) Red Line (Line 1) 25 km Kiryat Motzkin,
Manassas Line (180 words) [view diff] exact match in snippet view article find links to article
Virginia Railway Express Character grade-separated, Underground and above ground Technical Line length 35 miles (56 km) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Qinhuangdao–Shenyang High-Speed Railway (220 words) [view diff] exact match in snippet view article find links to article
Qinshen Passenger Railway Line length: 404 km Track gauge: 1,435 Voltage: 50Hz 25,000V AC Maximum speed: 250 km/h
Ararat V/Line rail service (292 words) [view diff] exact match in snippet view article find links to article
Bacchus Marsh Operation Rolling stock Sprinter and VLocity railcars Technical Line length 212.81 km Number of tracks Single track with crossing loops
Line 3, Guangzhou Metro (318 words) [view diff] exact match in snippet view article find links to article
Operator(s) Guangzhou Metro Corporation Character Underground Technical Line length 67.3 km (41.82 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Naples–Aversa railway (158 words) [view diff] exact match in snippet view article find links to article
Italy Stations 5 Operation Opened 2005 (2005) Operator(s) EAV Technical Line length 10.5 km (6.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Nanjing–Gaochun Intercity Railway (344 words) [view diff] exact match in snippet view article find links to article
Operation Opened July 1, 2014 Character Underground and elevated Technical Line length 35.8 km (22.2 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
North-Link Line (87 words) [view diff] exact match in snippet view article find links to article
Administration Operator(s) Taiwan Railways Administration Technical Line length 79.2 km (49.2 mi) Number of tracks 2 Track gauge 3 ft 6 in (1,067 mm)
Keihan Ōtō Line (117 words) [view diff] exact match in snippet view article find links to article
Operation Opened 5 October 1989 Owner Keihan Electric Railway Technical Line length 2.3 km (1.4 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Sosa–Wonsi Line (484 words) [view diff] exact match in snippet view article find links to article
Status Under Construction Termini Sosa Wonsi Stations 12 Operation Opened 2018 (planned) Technical Line length 23.3 km (14.5 mi) Number of tracks 2
Domyoji Line (349 words) [view diff] exact match in snippet view article find links to article
March 24, 1898 Operator(s) Kintetsu Railway Depot(s) Furuichi Technical Line length 2.2 km (1.4 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Electrification
Wadamisaki Line (267 words) [view diff] exact match in snippet view article find links to article
Wadamisaki Stations 2 Operation Opened 8 July 1890 Owner JR West Technical Line length 2.7 km (1.7 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Line 6, Tianjin Metro (106 words) [view diff] exact match in snippet view article find links to article
Metro Corporation Character Underground, At-grade, & Elevated Technical Line length 26 km (16.16 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Taiwan Trunk Line (northern section) (101 words) [view diff] exact match in snippet view article
Administration Operator(s) Taiwan Railways Administration Technical Line length 125.4 km (77.9 mi) Number of tracks 2 Track gauge 3 ft 6 in (1,067 mm)
Kashima Line (516 words) [view diff] exact match in snippet view article find links to article
Opened 1970 Owner JR East Operator(s) JR East, JR Freight Technical Line length 17.4 km (10.8 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Line 2, Nanjing Metro (345 words) [view diff] exact match in snippet view article find links to article
28, 2010 Character Underground, ground level, and elevated Technical Line length 37.95 km (23.58 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Trams in Berlin (3,941 words) [view diff] exact match in snippet view article find links to article
190 kilometres (120 mi) in route length and 430 kilometres (270 mi) in line length. Nine of the lines, called Metrotram, are operated 24 hours per day,
Lyon Metro Line A (244 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1978 Last extension 2007 Rolling stock MPL 75 Technical Line length 9.2 km (5.7 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Rack system None
Line 1 (Budapest Metro) (417 words) [view diff] exact match in snippet view article
Overview Stations 11 Line number Line 1 ("Yellow metro") Technical Line length 4.4 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 550 V DC
Harbin–Jiamusi Intercity Railway (218 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Operator(s) China Railway High-speed Technical Line length 353 km (219 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
U2 (Vienna U-Bahn) (76 words) [view diff] exact match in snippet view article
Termini Karlsplatz Seestadt Stations 20 Operation Opened 1980 Operator(s) Wiener Linien Technical Line length 16.7 km Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tōkyū Tamagawa Line (283 words) [view diff] exact match in snippet view article find links to article
Stations 7 Operation Opened 6 August 2000 Owner Tokyu Corporation Technical Line length 5.6 km (3.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Changsha–Zhuzhou–Xiangtan Intercity Railway (480 words) [view diff] exact match in snippet view article find links to article
Opened December 26, 2016 Operator(s) China Railway High-speed Technical Line length 97.5 km (61 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Yamagata Shinkansen (424 words) [view diff] exact match in snippet view article find links to article
Owner JR East Rolling stock E3-1000 series/E3-2000 series Technical Line length 148.6 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 20 kV AC
Uchiko Line (474 words) [view diff] exact match in snippet view article find links to article
Niiya Stations 4 Operation Opened 1920 Operator(s) JR Shikoku Technical Line length 5.3 km (3.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Brescia–Cremona railway (75 words) [view diff] exact match in snippet view article find links to article
December 15, 1866 (1866-12-15) Owner RFI Operator(s) Trenord Technical Line length 50 km (31 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 3
KLIA Ekspres (986 words) [view diff] exact match in snippet view article find links to article
Conduction system With driver Rolling stock Siemens Desiro ET 425 M Electric Multiple Unit Technical Line length 57 km Track gauge 1 435 mm Standard gauge
Kollam–Thiruvananthapuram trunk line (351 words) [view diff] exact match in snippet view article find links to article
WDG-4 Events Extension upto TVC 1931 Electrification 2006 Technical Line length 65 kilometres (40 mi) Track length 65 kilometres (40 mi) Number of tracks
Sengkang LRT Line (389 words) [view diff] exact match in snippet view article find links to article
Mover C810 Mitsubishi Heavy Industries Crystal Mover C810A Technical Line length 10.7 km (6.6 mi) Track gauge 1850 mm Broad Gauge Electrification 750
Harbin–Mudanjiang Intercity Railway (473 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Operator(s) China Railway High-speed Technical Line length 293.2 km (182 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Oslo Port Line (196 words) [view diff] exact match in snippet view article find links to article
Railways Operator(s) Norwegian State Railways Character Freight Technical Line length 2.2 km Track length 2.2 km Number of tracks Single Track gauge 1,435 mm
Gjøvik Line (293 words) [view diff] exact match in snippet view article find links to article
Operator(s) NSB Anbud Character Passenger trains Rolling stock BM69G Technical Line length 124 km Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
RER C (618 words) [view diff] exact match in snippet view article find links to article
(last extension in 2006) Rolling stock Z 5600, Z 8800, Z 20500, Z 20900 Technical Line length 185.6 km (115.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Rome–Civitacastellana–Viterbo railway (202 words) [view diff] exact match in snippet view article find links to article
Viterbo Website ATAC (Italian) Operation Operator(s) ATAC Technical Line length 102 km (63 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 3
Sasaguri Line (217 words) [view diff] exact match in snippet view article find links to article
Termini Keisen Yoshizuka Stations 11 Operation Owner JR Kyushu Technical Line length 25.1 km (15.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 20
Moscow (18,048 words) [view diff] exact match in snippet view article find links to article
a trolleybus route and have trolley wires over them. With the total line length of almost 600 kilometres (370 miles) of single wire, 8 depots, 104 routes
Gyeonggang Line (288 words) [view diff] exact match in snippet view article find links to article
Bubal Depot Rolling stock Korail Class 371000 (12 trains) Technical Line length 53.8 km (33.4 mi) or 54.8 km (34.1 mi) Number of tracks 2 Track gauge
Wakayama Line (157 words) [view diff] exact match in snippet view article find links to article
series, 103 series, 117 series, 221 series, 201 series EMUs Technical Line length 87.5 km (54.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Agnita railway line (384 words) [view diff] exact match in snippet view article find links to article
Infrastructură Operator(s) CFR Călători Character Rural Branch line Technical Line length Sibiu - Agnita 58 km (36 mi) (Historically Sibiu - Sighișoara 109 km
Seibu Tamako Line (422 words) [view diff] exact match in snippet view article find links to article
Railway Rolling stock Seibu 101 series and Seibu 3000 series Technical Line length 9.2 km (5.7 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Electrification
Camden Line (178 words) [view diff] exact match in snippet view article find links to article
(tracks) Operator(s) Bombardier Transportation/Maryland Transit Administration Technical Line length 39 mi (63 km) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Shi (poetry) (569 words) [view diff] exact match in snippet view article
included in the Classic, there are few formal constraints apart from line length (usually four characters and no more than seven) and rhyming every other
Sungai Buloh-Serdang-Putrajaya MRT Line (931 words) [view diff] exact match in snippet view article find links to article
trains Proposed rolling stock image Rolling stocks formation Technical Line length 52.2 km (32.4 mi) Elevated: 38.75 km (24.08 mi) Underground: 13.5 km
Platte Valley Trolley (629 words) [view diff] exact match in snippet view article find links to article
Opened July 4, 1989 Operator(s) Denver Tramway Heritage Society Technical Line length 1.2 miles Track gauge 4 ft 8 1⁄2 in (1,435 mm) Minimum radius (?) Electrification
Seymour V/Line rail service (134 words) [view diff] exact match in snippet view article find links to article
VLocity railcars, locomotive hauled N and H type carriages Technical Line length 81 km (50.3 mi) Number of tracks Double broad gauge track to near Seymour
Penn Central Transportation Company (1,877 words) [view diff] case mismatch in snippet view article find links to article
Philadelphia-Harrisburg; North Jersey Coast Line 700V DC: Harlem Line; Hudson Line Length 20,530 miles (33,040 kilometres) Headquarters Philadelphia, Pennsylvania
Meitetsu Seto Line (206 words) [view diff] exact match in snippet view article find links to article
Meitetsu Rolling stock Meitetsu 4000 series Meitetsu 6000 series Technical Line length 20.6 km (12.8 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
U8 (Frankfurt U-Bahn) (50 words) [view diff] exact match in snippet view article
Stadtwerke Frankfurt Rolling stock U4-Triebwagen, U5-Triebwagen Technical Line length 12.1 km (7.5 mi) 25 minutes (avg.) Operating speed 29 km/h (18 mph) average
Seibu Haijima Line (444 words) [view diff] exact match in snippet view article find links to article
Termini Kodaira Haijima Stations 8 Operation Owner Seibu Railway Technical Line length 14.3 km (8.9 mi) Number of tracks 2 (Single-tracked: from Tamagawa-Jōsui
503 Kingston Rd (237 words) [view diff] exact match in snippet view article find links to article
Toronto Transit Commission Depot(s) Russell Rolling stock CLRV Technical Line length 8.97 km (5.57 mi) Track gauge 4 ft 10 7⁄8 in (1,495 mm) - TTC Gauge
Obama Line (233 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1917 Owner JR West Rolling stock 125 series Technical Line length 84.3 km (52.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
South West Rail Link (1,531 words) [view diff] exact match in snippet view article find links to article
Operator(s) Sydney Trains Rolling stock S, K, C, M and A sets Technical Line length 11.4 km (7.1 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Line 3, Wuhan Metro (353 words) [view diff] exact match in snippet view article find links to article
, Ltd. Character Underground Rolling stock Chinese Type B Technical Line length 33.2 km (20.63 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Blue Line (Yokohama) (557 words) [view diff] exact match in snippet view article
Subway Depot(s) Kaminagaya, Nippa Rolling stock 3000 series Technical Line length 40.4 km (25.1 mi) (Line 1: 19.7 km, Line 3: 20.7 km) Track gauge 1,435 mm
KA Commuter Line Duri-Tangerang (96 words) [view diff] exact match in snippet view article find links to article
Api Operator(s) PT KAI Commuter Jabodetabek (PT KCJ) Depot(s) Tangerang Technical Line length 19.297 km (11.991 mi) Track gauge 1,067 mm (3 ft 6 in)
Bankura–Masagram line (562 words) [view diff] exact match in snippet view article find links to article
railway) Owner Indian Railway Operator(s) South Eastern Railway Technical Line length Broad gauge: 116 km (72 mi) Track gauge 1,676 mm (5 ft 6 in) Broad Gauge
511 Bathurst (399 words) [view diff] exact match in snippet view article find links to article
Roncesvalles, Russell Rolling stock CLRV, ALRV, Flexity Outlook Technical Line length 6.47 km (4.02 mi) Track gauge 4 ft 10 7⁄8 in (1,495 mm) - TTC Gauge
Ban'etsu East Line (388 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1915; 102 years ago (1915) Operator(s) JR East Technical Line length 85.6 km (53.19 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Trans-Harbour line (Mumbai Suburban Railway) (188 words) [view diff] exact match in snippet view article
(passengers) Owner Indian Railway Operator(s) Central Railway (CR) Character At Grade Technical Line length 20 km Track gauge 1,676 mm (5 ft 6 in) Broad gauge
HSL 4 (700 words) [view diff] exact match in snippet view article find links to article
Opened 2009 Operator(s) National Railway Company of Belgium Technical Line length 36 km (22 mi) Number of tracks double track Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 3, Chongqing Rail Transit (259 words) [view diff] exact match in snippet view article find links to article
(2014 Daily Avg.) 1,080,000 (2016 Peak) Operation Opened 29 Sept 2011 Operator(s) Chongqing Rail Transit Corp., Ltd Technical Line length 66 km (41 mi)
Sealdah–Hasnabad–Bangaon–Ranaghat line (310 words) [view diff] exact match in snippet view article find links to article
Operation Owner Indian Railway Operator(s) Eastern Railway Technical Line length Sealdah-Bongaon: 77 km (48 mi) Barasat-Hasnabad: 52 km (32 mi) Ranaghat-Bangaon:
Mauritania Railway (426 words) [view diff] exact match in snippet view article find links to article
Mauritania Railway Map of Mauritania Railway Line length: 704 km (437 mi) Track gauge: 1,435 mm (4 ft 8 1⁄2 in) standard gauge Legend
LGV Méditerranée (948 words) [view diff] exact match in snippet view article find links to article
Nîmes Operation Opened 2001 Owner SNCF Réseau Operator(s) SNCF Technical Line length 216 km (134 mi) + 28 km (17 mi) (western branch) Number of tracks Double
Welsh Marches line (679 words) [view diff] exact match in snippet view article find links to article
Crewe) 15 (Newport to Chester) Operation Owner Network Rail Technical Line length 84.38 miles (135.80 km) Number of tracks Double track throughout Track
Circumflegrea railway (196 words) [view diff] exact match in snippet view article find links to article
Campania, Italy Operation Opened 1963 to 1986 Operator(s) EAV Technical Line length 27.042 km (16.803 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Pavia–Alessandria railway (82 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1862 (1862) Owner RFI Operator(s) Trenord Technical Line length 63 km (39 mi) Number of tracks 1 (Pavia–Torreberetti) 2 (Torreberetti–Alessandria)
Line S1, BCR (315 words) [view diff] exact match in snippet view article find links to article
Shimenying Pingguoyuan Operation Operator(s) Beijing Railway Bureau Technical Line length 18.869 kilometres (11.725 mi) Operating speed 110 km/h (68 mph)
Northeastern Line (Thailand) (559 words) [view diff] exact match in snippet view article
Depot, Nakhon Ratchasima Depot, and Ubon Ratchathani Depot Technical Line length 575 km (357 mi) (Ubon Ratchathani Main Line) 627.5 km (389.9 mi) (Nong
Bakhtiyarpur–Tilaiya line (414 words) [view diff] exact match in snippet view article find links to article
Opened 1962 / 2010 Owner Indian Railway Operator(s) East Central Railway Technical Line length 100 km (62 mi) Track gauge Broad Gauge 1,676 mm (5 ft 6 in)
Yokohama Minatomirai Railway Kodomonokuni Line (416 words) [view diff] exact match in snippet view article find links to article
Minatomirai Railway Company Operator(s) Tokyu Corporation Technical Line length 3.4 km (2 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
New Delhi–Mumbai main line (313 words) [view diff] exact match in snippet view article find links to article
North Central Railway, West Central Railway, Western Railway Technical Line length 1,386 km (861 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in)
SouthSide Corridor (68 words) [view diff] exact match in snippet view article find links to article
Locale Greater St. Louis Operation Operator(s) Bi-State Development Agency Technical Line length 9–17-mile (14–27 km) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Kashii Line (142 words) [view diff] exact match in snippet view article find links to article
Stations 16 Operation Opened 1 January 1904 Owner JR Kyushu Technical Line length 25.4 km (15.8 mi) Number of tracks Single Track gauge 1,067 mm (3 ft 6 in)
Bairnsdale V/Line rail service (280 words) [view diff] exact match in snippet view article find links to article
Rolling stock V/Line N class locomotive hauled N type carriages Technical Line length 276.8 km Number of tracks Double track to Drouin, single track with passing
Port Klang Line (413 words) [view diff] exact match in snippet view article find links to article
Komuter CSR EMU 37 six-car trains Rolling stocks formation Technical Line length 52 km (32 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in) Electrification Overhead
Yamada Line (JR East) (442 words) [view diff] exact match in snippet view article
Stations 28 Operation Opened 10 October 1923 Owner JR East Technical Line length 157.5 km (97.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Yamatoji Line (582 words) [view diff] exact match in snippet view article find links to article
Nara - Kyuhoji) 321 series EMU (Kizu — Nara, Nara - Kyuhoji) Technical Line length 54.0 km (33.6 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in)
Tenali–Repalle branch line (186 words) [view diff] exact match in snippet view article find links to article
South Central Railway zone Character At-grade street running Technical Line length 32.10 km (19.95 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in)
Beijing–Tianjin Intercity Railway (2,215 words) [view diff] exact match in snippet view article find links to article
Owner China Railways Operator(s) China Railway High-speed Technical Line length Phase I 117 km (73 mi) Phase II 44 km (27 mi) Total 161 km (100 mi)
Holmfirth Branch Line (968 words) [view diff] exact match in snippet view article find links to article
Stations 2 Operation Opened 1 July 1850 Closed 2 November 1959 Technical Line length 2 mi (3.2 km) Number of tracks Double Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Metre (poetry) (6,455 words) [view diff] exact match in snippet view article
extent, but moves toward variations in line length. Han Dynasty poetry tended towards the variable line-length forms of the folk ballads and the Music
Mihintale Line (164 words) [view diff] exact match in snippet view article find links to article
Mihintale Operation Opened 1993 Owner Sri Lanka Railways Operator(s) Sri Lanka Railways Technical Line length 7 mi (11 km) Track gauge 5 ft 6 in (1,676 mm)
Sperillen Line (209 words) [view diff] exact match in snippet view article find links to article
Operator(s) Norwegian State Railways Character Passenger and freight Technical Line length 23.91 kilometres (15 mi) Number of tracks Single Track gauge 1,435 mm
Shoranur–Mangalore section (122 words) [view diff] exact match in snippet view article find links to article
Operator(s) Palakkad Railway Division of Southern Railway zone Technical Line length 307 km (190.76 mi) Track length 307 km (190.76 mi) Number of tracks 2
Beijing–Shanghai Railway (549 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1912 (first section) Operator(s) China Railways Technical Line length 1,462 km (908 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Bandar Utama-Klang Line (1,271 words) [view diff] exact match in snippet view article find links to article
Rolling stock 6-cars configuration SkyTrain technology trainset Technical Line length 37 km (23 mi) inc. 2km underground tunnel Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Inverell railway line (1,095 words) [view diff] exact match in snippet view article find links to article
waiting to depart Moree railway station, junction of Inverell branchline in 1911 Line length: 153.93 km (95.65 mi) Track gauge: 4 ft 8 1⁄2 in (1,435 mm)
Line 2, Tianjin Metro (195 words) [view diff] exact match in snippet view article find links to article
Operator(s) Tianjin Metro Corporation Character Underground Technical Line length 27.157 km (16.87 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Nankai Main Line (1,178 words) [view diff] exact match in snippet view article find links to article
waves, or distinguished with blue from conifer or green Kōya Line. Line length: 64.2 km (39.9 mi) Track: quadruple from Namba to Suminoe (to Kishinosato-Tamade
Yellow Line (Delhi Metro) (326 words) [view diff] exact match in snippet view article
Rolling stock Mitsubishi-ROTEM Broad gauge Bombardier MOVIA Technical Line length 48.8 kilometers (30.3 mi) Track gauge Broad gauge Electrification 25
Waterbury Branch (408 words) [view diff] exact match in snippet view article find links to article
stock GE Genesis P32AC-DM Brookville BL20GH Shoreliner coaches Technical Line length 28.5 mi (45.87 km) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Keihan Main Line (341 words) [view diff] exact match in snippet view article find links to article
1910 Owner Keihan Electric Railway Depot(s) Neyagawa, Yodo Technical Line length 49.3 km (30.6 mi) Number of tracks 2 (Yodoyabashi - Temmabashi, Neyagawa
Poetry (10,791 words) [view diff] exact match in snippet view article find links to article
poem is normal; either way with the even numbered lines rhyming. The line length is scanned by according number of characters (according to the convention
Telephone (5,019 words) [view diff] exact match in snippet view article find links to article
adjusts the line's resistance (B1) to maximize the signal power for the line length. Telephones have similar adjustments for inside line lengths (A8). The
Muzaffarpur–Hajipur section (301 words) [view diff] exact match in snippet view article find links to article
stock Diesel Locos: WDM-2, WDM-3A, WDS-5, WDP 4 and WDG 4 Technical Line length 53.83 km (33.4 mi) Track length 59 km (36.7 mi) Number of tracks 1 (electrified)
Córdoba North Western Railway (259 words) [view diff] exact match in snippet view article find links to article
1901; 115 years ago (1901) (merged to Córdoba Central Railway) Technical Line length 152 km (94 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in) metre gauge
Bardhaman–Asansol section (866 words) [view diff] exact match in snippet view article find links to article
1855–1863 Owner Indian Railway Operator(s) Eastern Railway Technical Line length 106 km (66 mi) Number of tracks 4 (2 up and 2 dn) Track gauge 1,676 mm
Metre (poetry) (6,455 words) [view diff] exact match in snippet view article
extent, but moves toward variations in line length. Han Dynasty poetry tended towards the variable line-length forms of the folk ballads and the Music
Shorkot–Sheikhupura Branch Line (254 words) [view diff] exact match in snippet view article find links to article
Owner Pakistan Railways Operator(s) Pakistan Railways Technical Line length 314 km (195 mi) Track gauge 1,676 mm (5 ft 6 in) Operating speed 105 km/h
Taita Line (236 words) [view diff] exact match in snippet view article find links to article
Mino-Ōta Stations 8 Operation Opened 1926 Owner JR Central Technical Line length 17.8 km (11.1 mi) Number of tracks Single Track gauge 1,067 mm (3 ft 6 in)
Port Klang Line (413 words) [view diff] exact match in snippet view article find links to article
Komuter CSR EMU 37 six-car trains Rolling stocks formation Technical Line length 52 km (32 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in) Electrification Overhead
Beijing–Harbin Railway (475 words) [view diff] exact match in snippet view article find links to article
Beijing-Harbin Railway Line length: 1,249 km (776 mi) Track gauge: 1,435 mm (4 ft 8 1⁄2 in) Stations and structures Legend
Trans-Gabon Railway (752 words) [view diff] exact match in snippet view article find links to article
Termini Libreville Franceville Stations 23 Operation Opened 1987 Technical Line length 669 km (416 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Tōkyū Tōyoko Line (806 words) [view diff] exact match in snippet view article find links to article
Operation Opened 14 February 1926 Owner Tokyu Corporation Technical Line length 24.2 km (15.0 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Ningbo–Taizhou–Wenzhou Railway (511 words) [view diff] exact match in snippet view article find links to article
active) Operation Owner China Railways Operator(s) China Railway High-speed Technical Line length 275 km (171 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Inverell railway line (1,095 words) [view diff] exact match in snippet view article find links to article
waiting to depart Moree railway station, junction of Inverell branchline in 1911 Line length: 153.93 km (95.65 mi) Track gauge: 4 ft 8 1⁄2 in (1,435 mm)
Peterborough–Lincoln line (347 words) [view diff] exact match in snippet view article find links to article
Rolling stock Class 153 Super Sprinter Class 156 Super Sprinter Technical Line length ~24 mi (39 km) Number of tracks Two Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Waterbury Branch (408 words) [view diff] exact match in snippet view article find links to article
stock GE Genesis P32AC-DM Brookville BL20GH Shoreliner coaches Technical Line length 28.5 mi (45.87 km) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Keihan Main Line (341 words) [view diff] exact match in snippet view article find links to article
1910 Owner Keihan Electric Railway Depot(s) Neyagawa, Yodo Technical Line length 49.3 km (30.6 mi) Number of tracks 2 (Yodoyabashi - Temmabashi, Neyagawa
Line 6, Shenzhen Metro (1,435 words) [view diff] exact match in snippet view article find links to article
proposed to start from Baoan International Airport to Songgang, with a line length of about 15 km. It was envisioned as an extension of the still under
Paris Métro Line 5 (589 words) [view diff] exact match in snippet view article find links to article
Conductor Rolling stock MF 01 (53 trains as of 8 October 2016) Technical Line length 14.6 km (9.1 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Jōetsu Shinkansen (1,002 words) [view diff] exact match in snippet view article find links to article
Owner JR East Depot(s) Niigata Rolling stock E2/E4 series Technical Line length 269.5 km (167.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Line D (Buenos Aires Underground) (832 words) [view diff] exact match in snippet view article
Character Underground Rolling stock 100 Series, Fiat-Materfer Technical Line length 11 km (6.84 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
GO-ALRT (501 words) [view diff] exact match in snippet view article find links to article
GO Transit Rolling stock modified ICTS Mark I (articulated) Technical Line length 200 km (approximate) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
KLIA Transit (837 words) [view diff] exact match in snippet view article find links to article
Rolling stock Siemens Desiro ET 425 M Electric Multiple Unit Technical Line length 57 km (35 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Sagano Line (306 words) [view diff] exact match in snippet view article find links to article
Termini Kyoto Sonobe Operation Opened 1988 (1897) Owner JR West Technical Line length 34.2 km (21.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Nanning–Kunming High-Speed Railway (697 words) [view diff] exact match in snippet view article find links to article
(Baise-Kunming) December 28, 2016 Operator(s) China Railway High-speed Technical Line length 709.518 km (441 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius
New Jalpaiguri–New Bongaigaon section (593 words) [view diff] exact match in snippet view article find links to article
2003 Owner Indian Railways Operator(s) Northeast Frontier Railway Technical Line length 248 km (154 mi) Track gauge 1,676 mm (5 ft 6 in) broad gauge
SRT Dark Red Line (1,113 words) [view diff] exact match in snippet view article find links to article
Hua Lamphong - Maha Chai) Owner State Railway of Thailand Technical Line length 80.8 km (50.21 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in) metre gauge Electrification
Katihar–Siliguri line (575 words) [view diff] exact match in snippet view article find links to article
Owner Indian Railway Operator(s) Northeast Frontier Railway Technical Line length 203 kilometres (126 mi) Track gauge 1,676 mm (5 ft 6 in) Broad gauge
Trans-Dublin (326 words) [view diff] exact match in snippet view article find links to article
Fairview Rolling stock 8100 Class 8500, 8510 and 8520 Classes Technical Line length 53 km Number of tracks 2-4 Track gauge 1,600 mm (5 ft 3 in) Electrification
Kitakami Line (143 words) [view diff] exact match in snippet view article find links to article
Yokote Stations 17 Operation Opened 1924 Operator(s) JR East Technical Line length 61.6 km (38.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification non
Line S2, BCR (410 words) [view diff] exact match in snippet view article find links to article
2008 Operator(s) Beijing Suburban Railway Rolling stock NDJ3 Technical Line length 77.07 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 120 km/h
Getty Center Monorail (282 words) [view diff] exact match in snippet view article find links to article
Getty Center (upper station) Stations 2 Operation Opened 1997 Rolling stock 6 cars Technical Line length 1.21 km (0.75 mi) Number of tracks 1 (Monorail)
Randsfjorden Line (468 words) [view diff] exact match in snippet view article find links to article
Character Long-haul passenger traffic Rolling stock BM 73 Technical Line length 87 kilometres (54 mi) Number of tracks 1 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Samastipur–Muzaffarpur section (304 words) [view diff] exact match in snippet view article find links to article
Samastipur Rolling stock WDM-2, WDM-3A, WDS-5, WDP 4 and WDG 4 Technical Line length 53 km (33 mi) Track length 125 km (78 mi) Number of tracks 2 (electrified)
Barauni–Katihar section (792 words) [view diff] exact match in snippet view article find links to article
Railway Operator(s) East Central Railway, Northeast Frontier Railway Technical Line length 185 km (115 mi) Track gauge 1,676 mm (5 ft 6 in) Broad gauge
Paris Métro Line 9 (904 words) [view diff] exact match in snippet view article find links to article
MF 01 (67 trains in revenue service as of 17 November 2016. Technical Line length 19.6 km (12.2 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Paris Métro Line 3 (815 words) [view diff] exact match in snippet view article find links to article
(OCTYS) Rolling stock MF 67 (48 trains as of October 31, 2010) Technical Line length 11.665 km (7.248 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Barauni–Samastipur section (249 words) [view diff] exact match in snippet view article find links to article
Samastipur Rolling stock WDM-2, WDM-3A, WDS-5, WDP 4 and WDG 4 Technical Line length 50.54 km (31 mi) Track length 120 km (75 mi) Number of tracks 2 (electrified)
Ui LRT (135 words) [view diff] exact match in snippet view article find links to article
Ui Sinseol-dong Stations 13 Operation Opened July 2017 (planned) Technical Line length 11.4 km (7.1 mi) Number of tracks 2 Operating speed 70~80 km/h
Miyazu Line (371 words) [view diff] exact match in snippet view article find links to article
1924 Owner Kitakinki Tango Railway Operator(s) Willer Trains Technical Line length 83.6 km (51.9 mi) Track gauge 1,067 mm (3 ft 6 in) Operating speed 85 km/h
Liverpool–Parramatta T-way (1,004 words) [view diff] exact match in snippet view article find links to article
Parramatta Stations 35 Operation Opened February 2003 Owner Transport for NSW Operator(s) Transit Systems Sydney Technical Line length 30 km (19 mi)
Line 2, Guangzhou Metro (143 words) [view diff] exact match in snippet view article find links to article
Operator(s) Guangzhou Metro Corporation Character Underground Technical Line length 31.4 km (19.51 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Fukuen Line (293 words) [view diff] exact match in snippet view article find links to article
Prefecture Termini Fukuyama Miyoshi Operation Owner JR West Technical Line length 85.1 km (52.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Tokyo Metro Hanzōmon Line (811 words) [view diff] exact match in snippet view article find links to article
series, Tokyu 8590 series, Tobu 30000 series, Tobu 50050 series Technical Line length 16.8 km (10.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
KA Commuter Line Tanah Abang-Maja (332 words) [view diff] exact match in snippet view article find links to article
Operator(s) PT KAI Commuter Jabodetabek (PT KCJ) Depot(s) Depok, Bukit Duri Technical Line length 55.629 km (34.566 mi) Track gauge 1,067 mm (3 ft 6 in)
Ōminato Line (263 words) [view diff] exact match in snippet view article find links to article
Owner East Japan Railway Company Rolling stock KiHa 100 series Technical Line length 58.4 km (36.3 mi) Track gauge 3 ft 6 in (1,067 mm) Electrification none
Hakata-Minami Line (256 words) [view diff] exact match in snippet view article find links to article
stock 500-7000 series, 700-7000 series, N700-7000/8000 series Technical Line length 8.5 km (5.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Hakushin Line (257 words) [view diff] exact match in snippet view article find links to article
Shibata Stations 10 Operation Opened 1952 Operator(s) JR East Technical Line length 27.3 km (17.0 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Tucheng Line, Taipei Metro (153 words) [view diff] exact match in snippet view article find links to article
and C341 trains 3 cars per set, 2 sets per train (6 cars) Technical Line length 7.5 km (4.7 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Pļaviņas–Gulbene Railway (96 words) [view diff] exact match in snippet view article find links to article
Pļaviņas Station Gulbene Station Operation Opened 1903 Operator(s) Latvian Railways Technical Line length 98 km (60.89 mi) Track gauge 1,524 mm (5 ft)
Nakamura Line (189 words) [view diff] exact match in snippet view article find links to article
Operation Opened 18 December 1963 Owner Tosa Kuroshio Railway Technical Line length 43.0 km (26.7 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 250
Paris Métro Line 2 (686 words) [view diff] exact match in snippet view article find links to article
system Conductor (PA) Rolling stock MF 2000 (45 trains as of March 22, 2011) Technical Line length 12.4 km (7.7 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tokyo Metro Hibiya Line (919 words) [view diff] exact match in snippet view article find links to article
Takenotsuka Rolling stock Tokyo Metro 03 series, Tobu 20000 series Technical Line length 20.3 km (12.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
West Bengal State Electricity Transmission Company (566 words) [view diff] exact match in snippet view article find links to article
2009-10 among all state utilities. At the end of 2009-10, its transmission line length stood at over 11,450 ckt. km, growing at a CAGR of 6.5% from 2005-06