Find link

langauge:

Find link is a tool written by Edward Betts.

searching for Line length 542 found (4122 total)

alternate case: line length

Fathom (1,530 words) [view diff] no match in snippet view article find links to article

A fathom is a unit of length in the imperial and the U.S. customary systems equal to 6 feet (1.8288 metres), used especially for measuring the depth of
Qingdao–Rongcheng Intercity Railway (971 words) [view diff] exact match in snippet view article find links to article
travels along the Shandong Peninsula connecting to Qingdao and Rongcheng. Line length is 298.842 km (186 mi) (containing a total length of sidings, spurs and
Sporveien T-banen (106 words) [view diff] exact match in snippet view article find links to article
Akershus. The company has 521 employees, and operates 217 metro cars with a line length of 103.9 km. A total of 63.5 million passengers used the rapid transit
Line (unit) (539 words) [view diff] no match in snippet view article
For the equivalent French unit, see Paris line. The line (abbreviated L or l) was a small English unit of length, variously reckoned as  1⁄10,  1⁄12,  1⁄16
Seoul Subway Line 2 (594 words) [view diff] exact match in snippet view article find links to article
Seongsu Branch (5.4 km) and the Sinjeong Branch (6.0 km) for a total line length of 60.2 km. The Line 2 loop is the second longest subway loop in the
Liuzhou–Nanning Intercity Railway (119 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Operator(s) China Railway High-speed Technical Line length 226 km (140 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Strophe (745 words) [view diff] exact match in snippet view article find links to article
also mean a structural division of a poem containing stanzas of varying line length. Strophic poetry is to be contrasted with poems composed line-by-line
Trams in Aachen (223 words) [view diff] exact match in snippet view article find links to article
At its maximum extent, its route length was 181.4 kilometers and its line length was 213.5 kilometers. In 1914, it was the fourth largest tramway network
RS-422 (1,153 words) [view diff] exact match in snippet view article find links to article
standard, but is included for information purposes only.) Limitations on line length and data rate varies with the parameters of the cable length, balance
Beijing–Tangshan Intercity Railway (286 words) [view diff] exact match in snippet view article find links to article
and Fengrun. Finally it terminates at Tangshan Railway Station. Total line length of will be approximately 163 km, a total of seven stations, with a design
Yuefu (953 words) [view diff] exact match in snippet view article find links to article
now lost folk ballad tunes; although, later, the five-character fixed-line length became common. However, as a term of classification yuefu has a certain
Classical Chinese poetry forms (5,058 words) [view diff] exact match in snippet view article find links to article
poems: this includes such poetic characteristics as meter (such as, line length and number of lines), rhythm (for example, presence of caesuras, end-stopping
Chongqing–Wanzhou Intercity Railway (125 words) [view diff] exact match in snippet view article find links to article
Opened November 29, 2016 Operator(s) China Railway High-speed Technical Line length 248 km (154 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Transport in Serbia (263 words) [view diff] exact match in snippet view article find links to article
length: 4,093 km Line length: 3,809 km Main lines length: 1,768 km Length of other lines I and II category; 2,041 km Electrified line length: 1,279 km Narrow
Hainan Western Ring High-Speed Railway (455 words) [view diff] exact match in snippet view article find links to article
Operation Opened 30 December 2015 Rolling stock CRH1A, CRH380A Technical Line length 344 kilometres (214 mi) Number of tracks FLUG Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Quoted-printable (911 words) [view diff] exact match in snippet view article find links to article
sign = as an escape character. It also limits line length to 76, as some software has limits on line length. MIME defines mechanisms for sending other
Clerihew (969 words) [view diff] exact match in snippet view article find links to article
them. The rhyme scheme is AABB, and the rhymes are often forced. The line length and metre are irregular. Bentley invented the clerihew in school and
Green Line (Dubai Metro) (558 words) [view diff] exact match in snippet view article
extension from Dubai Healthcare City to Dubai Creek via Al Jaddaf, the line length became 22.5 kilometres (14.0 mi) long. According to Gulfnews (on 13.09
Base64 (3,362 words) [view diff] exact match in snippet view article find links to article
fixed length for Base64-encoded lines, but it does specify a maximum line length of 76 characters. Additionally it specifies that any extra-alphabetic
Red Line (Washington Metro) (2,169 words) [view diff] exact match in snippet view article
Date Event Total number of stations Total line length (mi) Total line length (km) March 29, 1976 Line opens between Farragut North and Rhode Island Avenue
Trams in Dresden (1,273 words) [view diff] exact match in snippet view article find links to article
As of 2008[update], the network comprised 12 tram lines, with a total line length of approximately 210 kilometres (130 mi) and a total route length of
Charles E. Leiserson (544 words) [view diff] exact match in snippet view article find links to article
are algorithms that have no tuning parameters for cache size or cache-line length, but nevertheless use cache near-optimally. He developed the Cilk language
Ci (poetry) (1,325 words) [view diff] no match in snippet view article
base set of certain patterns, in fixed-rhythm, fixed-tone, and variable line-length formal types, or model examples: the rhythmic and tonal pattern of the
Tree crown measurement (4,457 words) [view diff] exact match in snippet view article find links to article
limb where it emerges from the trunk are then measured. The straight line length of the limb from trunk to tip can then be calculated using the Law of
Split (Unix) (191 words) [view diff] exact match in snippet view article
permit a maximum character count (instead of a line count), a maximum line length, how many incrementing characters in generated filenames, and whether
Leaves of Grass (3,967 words) [view diff] exact match in snippet view article find links to article
exception, the poems do not rhyme or follow standard rules for meter and line length. Among the poems in the collection are "Song of Myself", "I Sing the
Be Un Limited (1,776 words) [view diff] exact match in snippet view article find links to article
Mbit/s downstream and 1.9 Mbit/s upstream, subject to Annex M enablement, line length and quality, making BE's network the fastest mainstream, and first ADSL2+
Wenzhou–Fuzhou Railway (459 words) [view diff] exact match in snippet view article find links to article
Operation Owner China Railway Operator(s) China Railway High-speed Technical Line length 298.1 km (185 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Akechidaira Ropeway (110 words) [view diff] exact match in snippet view article find links to article
Passengers per cabin, 2 cabins Trip duration 3 min Technical features Line length 300 m (984 ft) No. of cables 3 Operating speed 2.5 m/s Vertical Interval
Nokogiriyama Ropeway (90 words) [view diff] exact match in snippet view article find links to article
capacity 41 Passengers per cabin Trip duration 3 min Technical features Line length 680 m (2,231 ft) No. of cables 3 Vertical Interval 223 m (732 ft) Maximum
Gothenburg tram network (824 words) [view diff] exact match in snippet view article find links to article
which serve twelve day-time and five night-time lines with a combined line length of 190 km. These figures are expected to increase when the second stage
Port Island Line (322 words) [view diff] exact match in snippet view article find links to article
Locale Kobe Termini Sannomiya Kobe Airport Stations 12 Operation Opened February 5, 1981 Owner Kobe New Transit Technical Line length 10.8 km (6.71 mi)
Dresdner Verkehrsbetriebe (1,774 words) [view diff] exact match in snippet view article find links to article
operates the Dresden tram network comprising 12 tram lines, with a total line length of approximately 210 kilometres (130 mi) and a total route length of
Newline (3,856 words) [view diff] exact match in snippet view article find links to article
considered a feature or a nuisance depending on the application. Fixed line length was used by some early mainframe operating systems. In such a system
Mysore–Chamarajanagar branch line (219 words) [view diff] exact match in snippet view article find links to article
Krishnarajapuram Rolling stock WDM-2 WDM-3A WDP-4D WDP-4 WDG-3A WDG-4 Technical Line length 61 kilometres (38 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in)
Guntur–Tenali section (159 words) [view diff] exact match in snippet view article find links to article
1916 Owner Indian Railway Operator(s) South Central Railway Technical Line length 24.28 km (15.09 mi) Track length 44 km (27 mi) Number of tracks 1 Track
Nanchang–Jiujiang Intercity Railway (86 words) [view diff] exact match in snippet view article find links to article
Opened September 20, 2010 Operator(s) China Railway High-speed Technical Line length 131.27 km (82 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Kabe Line (813 words) [view diff] exact match in snippet view article find links to article
Operator: West Japan Railway Company (Class-1 railroad) Official line length: 14 km Gauge: 1,067 mm (3 ft 6 in) Double track: none (entirely single
Data visualization (3,521 words) [view diff] exact match in snippet view article find links to article
process differences in line length than surface area, it may be more effective to use a bar chart (which takes advantage of line length to show comparison)
Nanjing–Anqing Intercity Railway (514 words) [view diff] exact match in snippet view article find links to article
Termini Nanjing South Anqing Operation Opened 6 December 2015 Technical Line length 258 kilometres (160 mi) (main line) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Opisometer (269 words) [view diff] exact match in snippet view article find links to article
handle while this is done, the length of the line can be ascertained: line length = wheel circumference × teeth counted/teeth on wheel. In more sophisticated
Shenyang–Dandong Intercity Railway (965 words) [view diff] exact match in snippet view article find links to article
7349 meters long. Bridges and tunnels together account for 80.5% of the line length. In early 2008 – The Liaoning provincial government put forward to
Keisei Higashi-Narita Line (109 words) [view diff] exact match in snippet view article find links to article
Higashi-Narita Stations 2 Operation Owner Keisei Electric Railway Technical Line length 7.1 km (4.4 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius 360
MIRC scripting language (1,359 words) [view diff] exact match in snippet view article find links to article
of plain text. This limit is imposed by mIRC's scripting parser's own line length limitation (unless assigning a binary variable) Globally accessible via
MIRC scripting language (1,359 words) [view diff] exact match in snippet view article find links to article
of plain text. This limit is imposed by mIRC's scripting parser's own line length limitation (unless assigning a binary variable) Globally accessible via
Chengdu–Chongqing Intercity Railway (275 words) [view diff] exact match in snippet view article find links to article
Operator(s) China Railway High-speed Rolling stock CRH380D Technical Line length 307 km (191 mi) 307 km (191 mi) (main line) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Keisei Kanamachi Line (157 words) [view diff] exact match in snippet view article find links to article
Operation Opened 21 October 1913 Owner Keisei Electric Railway Technical Line length 2.5 km (1.6 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius 160
Debashish Mohanty (322 words) [view diff] no match in snippet view article find links to article
fast bowler India has produced ever.He gained fame for his accurate line, length and ability to swing the ball both the ways. Cricket Archive – profile
HMS Devonshire (1745) (92 words) [view diff] case mismatch in snippet view article
characteristics Class and type: 1741 proposals 66-gun third rate ship of the line Length: 161 ft (49.1 m) (gundeck) Beam: 46 ft (14.0 m) Depth of hold: 19 ft
Tianjin–Qinhuangdao High-Speed Railway (58 words) [view diff] exact match in snippet view article find links to article
Opened 1st Dec, 2013 Operator(s) China Railway High-speed Technical Line length 261.2 km (162 mi) (main line) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Circle MRT Line (Klang Valley) (276 words) [view diff] exact match in snippet view article
Corporation Sdn Bhd Conduction system Automated and driverless Technical Line length 0 km (0 mi)Elevated: 0 km (0 mi) Underground: 0 km (0 mi) Track gauge
Jurong Region MRT Line (516 words) [view diff] exact match in snippet view article find links to article
2030 (West Coast Extension) Owner Land Transport Authority Operator(s) TBA Technical Line length 20 km (12 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Grand Paris Express (1,577 words) [view diff] exact match in snippet view article find links to article
Stations 36 Operation Opened 2020-2030 Operator(s) RATP Conduction system Automated Technical Line length 75 km (47 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Han poetry (2,984 words) [view diff] exact match in snippet view article find links to article
shi poetry, as the later development of the yuehfu into regular, fixed-line length forms makes it difficult to distinguish in form from the shi form of
Krishna Canal–Guntur section (107 words) [view diff] exact match in snippet view article find links to article
ago (1966) Owner Indian Railway Operator(s) South Central Railway Technical Line length 25.36 km (15.76 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in)
Keiō Dōbutsuen Line (93 words) [view diff] exact match in snippet view article find links to article
Tama-Dōbutsukōen Stations 2 Operation Opened 1964 Owner Keio Corporation Technical Line length 2.0 km (1.2 mi) Number of tracks 1 Track gauge 1,372 mm (4 ft 6 in) Electrification
HMS Chester (1743) (81 words) [view diff] case mismatch in snippet view article
characteristics Class and type: 1741 proposals 50-gun fourth rate ship of the line Length: 140 ft (42.7 m) (gundeck) Beam: 40 ft (12.2 m) Depth of hold: 17 ft
Keisei Chihara Line (317 words) [view diff] exact match in snippet view article find links to article
Chiharadai Stations 6 Operation Opened April 1, 1992 Owner Keisei Electric Railway Technical Line length 10.9 km (6.8 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Hefei–Fuzhou High-Speed Railway (615 words) [view diff] exact match in snippet view article find links to article
Owner China Railways Operator(s) China Railway High-speed Technical Line length 813 km (505 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Xiamen–Shenzhen Railway (618 words) [view diff] exact match in snippet view article find links to article
Operation Owner China Railway Operator(s) China Railway High-speed Technical Line length 502.4 km (312 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Yamaman Yūkarigaoka Line (141 words) [view diff] exact match in snippet view article find links to article
Yūkarigaoka Line Yūkarigaoka Line carriages at Yūkarigaoka Station Line length: 4.1 km (2.5 mi) Voltage: 750 DC Legend
Itō Line (447 words) [view diff] exact match in snippet view article find links to article
Type Passenger Termini Atami Itō Stations 6 Operation Opened 1935 Operator(s) JR East Technical Line length 16.9 km Track gauge 1,067 mm (3 ft 6 in)
Ryūgasaki Line (158 words) [view diff] exact match in snippet view article find links to article
Ryūgasaki Stations 3 Operation Opened 1900 Owner Kantō Railway Technical Line length 4.5 km (2.8 mi) Track gauge 1,067 mm (3 ft 6 in) Old gauge 762 mm (2 ft 6 in)
Sydbanen (41 words) [view diff] exact match in snippet view article find links to article
Gedser, Rødbyhavn Stations 9 Operation Owner Banedanmark Operator(s) DSB Technical Line length 142.3 km (88.4 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Levitha (131 words) [view diff] exact match in snippet view article find links to article
a family with one child. The total area of the island is 9.2 square kilometres (4 sq mi) and its total coast line length is 34 kilometres (21 miles).
LGV Atlantique (411 words) [view diff] exact match in snippet view article find links to article
Mans Operation Opened 1989-1990 Owner RFF Operator(s) SNCF Technical Line length 232 km (144 mi) + 52 km (32 mi) (western branch) Number of tracks Double
Fuzhou–Xiamen Railway (878 words) [view diff] exact match in snippet view article find links to article
Operation Owner China Railway Operator(s) China Railway High-speed Technical Line length 274.9 km (171 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Seibu Toshima Line (149 words) [view diff] exact match in snippet view article find links to article
Stations 2 Operation Opened 15 October 1927 Owner Seibu Railway Technical Line length 1.0 km (0.6 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Electrification
Keiō Keibajō Line (114 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1955 Owner Keio Corporation Depot(s) None Technical Line length 0.9 km Track gauge 1,372 mm (4 ft 6 in) Minimum radius 200 m Electrification
Margin (typography) (1,501 words) [view diff] case mismatch in snippet view article
Retrieved 2 November 2014.  Franz, Laura. "Size Matters: Balancing Line Length And Font Size In Responsive Web Design". Smashing Magazine. Retrieved
Mysore–Bangalore line (480 words) [view diff] exact match in snippet view article find links to article
Rolling stock WDM-2 WDM-3A WDP-4D WDP-4 WDG-3A WDG-4 WDM3D Technical Line length 138.25 kilometres (85.90 mi) Number of tracks 1 Track gauge 1,676 mm
Keisei Chiba Line (128 words) [view diff] no match in snippet view article find links to article
Station. At Chiba Chūō Station, the line is connected to the Chihara Line. Length: 12.9 km Gauge: 1,435 mm Electrification: 1,500 V DC The entire line
Yoshino Line (166 words) [view diff] exact match in snippet view article find links to article
Depot(s) Muda (branch depot of Furuichi Inspection Depot) Technical Line length 25.2 km (15.7 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in)
Over (cricket) (1,106 words) [view diff] no match in snippet view article
batsman out. For example, he may bowl the first few balls with the same line, length, or spin. He intends to tempt the batsman into scoring runs by providing
Zhengzhou–Jiaozuo Intercity Railway (201 words) [view diff] exact match in snippet view article find links to article
Opened June 26, 2015 Operator(s) China Railway High-speed Technical Line length 77.786 km (48 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Ikaho Ropeway (389 words) [view diff] exact match in snippet view article find links to article
Japan Operator City of Shibukawa Technical features Aerial lift type Aerial tramway Line length 0.499 km (0.310 mi) Notes 182 m (597 ft) Electric motor
Comm (583 words) [view diff] exact match in snippet view article find links to article
read lines with the function readlinebuffer() which does not impose any line length limits if system memory suffices. Other implementations read lines with
LGV Rhône-Alpes (398 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1992-1994 Owner SNCF Réseau Operator(s) SNCF Technical Line length 115 km (71 mi) Number of tracks Double track Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Bourne and Sleaford Railway (157 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1872 Closed 1930 (passengers) 1964 (goods) Operator(s) Great Northern Railway Technical Line length 18 mi (29 km) Number of tracks 1
Toyohashi Railroad Atsumi Line (534 words) [view diff] exact match in snippet view article find links to article
Park. The line is entirely within the cities of Toyohashi and Tahara. Line length: 18.0 km (11.2 mi) Number of stations: 16 Track: single Rail gauge: 1
Metre gauge railway (147 words) [view diff] exact match in snippet view article find links to article
Tramway Pakistan Mirpur Khas–Nawabshah Railway was opened in 1912 with line length of 325 KM. The line was closed in 2005. One section of Hyderabad–Khokhrapar
Changsha Metro (357 words) [view diff] exact match in snippet view article find links to article
construction began in 2010 and was open on Jun 28, 2016. Line 1 has a line length of 23.62 kilometres (14.68 mi) with 20 stations, of which 1 is elevated
Keikyū Kurihama Line (366 words) [view diff] exact match in snippet view article find links to article
Termini Horinouchi Misakiguchi Stations 9 Operation Owner Keikyu Technical Line length 13.4 km (8.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Kansai Airport Line (149 words) [view diff] exact match in snippet view article find links to article
223-2500 series EMU 225-5000 series EMU 281 series EMU Technical Line length 11.1 km (6.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Fu (poetry) (5,033 words) [view diff] exact match in snippet view article
their compositions. Fu poems employ alternating rhyme and prose, varying line length, close alliteration, onomatopoeia, loose parallelism, and extensive cataloging
Yellow Line (Baltimore) (478 words) [view diff] exact match in snippet view article
Columbia Town Center (South) Hunt Valley, Maryland (North) Operation Operator(s) Maryland Transit Administration Technical Line length 42 mi (67.6 km)
Karasuyama Line (467 words) [view diff] exact match in snippet view article find links to article
April 1923 Owner JR East Rolling stock EV-E301 series BEMU Technical Line length 20.4 km (12.7 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in)
Keikyū Zushi Line (294 words) [view diff] exact match in snippet view article find links to article
Stations 4 Operation Opened April 1930 Owner Keikyu Depot(s) None Technical Line length 5.9 km (3.7 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tōgane Line (312 words) [view diff] exact match in snippet view article find links to article
Narutō Stations 5 Operation Opened 1900 Operator(s) JR East Technical Line length 13.8 km (8.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Southern Maryland Rapid Transit (242 words) [view diff] exact match in snippet view article find links to article
Plains (South) Branch Avenue (North) Stations 12 Services 1 Operation Operator(s) Maryland Transit Administration Technical Line length 18.7 mi (30.1 km)
Llobregat–Anoia Line (1,695 words) [view diff] exact match in snippet view article find links to article
formed. It also includes several freight branches, accounting for a total line length of 138 kilometres (86 mi) and 41 passenger stations. Barcelona Metro
Yilan Line (86 words) [view diff] exact match in snippet view article find links to article
Administration Operator(s) Taiwan Railways Administration Technical Line length 93.6 km (58.2 mi) Number of tracks 2 Track gauge 3 ft 6 in (1,067 mm)
Keio Sagamihara Line (212 words) [view diff] exact match in snippet view article find links to article
Hashimoto Stations 12 Operation Opened 1916 Owner Keio Corporation Technical Line length 22.6 km (14.0 mi) Track gauge 1,372 mm (4 ft 6 in) Electrification 1
Maizuru Line (250 words) [view diff] exact match in snippet view article find links to article
Higashi-Maizuru Stations 6 Operation Opened 1904 Owner JR West Technical Line length 26.4 km (16.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Dandong–Dalian Intercity Railway (399 words) [view diff] exact match in snippet view article find links to article
Opened 17 December 2015 Operator(s) China Railway High-speed Technical Line length 292 km (181 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Baoji–Lanzhou High-Speed Railway (261 words) [view diff] exact match in snippet view article find links to article
Opened 2017 (projected) Operator(s) China Railway High-speed Technical Line length 401 km (249 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Keiō New Line (364 words) [view diff] exact match in snippet view article find links to article
Sasazuka Stations 4 Operation Opened 1978 Owner Keio Corporation Technical Line length 3.6 kilometres (2.2 mi) Track gauge 1,372 mm (4 ft 6 in) Electrification
Nanjing–Tianchang Intercity Railway (111 words) [view diff] exact match in snippet view article find links to article
Operator(s) Nanjing Metro Character Underground and elevated Technical Line length 45.21 km (28.1 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Île-de-France tramway Line 2 (187 words) [view diff] exact match in snippet view article find links to article
Opened 1997 (1997) (last extension in 2012) Rolling stock Alstom Citadis Technical Line length 17.9 km (11.1 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
U1 (Hamburg U-Bahn) (372 words) [view diff] exact match in snippet view article
transit System Hamburg U-Bahn Stations 46 Operation Opened 1 December 1914 Technical Line length 55.383 km (34.413 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
U3 (Hamburg U-Bahn) (275 words) [view diff] exact match in snippet view article
Rapid transit System Hamburg U-Bahn Stations 25 Operation Opened 1912 Technical Line length 20.68 km (12.85 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Shijiazhuang–Taiyuan High-Speed Railway (338 words) [view diff] exact match in snippet view article find links to article
2009 Owner China Railway Operator(s) China Railway High-speed Technical Line length 189 km (117 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Xi'an–Baoji High-Speed Railway (89 words) [view diff] exact match in snippet view article find links to article
Opened December 2013 Operator(s) China Railway High-speed Technical Line length 138 km (86 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius 7
Kanazawa Seaside Line (119 words) [view diff] exact match in snippet view article find links to article
Termini Shin-Sugita Kanazawa-Hakkei Stations 14 Operation Opened July 5, 1989 Owner Yokohama Seaside Line Co., Ltd. Technical Line length 10.6 km (6.6 mi)
4 ft 6 in gauge railway (1,227 words) [view diff] no match in snippet view article find links to article
instead. The Toden Arakawa Line. Length: 12.2 km (7.6 mi). Only surviving line of Tokyo municipal tram. The Tōkyū Setagaya Line. Length: 5.0 km (3.1 mi). Another
HMS Eagle (1745) (460 words) [view diff] case mismatch in snippet view article
1767 General characteristics Class and type: Fourth rate ship of the line Length: 147 ft (44.8 m) (gundeck) Beam: 42 ft (12.8 m) Depth of hold: 18 ft
Minatomirai Line (410 words) [view diff] exact match in snippet view article find links to article
Railway Company, Tokyu Corporation Rolling stock Y500 series Technical Line length 4.1 km (2.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Seibu Yūrakuchō Line (333 words) [view diff] exact match in snippet view article find links to article
Kotake-Mukaihara Stations 3 Operation Owner Seibu Railway Technical Line length 2.6 km (1.6 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in) Electrification
Kaeng Khoi Line (111 words) [view diff] exact match in snippet view article find links to article
Lamphong Sara Buri Stations 37 Operation Owner State Railway of Thailand Technical Line length 125.10 km (77.73 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in)
U2 (Hamburg U-Bahn) (291 words) [view diff] exact match in snippet view article
transit System Hamburg U-Bahn Stations 25 Operation Opened 21 October 1913 Technical Line length 24.543 km (15.250 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Keifuku Electric Railroad (659 words) [view diff] exact match in snippet view article find links to article
(叡山ロープウェイ?, Eizan Rōpuwei) (Ja) is an aerial tramway in Sakyo-ku, Kyoto. The line length is 0.5 km. The cable and ropeway lines are for visitors to Mount Hiei
Chengdu–Mianyang–Leshan Intercity Railway (335 words) [view diff] exact match in snippet view article find links to article
Stations 21 Operation Operator(s) China Railway High-speed Technical Line length 314 km (195 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Threnodia Augustalis (464 words) [view diff] exact match in snippet view article find links to article
of the Greek lyric poet Pindar. The stanzas are irregular, and both line length and the rhyming pattern vary. Early editions misunderstood the pindaric
Guangzhou–Zhuhai Intercity Railway (1,417 words) [view diff] exact match in snippet view article find links to article
Opened 7 January 2011 Operator(s) China Railway High-speed Technical Line length 187 km (116.196 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Tōkyū Setagaya Line (277 words) [view diff] exact match in snippet view article find links to article
Corporation Character Double track Rolling stock Tokyu 300 series Technical Line length 5 km (3.1 mi) Track gauge 1,372 mm (4 ft 6 in) Electrification 600 V
Line 3, Nanjing Metro (95 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1 April 2015 Character Elevated/underground Technical Line length 44.1 km (27.4 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Iiyama Line (117 words) [view diff] exact match in snippet view article find links to article
Echigo-Kawaguchi Stations 31 Operation Opened 1921 Owner JR East Technical Line length 96.7 km (60.1 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Lhasa–Xigazê Railway (324 words) [view diff] exact match in snippet view article find links to article
Railway Station Operation Opened 16 August 2014 (2014-08-16) Technical Line length 253 km (157 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
KLIA Transit (837 words) [view diff] exact match in snippet view article find links to article
Rolling stock Siemens Desiro ET 425 M Electric Multiple Unit Technical Line length 57 km (35 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Ventura County Line (881 words) [view diff] exact match in snippet view article find links to article
Operator(s) Metrolink Character Elevated and surface-level Technical Line length 70.9 miles (114.1 km) (average length between stations: 6.445 miles)
Tōbu Utsunomiya Line (232 words) [view diff] exact match in snippet view article find links to article
Railway Rolling stock Tobu 350 series, Tobu 8000 series EMUs Technical Line length 24.3 km (15.1 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Beijing–Shanghai Railway (524 words) [view diff] exact match in snippet view article find links to article
(first section) 1968 (whole line) Operator(s) China Railways Technical Line length 1,462 km (908 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Cross Island MRT Line (1,030 words) [view diff] exact match in snippet view article find links to article
(expected) Operation Opened 2030 Owner Land Transport Authority Operator(s) TBA Technical Line length 50 km (31 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Line 10, Nanjing Metro (145 words) [view diff] exact match in snippet view article find links to article
Operator(s) Nanjing Metro Character Underground Elevated (Xiaohang) Technical Line length 21.6 km (13.4 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Soft tennis (270 words) [view diff] case mismatch in snippet view article find links to article
Line Name Line Length Base Line for Singles 8.23 m Base Line for Doubles 10.97 m Side Line for Singles 23.77 m Side Line for Doubles 23.77 m Service Line
Akita Shinkansen (413 words) [view diff] exact match in snippet view article find links to article
Opened 22 March 1997 Owner JR East Rolling stock E6 series Technical Line length 127.3 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 20 kV AC
Hanshin Mukogawa Line (67 words) [view diff] exact match in snippet view article find links to article
Stations 4 Operation Opened 21 November 1943 (1943-11-21) Technical Line length 1.7 km (1.1 mi) Number of tracks 1 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Camden Line (158 words) [view diff] exact match in snippet view article find links to article
(tracks) Operator(s) Bombardier Transportation/Maryland Transit Administration Technical Line length 39 mi (63 km) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Sierpiński arrowhead curve (326 words) [view diff] no match in snippet view article find links to article
order, double length, int angle) { if ( 0 == order ) { draw_line( length); } else { curve( order - 1, length / 2, - angle);
Keçiören Gondola (350 words) [view diff] exact match in snippet view article find links to article
municipality dropped the fare from initially 5.00 to 1.00 in April 2013. Line length: 1,653 m (5,423 ft) Height distance: 65.5 m (215 ft) Number of stations:
Fernleigh Track (548 words) [view diff] no match in snippet view article find links to article
(16 ft) (nr Belmont Station) Maximum elevation, 88 m (289 ft) (on main line) Length of Line, 15.51 km (10 mi) 1880 - Rail line opened to Redhead December
Keihan Nakanoshima Line (248 words) [view diff] exact match in snippet view article find links to article
Company Operator(s) Keihan Electric Railway Depot(s) none Technical Line length 3.0 km (1.9 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Line 4, Nanjing Metro (100 words) [view diff] exact match in snippet view article find links to article
Operation Opened January 18, 2017 Operator(s) Nanjing Metro Technical Line length 33.5 km (20.8 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Manila Light Rail Transit System Line 6 (284 words) [view diff] exact match in snippet view article find links to article
Opened TBA Owner Light Rail Transit Authority Operator(s) TBA Technical Line length 19 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Monongahela Incline (503 words) [view diff] exact match in snippet view article find links to article
 1870 (1870-05-28) Owner Port Authority of Allegheny County Technical Line length 635 feet (194 m) Track gauge 5 ft (1,524 mm) Electrification 1935 Operating
Pune–Miraj–Londa line (347 words) [view diff] exact match in snippet view article find links to article
Railway Operator(s) Central Railway, South Western Railway Technical Line length 468 km (291 mi) Number of tracks 2/1 Track gauge 1,676 mm (5 ft 6 in)
Sagami Railway Izumino Line (129 words) [view diff] exact match in snippet view article find links to article
56,843 (2010) Operation Opened 1976-99 Owner Sagami Railway Technical Line length 11.3 km (7.0 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Tobu Kameido Line (444 words) [view diff] exact match in snippet view article find links to article
April 1904 Owner Tobu Railway Rolling stock Tobu 8000 series Technical Line length 3.4 km (2.1 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 160 m
Ode (637 words) [view diff] exact match in snippet view article find links to article
English are by Abraham Cowley. These were iambic, but had irregular line length patterns and rhyme schemes. Cowley based the principle of his Pindariques
Jinshan Railway (233 words) [view diff] exact match in snippet view article find links to article
Stations 8 Operation Opened 1975 Operator(s) China Railways Technical Line length 56.4 km (35.05 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Haizhu Tram (170 words) [view diff] exact match in snippet view article find links to article
Guangzhou Metro Character At-grade Depot(s) Modiesha Stabling Yard Technical Line length 7.7 km (4.78 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Mokama–Barauni section (200 words) [view diff] exact match in snippet view article find links to article
Stations 9 Operation Owner Indian Railway Operator(s) East Central Railway Technical Line length 21 km (13 mi) Track gauge 1,676 mm (5 ft 6 in) broad gauge
Web page (2,630 words) [view diff] case mismatch in snippet view article find links to article
Norman Group. Retrieved 2016-11-16.  Lynch, Patrick. "Page Width and Line Length". Yale University Press. Retrieved 2016-11-14.  Broider, Rick (2013)
Kishin Line (216 words) [view diff] exact match in snippet view article find links to article
Rolling stock KiHa 40 series, KiHa 120, KiHa 122/127 series Technical Line length 158.1 km (98.2 mi) Track gauge 1,067 mm (3 ft 6 in) Operating speed 100 km/h
Mokama–Barauni section (200 words) [view diff] exact match in snippet view article find links to article
Stations 9 Operation Owner Indian Railway Operator(s) East Central Railway Technical Line length 21 km (13 mi) Track gauge 1,676 mm (5 ft 6 in) broad gauge
S7 (Rhine-Main S-Bahn) (55 words) [view diff] exact match in snippet view article
Regio Depot(s) Frankfurt Hbf Rolling stock DBAG Class 430 Technical Line length 35.2 km (21.9 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Elgeseter Line (194 words) [view diff] exact match in snippet view article find links to article
Trondheim Operator(s) Trondheim Sporvei Trondheim Trafikkselskap Technical Line length 2.5 km Track length 5.0 km Number of tracks Double Track gauge 1,000 mm
Seibu Kokubunji Line (354 words) [view diff] exact match in snippet view article find links to article
Seibu 101 series, Seibu 2000 series, and Seibu 3000 series Technical Line length 7.8 km (4.8 mi) Number of tracks 1 (1.2 km double-tracked) Track gauge
Line 4, Shanghai Metro (280 words) [view diff] exact match in snippet view article find links to article
Metro Operation Co. Ltd. Character Underground and elevated Technical Line length 33.7 km (20.94 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Bairabi–Sairang Railway (331 words) [view diff] exact match in snippet view article find links to article
Website Indian Railway Website Operation Owner Indian Railways Technical Line length 84.25 km (52.35 mi) Number of tracks Single Diesel-Line Track gauge 5 ft 6 in
Seibu Seibu-en Line (146 words) [view diff] exact match in snippet view article find links to article
Stations 2 Operation Opened 5 April 1930 Owner Seibu Railway Technical Line length 2.4 km (1.5 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Minimum
Bakhtiyarpur–Tilaiya line (360 words) [view diff] exact match in snippet view article find links to article
Opened 1962 / 2010 Owner Indian Railway Operator(s) East Central Railway Technical Line length 100 km (62 mi) Track gauge Broad Gauge 1,676 mm (5 ft 6 in)
Longhai Railway (585 words) [view diff] exact match in snippet view article find links to article
Longhai Railway Line length: 1,759 km (1,093 mi) Track gauge: 1,435 mm (4 ft 8 1⁄2 in) Stations and structures Legend
Hengyang–Liuzhou Intercity Railway (148 words) [view diff] exact match in snippet view article find links to article
Opened 28 December 2013 Operator(s) China Railway High-speed Technical Line length 497.9 km (309 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Guiyang–Kaiyang Intercity Railway (175 words) [view diff] exact match in snippet view article find links to article
Operation Opened May 1, 2015 Operator(s) China Railway High-speed Technical Line length 62 km (39 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 250 km/h
Seibu Sayama Line (188 words) [view diff] exact match in snippet view article find links to article
Seibu-Kyūjō-mae Stations 3 Operation Opened 1929 Owner Seibu Railway Technical Line length 4.2 km (2.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Line 8, Shanghai Metro (517 words) [view diff] exact match in snippet view article find links to article
Metro Operation Co. Ltd. Character Underground and elevated Technical Line length 37.4 km (23.24 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tama Toshi Monorail Line (155 words) [view diff] exact match in snippet view article find links to article
Monorail Co., Ltd. Rolling stock Tama Toshi Monorail 1000 series Technical Line length 16.0 km (9.94 mi) Electrification 1,500 V DC Operating speed 65 km/h
Mount Tsukuba Ropeway (117 words) [view diff] exact match in snippet view article find links to article
capacity 70 Passengers per cabin, 2 cabins Trip duration 6 min Technical features Line length 1.3 kilometres (0.8 mi) Vertical Interval 298 m (978 ft)
Paris Métro Line 7bis (201 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1967 Rolling stock MF 88 3 carriages per trainset Technical Line length 3.1 km (1.9 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Masada cableway (147 words) [view diff] exact match in snippet view article find links to article
Israel Nature and Parks Authority Technical features Aerial lift type Aerial tramway Line length 0.9 km Operating speed 28.8 km/h Notes elevation 33 m
Kintetsu Namba Line (199 words) [view diff] exact match in snippet view article find links to article
Opened March 15, 1970 (1970-03-15) Operator(s) Kintetsu Railway Technical Line length 2.0 km (1.2 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Chengdu–Dujiangyan Intercity Railway (621 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Opened 12 May 2010 Operator(s) China Railway High-speed Technical Line length 94.2 km (59 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Eastern Line (Thailand) (523 words) [view diff] exact match in snippet view article
Operation Opened 24 January 1907 Owner State Railway of Thailand Depot(s) Makkasan depot Technical Line length 255 km (158 mi) Track gauge 1,000 mm
Gudivada–Machilipatnam branch line (119 words) [view diff] exact match in snippet view article find links to article
Operation Owner Indian Railway Operator(s) South Central Railway Technical Line length 36.70 km (22.80 mi) Track gauge 1,676 mm (5 ft 6 in) Broad gauge
Line 9, Shanghai Metro (369 words) [view diff] exact match in snippet view article find links to article
1 Metro Operation Co. Ltd. Character Underground, Elevated Technical Line length 51.7 km (32.12 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Trafford Park Line (367 words) [view diff] exact match in snippet view article find links to article
Character Reserved track & street running Rolling stock M5000 Technical Line length 5.5 km (3.4 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Underarm bowling (2,067 words) [view diff] no match in snippet view article find links to article
flight of the ball and experimented for long hours with variations of line, length and speed of delivery until he had mastered the art of pitching. Other
Sagano Line (283 words) [view diff] exact match in snippet view article find links to article
Termini Kyoto Sonobe Operation Opened 1988 (1897) Owner JR West Technical Line length 34.2 km (21.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Line 1, Guangzhou Metro (151 words) [view diff] exact match in snippet view article find links to article
Guangzhou Metro Corporation Character Underground and At-grade Technical Line length 18.5 km (11.50 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Sørlandet Line (455 words) [view diff] exact match in snippet view article find links to article
Long-haul passenger/freight Rolling stock Class 73, El 18 Technical Line length 528 Number of tracks Single or Double Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 5, Guangzhou Metro (98 words) [view diff] exact match in snippet view article find links to article
Guangzhou Metro Corporation Character Underground and Elevated Technical Line length 31.9 km (19.82 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
HMS Princess Louisa (1744) (92 words) [view diff] case mismatch in snippet view article
characteristics Class and type: 1741 proposals 58-gun fourth rate ship of the line Length: 147 ft (44.8 m) (gundeck) Beam: 42 ft (12.8 m) Depth of hold: 18 ft
Pagidipalli–Nallapadu section (162 words) [view diff] exact match in snippet view article find links to article
1930 Owner Indian Railway Operator(s) South Central Railway Technical Line length 238.49 km (148 mi) Track length 130 km (81 mi) Number of tracks 1 Track
Line 10, Shanghai Metro (281 words) [view diff] exact match in snippet view article find links to article
peak) Operation Opened April 10, 2010 Character Underground Technical Line length 36 km (22.37 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Andal–Sainthia branch line (242 words) [view diff] exact match in snippet view article find links to article
Opened 1913 Owner Indian Railway Operator(s) Eastern Railway Technical Line length 73 km (45 mi) Track gauge 1,676 mm (5 ft 6 in) Broad Gauge Operating
Patna–Gaya line (246 words) [view diff] exact match in snippet view article find links to article
1900 Owner Indian Railway Operator(s) East Central Railway Technical Line length 92 km (57 mi) Track gauge Broad Gauge 1,676 mm (5 ft 6 in) Electrification
Line 12, Shanghai Metro (254 words) [view diff] exact match in snippet view article find links to article
Shanghai No.4 Metro Operation Co. Ltd. Character Underground Technical Line length 40.4 km (25.10 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Wells Harbour Railway (474 words) [view diff] exact match in snippet view article find links to article
Stations called at 2 Stations operated 2 Route km operated 1.1 Website Official website Technical Line length 1,200 yards (1,100 m) Gauge 10 1⁄4 in (260 mm)
Changchun–Jilin Intercity Railway (264 words) [view diff] exact match in snippet view article find links to article
Opened January 11, 2011 Operator(s) China Railway High-speed Technical Line length 111 km (69 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 250 km/h
Chongqing−Lichuan Railway (541 words) [view diff] exact match in snippet view article find links to article
Stations 9 Operation Operator(s) China Railway High-speed Technical Line length 259.5 km (161 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Meitetsu Kōwa Line (85 words) [view diff] exact match in snippet view article find links to article
Termini Ōtagawa Kōwa Stations 19 Operation Owner Meitetsu Technical Line length 28.8 km (17.9 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 280
MIA Mover (518 words) [view diff] exact match in snippet view article find links to article
the airport Rolling stock Mitsubishi Crystal Mover vehicles Technical Line length 1.27 miles (2.04 km) Operating speed 43 miles per hour (69 km/h) (top)
Warburton railway line (225 words) [view diff] exact match in snippet view article find links to article
and Healesville lines Stations 12 Operation Opened 1901 Closed 1965 Technical Line length 37 km (23 mi) (From Lilydale) Number of tracks Single track
Line 7, Shanghai Metro (269 words) [view diff] exact match in snippet view article find links to article
Character Underground Elevated(Luonan Xincun and Meilan Lake) Technical Line length 44.2 km (27.5 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Kashihara Line (175 words) [view diff] exact match in snippet view article find links to article
ago (1921-04-01) Owner Kintetsu Railway Character Commuter rail Technical Line length 23.8 km (14.8 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius
Meitetsu Chita New Line (116 words) [view diff] exact match in snippet view article find links to article
Operation Opened June 5, 1980 (1980-06-05) Owner Meitetsu Technical Line length 13.9 km (8.64 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Guntakal–Vasco da Gama section (75 words) [view diff] exact match in snippet view article find links to article
Central Railway zone South Western Railway zone Konkan Railway Technical Line length 457 km (284 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in) Old
Green Line (Baltimore) (566 words) [view diff] exact match in snippet view article
Hopkins Hospital Morgan State University Stations 13 Services 1 Operation Operator(s) Maryland Transit Administration Technical Line length 4 mi (6.4 km)
Barton line (897 words) [view diff] exact match in snippet view article find links to article
stock Class 142 "Pacer" Class 153 "Super Sprinter" Class 185 Technical Line length 22 miles 72 chains (36.85 km) Number of tracks 1 (Barton-on-Humber–New
Dongguan Rail Transit (782 words) [view diff] exact match in snippet view article find links to article
plan, in 2010 the planning was further adjusted to increase planned line length to 218 kilometres and 76 stations. Network construction period was extended
Meitetsu Chikkō Line (122 words) [view diff] exact match in snippet view article find links to article
Operation Opened January 15, 1924 (1924-01-15) Owner Meitetsu Technical Line length 1.5 km (0.9 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 160 m
Lanzhou–Zhongchuan Airport Intercity Railway (339 words) [view diff] exact match in snippet view article find links to article
Opened September 30, 2015 Operator(s) China Railway High-speed Technical Line length 61 km (38 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius 3,500 m
Jilin–Hunchun Intercity Railway (490 words) [view diff] exact match in snippet view article find links to article
Opened September 30, 2015 Operator(s) China Railway High-speed Technical Line length 359 km (223 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius 4
Line 13, Shanghai Metro (191 words) [view diff] exact match in snippet view article find links to article
Shanghai No. 2 Metro Operation Co., Ltd. Character Underground Technical Line length 22.2 km (13.79 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Twin Peaks Tunnel (369 words) [view diff] exact match in snippet view article find links to article
Underground subway tunnel for light rail/streetcar system Technical Line length 2.27 mi (3.65 km) No. of tracks 2 Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Meitetsu Seto Line (206 words) [view diff] exact match in snippet view article find links to article
Meitetsu Rolling stock Meitetsu 4000 series Meitetsu 6000 series Technical Line length 20.6 km (12.8 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Ryōmō Line (401 words) [view diff] exact match in snippet view article find links to article
Shin-Maebashi Stations 18 Operation Opened 1889 Operator(s) JR East Technical Line length 84.4 km (52.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
SEPTA Main Line (538 words) [view diff] exact match in snippet view article find links to article
Website septa.org Operation Operator(s) SEPTA Regional Rail Technical Line length 26.25 miles (42.25 km) Number of tracks 2–4 Track gauge 4 ft 8 1⁄2 in
Île-de-France tramway Line 7 (86 words) [view diff] exact match in snippet view article find links to article
Athis-Mons Stations 18 Operation Opened 2013 Rolling stock Alstom Citadis 302 Technical Line length 11.2 km (7.0 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 3, Tianjin Metro (86 words) [view diff] exact match in snippet view article find links to article
Metro Corporation Character Underground, At-grade, & Elevated Technical Line length 30.755 km (19.11 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Kongsvinger Line (355 words) [view diff] exact match in snippet view article find links to article
Character Commuter trains Freight Rolling stock BM 69 Rc Regina Technical Line length 115 km Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Bangalore–Arsikere–Hubli line (39 words) [view diff] exact match in snippet view article find links to article
Owner Indian Railway Operator(s) South Western Railway zone Technical Line length 469 km (291 mi) Number of tracks 1/2 Track gauge 1,676 mm (5 ft 6 in)
Pamban–Dhanushkodi line (129 words) [view diff] exact match in snippet view article find links to article
RMM–DNSKD) Owner Indian Railways Operator(s) Southern Railway zone Technical Line length 30 km (19 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in), 1
Sahibganj Loop (942 words) [view diff] exact match in snippet view article find links to article
Opened 1866 Owner Indian Railway Operator(s) Eastern Railway Technical Line length 410 km (255 mi) Number of tracks 1/ 2 Track gauge 1,676 mm (5 ft 6 in)
Beijing Underground Cross City Railway (528 words) [view diff] exact match in snippet view article find links to article
Opened March 20, 2015 Operator(s) China Railway High-speed Technical Line length 9.156 km (6 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius 4500m
Tel Aviv Metro (269 words) [view diff] case mismatch in snippet view article find links to article
Line Length Route 1–2 Ra'anana – Herzliya – Ramat HaSharon – Northern Tel Aviv – Tel Aviv University – Bavli – Ayalon Highway (Tel Aviv) – Holon Industrial
Skreia Line (128 words) [view diff] exact match in snippet view article find links to article
Operator(s) Norwegian State Railways Character Passenger and freight Technical Line length 21.97 km Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 6, Shanghai Metro (454 words) [view diff] exact match in snippet view article find links to article
Metro Operation Co. Ltd. Character Underground and elevated Technical Line length 32.318 km (20.08 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Traction power network (1,769 words) [view diff] exact match in snippet view article find links to article
usually laid parallel to the railway line, in order to allow a shorter line length and to avoid unnecessary influences to the electrical system near the
Røykenvik Line (115 words) [view diff] exact match in snippet view article find links to article
Operator(s) Norwegian State Railways Character Passenger and freight Technical Line length 7 km Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in)
COMMAND.COM (1,284 words) [view diff] exact match in snippet view article find links to article
command1 is executed until termination, then command2. The command line length in interactive mode is limited to 126 characters. “Loading COMMAND.COM”
511 Bathurst (276 words) [view diff] exact match in snippet view article find links to article
Leslie Barns, Russell Rolling stock CLRV, ALRV, Flexity Outlook Technical Line length 6.47 km (4.02 mi) Track gauge 4 ft 10 7⁄8 in (1,495 mm) - TTC Gauge Electrification
Second Beijing–Tianjin Intercity Railway (242 words) [view diff] exact match in snippet view article find links to article
Beijing East Binhai Services 1 Operation Operator(s) China Railway High-speed Technical Line length 171.7 km (107 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Zhengzhou–Kaifeng Intercity Railway (366 words) [view diff] exact match in snippet view article find links to article
17th December 2014 Operator(s) China Railway High-speed Technical Line length 50.33 km (31 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Manamadurai–Virudhunagar line (444 words) [view diff] exact match in snippet view article find links to article
Railways Operator(s) Southern Railway zone Depot(s) Golden Rock Technical Line length 67 km (42 mi) Track gauge 1,676 mm (5 ft 6 in) Loading gauge 4,725 mm
Beijing–Zhangjiakou Intercity Railway (466 words) [view diff] exact match in snippet view article find links to article
Stations 10 Services 1 Operation Operator(s) China Railway High-speed Technical Line length 173.947 km (108 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Keikyū Airport Line (452 words) [view diff] exact match in snippet view article find links to article
Domestic Terminal Stations 7 Operation Opened 1902 Owner Keikyu Technical Line length 6.5 km (4.0 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tehran Metro Line 3 (280 words) [view diff] exact match in snippet view article find links to article
Suburban Railways Organization (Metro) Depot(s) Azadegan Depot Technical Line length 38 km (24 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification Third
Dovre Line (699 words) [view diff] exact match in snippet view article find links to article
Statsbaner CargoNet Rolling stock Class 73, El 14, El 16, El 18 Technical Line length 553 km (344 mi) Number of tracks Single or double Track gauge 1,435 mm
Itsukaichi Line (616 words) [view diff] exact match in snippet view article find links to article
Musashi-Itsukaichi Stations 7 Operation Opened 1925 Operator(s) JR East Technical Line length 11.1 km (6.90 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Line 1 (Budapest Metro) (435 words) [view diff] exact match in snippet view article
Overview Stations 11 Line number Line 1 ("Yellow metro") Technical Line length 4.4 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 550 V DC
Vestmarka Line (71 words) [view diff] exact match in snippet view article find links to article
Operator(s) Norwegian State Railways Character Passenger and freight Technical Line length 14.25 kilometres (9 mi) Number of tracks Single Track gauge 1,435 mm
Keio Inokashira Line (565 words) [view diff] exact match in snippet view article find links to article
1933 Owner Keio Corporation Rolling stock Keio 1000 series Technical Line length 12.7 km (7.9 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in)
U4 (Hamburg U-Bahn) (242 words) [view diff] exact match in snippet view article
Type Rapid transit System Hamburg U-Bahn Stations 11 Operation Opened 2012 Technical Line length 11.9 km (7.4 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Trams in Mannheim/Ludwigshafen (190 words) [view diff] exact match in snippet view article find links to article
Area, Germany Open 1878 (1878) Status Operational Lines 10 (total line length 97 km (60 mi)) Operator(s) Rhein-Neckar-Verkehr (RNV) Infrastructure
502 Downtowner (290 words) [view diff] exact match in snippet view article find links to article
Commission Depot(s) Birchmount Rolling stock Shuttle buses Technical Line length 9.38 km (5.83 mi) Track gauge 4 ft 10 7⁄8 in (1,495 mm) - TTC Gauge
Line 16, Shanghai Metro (484 words) [view diff] exact match in snippet view article find links to article
Transportation Development Co., Ltd. Character Elevated/Underground Technical Line length 58.96 km (36.64 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Suphan Buri Line (114 words) [view diff] exact match in snippet view article find links to article
Maen Stations 16 Operation Opened 16 June 1963 Owner State Railway of Thailand Technical Line length 78 km (48 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in)
Page (paper) (1,184 words) [view diff] case mismatch in snippet view article
com/dictionary/page%E2%80%93turner Lynch, Patrick. "Page Width and Line Length". Yale University Press. Retrieved 2016-11-14.  Broider, Rick (2013)
Saitama Rapid Railway Line (299 words) [view diff] exact match in snippet view article find links to article
2001 Owner Saitama Railway Corporation Depot(s) Urawa-Misono Technical Line length 14.6 km (9.1 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in)
Spikkestad Line (102 words) [view diff] exact match in snippet view article find links to article
Statsbaner Character Commuter trains Rolling stock Class 72 Technical Line length 14 km (8.7 mi) Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Aarhus Letbane (238 words) [view diff] exact match in snippet view article find links to article
(construction project) Operation Opened May 2017 Owner Midttrafik Technical Line length 107 km (66 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Mito Line (328 words) [view diff] exact match in snippet view article find links to article
Operator(s) JR East Rolling stock E501 series/E531 series EMUs Technical Line length 50.2 km (31.2 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 20
Tōyō Rapid Railway Line (245 words) [view diff] exact match in snippet view article find links to article
1996 Owner Toyo Rapid Railway Depot(s) Yachiyo-Midorigaoka Technical Line length 16.2 km (10.1 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in)
Hampton Court branch line (292 words) [view diff] exact match in snippet view article find links to article
Opened 1849 Owner Network Rail Operator(s) South West Trains Technical Line length 1.54 miles (2.48 km) (1 mi 51 chains) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Hankyū Minoo Line (99 words) [view diff] exact match in snippet view article find links to article
Operation Operator(s) Hankyu Railway Depot(s) Hirai Depot Technical Line length 4.0 km (2.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Meitetsu Tsushima Line (115 words) [view diff] exact match in snippet view article find links to article
at Meitetsu (Japanese) Operation Opened 1914 Owner Meitetsu Technical Line length 11.8 km (7.33 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Overhead
Sagami Line (334 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1921 Owner JR East Rolling stock 205-500 series Technical Line length 33.3 km (20.7 mi) Number of tracks Single track Track gauge 1,067 mm
Honam Line (1,408 words) [view diff] exact match in snippet view article find links to article
of Korea Train Express (KTX) services on April 1, 2004. The present line length from Daejeon to Mokpo is 252.5 km (156.9 mi), the line distance from
Gyeongin Line (467 words) [view diff] exact match in snippet view article find links to article
Owner Korea Rail Network Authority Operator(s) Korail Technical Line length 27.0 km (16.8 mi) Number of tracks Double track Track gauge 1,435 mm
Hafslund Line (98 words) [view diff] exact match in snippet view article find links to article
Halfslund Operator(s) Hafslund Smelteverk Character Freight Technical Line length 5.5 km Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
HMS St Albans (1706) (162 words) [view diff] case mismatch in snippet view article
rebuild Class and type: 1706 Establishment 50-gun fourth rate ship of the line Length: 130 ft (39.6 m) (gundeck) Beam: 35 ft (10.7 m) Depth of hold: 14 ft
Maroochydore railway line (260 words) [view diff] exact match in snippet view article find links to article
Maroochydore line Overview Website queenslandrail.com.au Technical Line length 0 km (0 mi) Track length 109 km (68 mi) Track gauge 1,067 mm (3 ft 6 in)
Keikyū Daishi Line (428 words) [view diff] exact match in snippet view article find links to article
Kojimashinden Stations 7 Operation Opened 1899 Owner Keikyu Technical Line length 4.5 km (2.8 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Nikkō Line (401 words) [view diff] exact match in snippet view article find links to article
Opened 1890 Owner JR East Rolling stock 205-600 series EMUs Technical Line length 40.5 km (25.2 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Meitetsu Takehana Line (166 words) [view diff] exact match in snippet view article find links to article
Line at Meitetsu Operation Opened 1921 Owner Nagoya Railroad Technical Line length 10.3 km (6.40 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Overhead
Orlyval (236 words) [view diff] exact match in snippet view article find links to article
Orlyval Overview Stations 3 Ridership 2,500,000 journeys per year Operation Opened 1991 Rolling stock VAL 206 Technical Line length 7.3 km (4.5 mi)
Shanghai–Wuhan–Chengdu High-Speed Railway (911 words) [view diff] exact match in snippet view article find links to article
Owner China Railways Operator(s) China Railway High-speed Technical Line length 2078 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 350-200
Shanghai–Kunming High-Speed Railway (178 words) [view diff] exact match in snippet view article find links to article
Owner China Railways Operator(s) China Railway High-speed Technical Line length 2,066 km (1,284 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Line 2, Dongguan Rail Transit (200 words) [view diff] exact match in snippet view article find links to article
Underground and elevated Rolling stock Bombardier Innovia Metro Technical Line length 37.7 km (23.43 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Keisei Oshiage Line (465 words) [view diff] exact match in snippet view article find links to article
Oshiage Aoto Stations 6 Operation Owner Keisei Electric Railway Technical Line length 5.7 km (3.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Minimum radius 260
Kakogawa Line (172 words) [view diff] exact match in snippet view article find links to article
Opened 1913 Owner JR West Rolling stock 103 series, 125 series Technical Line length 48.5 km (30.1 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Nanjing–Gaochun Intercity Railway (344 words) [view diff] exact match in snippet view article find links to article
Operator(s) Nanjing Metro Character Underground and elevated Technical Line length 35.8 km (22.2 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tsuyama Line (217 words) [view diff] exact match in snippet view article find links to article
Okayama Tsuyama Operation Opened 21 December 1898 Owner JR West Technical Line length 58.7 km (36.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Xiaoshan–Ningbo Railway (268 words) [view diff] exact match in snippet view article find links to article
Hangzhou Ningbo Stations 23 (14 active) Operation Operator(s) China Railways Technical Line length 147.32 km (91.54 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Ui LRT (214 words) [view diff] exact match in snippet view article find links to article
Sinseol-dong Stations 13 Operation Opened July 2017 (planned) Technical Line length 11.4 km (7.1 mi) Number of tracks 2 Track gauge 1435 mm Electrification
Ferranti effect (237 words) [view diff] exact match in snippet view article find links to article
applied. The relative voltage rise is proportional to the square of the line length. The Ferranti effect is much more pronounced in underground cables, even
Kisuki Line (174 words) [view diff] exact match in snippet view article find links to article
Bingo Ochiai Stations 18 Operation Opened 1932 Owner JR West Technical Line length 81.9 km (50.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Beijing–Tianjin Intercity Railway (2,215 words) [view diff] exact match in snippet view article find links to article
Owner China Railways Operator(s) China Railway High-speed Technical Line length Phase I 117 km (73 mi) Phase II 44 km (27 mi) Total 161 km (100 mi)
Jōsō Line (339 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1 November 1913 (1913-11-01) Owner Kanto Railway Technical Line length 51.1 km Track gauge 1,067 mm (3 ft 6 in) Minimum radius 290 m Electrification
Nagano Line (Kintetsu) (323 words) [view diff] exact match in snippet view article
Prefecture, Japan Stations 8 Operation Operator(s) Kintetsu Railway Technical Line length 12.5 km (7.8 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Kururi Line (390 words) [view diff] exact match in snippet view article find links to article
Operator(s) JR East Depot(s) Kisarazu Rolling stock KiHa E130 series Technical Line length 32.2 km (20.0 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in)
Hankyu Senri Line (393 words) [view diff] exact match in snippet view article find links to article
Stations 11 Operation Operator(s) Hankyu Railway Depot(s) Shojaku Technical Line length 13.6 km (8.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Tōkyū Ōimachi Line (400 words) [view diff] exact match in snippet view article find links to article
Stations 15 Operation Opened 6 July 1927 Owner Tokyu Corporation Technical Line length 12.4 km (7.7 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
RER B (796 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1977 (last extension in 1994) Rolling stock MI 79, MI 84 Technical Line length 80.0 km (49.7 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Harbin–Mudanjiang Intercity Railway (473 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Operator(s) China Railway High-speed Technical Line length 293.2 km (182 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Aŭtazavodskaja Line (63 words) [view diff] exact match in snippet view article find links to article
Aŭtazavodskaja Overview Stations 14 Operation Opened 1990 Owner Minsk Metro Technical Line length 18.1 km (11.2 mi) Track gauge 1,524 mm (5 ft)
Aterazawa Line (140 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1921 Owner JR East Rolling stock KiHa 101 DMUs Technical Line length 24.3 km (15.10 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Trunk Line (338 words) [view diff] exact match in snippet view article find links to article
Local and freight trains Rolling stock Class 69 and Class 72 Technical Line length 68 km Track length 112 km Number of tracks 1–2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Île-de-France tramway Line 8 (59 words) [view diff] exact match in snippet view article find links to article
Operator(s) RATP Rolling stock Alstom Citadis 302 Technical Line length 8.46 km (5.26 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Harbin–Jiamusi Intercity Railway (218 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Operator(s) China Railway High-speed Technical Line length 353 km (219 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Sagami Railway Main Line (445 words) [view diff] exact match in snippet view article find links to article
(FY2010) Operation Owner Sagami Railway Depot(s) Kashiwadai Technical Line length 24.6 km (15.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Manchester–Southport line (621 words) [view diff] exact match in snippet view article find links to article
Opened 1855/1888 Owner Network Rail Operator(s) Northern Rail Technical Line length 35.75 miles Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Shibayama Railway (443 words) [view diff] exact match in snippet view article find links to article
Electric Railway crews Rolling stock Keisei 3600 series EMU Technical Line length 2.2 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 1,500 V DC
Manila Metro Rail Transit System Line 7 (591 words) [view diff] exact match in snippet view article find links to article
Department of Transportation Rolling stock Hyundai Rotem Technical Line length 22.8 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Meitetsu Inuyama Line (318 words) [view diff] exact match in snippet view article find links to article
http://www.meitetsu.co.jp/ Operation Opened 1910 Owner Meitetsu Technical Line length 26.8 km (16.65 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Gyeongwon Line (704 words) [view diff] exact match in snippet view article find links to article
1911–1914 Owner Korea Rail Network Authority Operator(s) Korail Technical Line length 94.4 km (58.7 mi) Number of tracks Double track (Yongsan–Dongducheon)
Chengdu–Pujiang Intercity Railway (261 words) [view diff] exact match in snippet view article find links to article
Stations 12 Operation Operator(s) China Railway High-speed Technical Line length 99 km (62 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 200 km/h
Metre (poetry) (6,567 words) [view diff] exact match in snippet view article
extent, but moves toward variations in line length. Han Dynasty poetry tended towards the variable line-length forms of the folk ballads and the Music
Hakata-Minami Line (256 words) [view diff] exact match in snippet view article find links to article
stock 500-7000 series, 700-7000 series, N700-7000/8000 series Technical Line length 8.5 km (5.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
RER C (769 words) [view diff] exact match in snippet view article find links to article
(last extension in 2006) Rolling stock Z 5600, Z 8800, Z 20500, Z 20900 Technical Line length 185.6 km (115.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tōkyū Ikegami Line (367 words) [view diff] exact match in snippet view article find links to article
Stations 15 Operation Opened 1922 Owner Tokyu Corporation Technical Line length 10.8 km (6.7 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Hanawa Line (176 words) [view diff] exact match in snippet view article find links to article
Opened 1914 Owner JR East Rolling stock KiHa 110 series DMUs Technical Line length 106.9 km (66.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Sealdah South lines (410 words) [view diff] exact match in snippet view article find links to article
Operation Owner Indian Railway Operator(s) Eastern Railway Technical Line length 26 km (16 mi) (Sealdah-Budge Budge), 60 km (37 mi)(Sealdah-Diamond
Skøyen–Filipstad Line (153 words) [view diff] exact match in snippet view article find links to article
Rail Administration Operator(s) CargoNet Character Freight Technical Line length 2 km (1.2 mi) Number of tracks Double Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Fredericksburg Line (261 words) [view diff] exact match in snippet view article find links to article
CSX Transportation Operator(s) Virginia Railway Express Character 2 track main line Technical Line length 54 miles Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Meitetsu Bisai Line (202 words) [view diff] exact match in snippet view article find links to article
ridership 11,897 (FY2008) Operation Opened 1898 Owner Meitetsu Technical Line length 30.9 km (19.20 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Overhead
Blue Line (Delhi Metro) (484 words) [view diff] exact match in snippet view article
Corporation Character At-grade, underground, and elevated Technical Line length Main Line: 50.56 kilometers (31.42 mi), Branch: 6.25 kilometers (3.88 mi)
Lake Huron (3,214 words) [view diff] exact match in snippet view article find links to article
Lakes and the St. Lawrence River. Lake Huron has the largest shore line length of any of the Great Lakes, counting its 30,000 islands. Lake Huron is
Line 4, Guangzhou Metro (141 words) [view diff] exact match in snippet view article find links to article
Guangzhou Metro Corporation Character Underground and Elevated Technical Line length 43.7 km (27.15 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
LGV Méditerranée (948 words) [view diff] exact match in snippet view article find links to article
Nîmes Operation Opened 2001 Owner SNCF Réseau Operator(s) SNCF Technical Line length 216 km (134 mi) + 28 km (17 mi) (western branch) Number of tracks Double
Ningbo–Taizhou–Wenzhou Railway (505 words) [view diff] exact match in snippet view article find links to article
active) Operation Owner China Railways Operator(s) China Railway High-speed Technical Line length 275 km (171 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Abukuma Express Line (198 words) [view diff] exact match in snippet view article find links to article
Stations 23 Operation Opened 1 April 1968 Owner Abukuma Express Technical Line length 54.9 km (34.1 mi) Track gauge 1,067 mm (3 ft 6 in) Minimum radius 500
Pingtung Line (72 words) [view diff] exact match in snippet view article find links to article
Administration Operator(s) Taiwan Railways Administration Technical Line length 61.3 km (38.1 mi) Number of tracks 2 Track gauge 3 ft 6 in (1,067 mm)
Dresden S-Bahn (3,640 words) [view diff] exact match in snippet view article find links to article
Line S 1 Technical Line length 77.0 km (47.8 mi) Route number 241.1
Welsh Marches line (670 words) [view diff] exact match in snippet view article find links to article
Crewe) 15 (Newport to Chester) Operation Owner Network Rail Technical Line length 84.38 miles (135.80 km) Number of tracks Double track throughout Track
Keiō Takao Line (487 words) [view diff] exact match in snippet view article find links to article
Takaosanguchi Stations 7 Operation Opened 1967 Owner Keio Corporation Technical Line length 8.6 km Track gauge 1,372 mm (4 ft 6 in) Electrification 1,500 V DC, overhead
Meitetsu Hashima Line (106 words) [view diff] exact match in snippet view article find links to article
Website Meitetsu Operation Opened 1982 Owner Nagoya Railroad Technical Line length 1.3 km (0.81 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Overhead
Tōbu Kiryū Line (213 words) [view diff] exact match in snippet view article find links to article
Akagi Stations 8 Operation Opened May 1911 Owner Tobu Railway Technical Line length 20.3 km (12.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Ningbo–Fenghua Intercity Railway (279 words) [view diff] exact match in snippet view article find links to article
Ningbo Rail Transit Co.,Ltd. Character Underground / Elevated Technical Line length 21.808 km (13.55 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Sengkang LRT Line (463 words) [view diff] exact match in snippet view article find links to article
Mover C810 Mitsubishi Heavy Industries Crystal Mover C810A Technical Line length 10.7 km (6.6 mi) Track gauge 1850 mm Broad Gauge Electrification 750
Penn Central Transportation Company (1,882 words) [view diff] case mismatch in snippet view article find links to article
Philadelphia-Harrisburg; North Jersey Coast Line 700V DC: Harlem Line; Hudson Line Length 20,530 miles (33,040 kilometres) Headquarters Philadelphia, Pennsylvania
S3 (Rhine-Main S-Bahn) (168 words) [view diff] exact match in snippet view article
Regio Depot(s) Frankfurt Hbf Rolling stock DBAG Class 423 Technical Line length 49 km (30 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Kosei Line (420 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1974 Owner JR West Operator(s) JR West JR Freight Technical Line length 74.1 km (46.0 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Nallapadu–Nandyal section (106 words) [view diff] exact match in snippet view article find links to article
Operation Owner Indian Railway Operator(s) South Central Railway Technical Line length 256.91 km (159.64 mi) Track gauge 1,676 mm (5 ft 6 in) Broad gauge
Nankai Airport Line (158 words) [view diff] exact match in snippet view article find links to article
series 7100 series 8000 series 9000 series 50000 series Technical Line length 8.8 km (5.5 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in) Electrification
Changsha–Zhuzhou–Xiangtan Intercity Railway (478 words) [view diff] exact match in snippet view article find links to article
Opened December 26, 2016 Operator(s) China Railway High-speed Technical Line length 97.5 km (61 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Bankura–Masagram line (564 words) [view diff] exact match in snippet view article find links to article
railway) Owner Indian Railway Operator(s) South Eastern Railway Technical Line length Broad gauge: 116 km (72 mi) Track gauge 1,676 mm (5 ft 6 in) Broad Gauge
Tashkent–Samarkand high-speed rail line (674 words) [view diff] exact match in snippet view article find links to article
Uzbekistan Railways Character Passenger Rolling stock Talgo 250 Technical Line length 344 km (214 mi) Track gauge 1,520 mm (4 ft 11 27⁄32 in) Russian gauge
Yamagata Shinkansen (424 words) [view diff] exact match in snippet view article find links to article
Owner JR East Rolling stock E3-1000 series/E3-2000 series Technical Line length 148.6 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 20 kV AC
Balranald railway line (129 words) [view diff] exact match in snippet view article find links to article
1986 (1986) Closed beyond Caldwell March 9, 2006 (2006-03-09) Technical Line length 193.53 km (120.25 mi) Track gauge 5 ft 3 in (1,600 mm) Operating speed
Shi (poetry) (569 words) [view diff] exact match in snippet view article
included in the Classic, there are few formal constraints apart from line length (usually four characters and no more than seven) and rhyming every other
Carnarvonshire Railway (316 words) [view diff] exact match in snippet view article find links to article
Overview Locale Wales Operation Opened 29 July 1862 Closed December 1964 Technical Line length 27 miles (43 km) Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Tenri Line (201 words) [view diff] exact match in snippet view article find links to article
Line number H Operation Opened 1915 Owner Kintetsu Railway Technical Line length 4.5 km (2.8 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line S2, BCR (434 words) [view diff] exact match in snippet view article find links to article
Railways Operator(s) Beijing Suburban Railway Rolling stock NDJ3 Technical Line length 77.07 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 160 km/h
Shenzhen–Maoming High Speed Railway (260 words) [view diff] exact match in snippet view article find links to article
Stations 18 Operation Operator(s) China Railway High-speed Technical Line length 387 km (240 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Empirical theory of perception (2,962 words) [view diff] exact match in snippet view article find links to article
realm of biology. Consider, for example, the case of the distance and line length. When light reflected from a linear object falls on the retina, the object
Nankai Main Line (1,178 words) [view diff] exact match in snippet view article find links to article
waves, or distinguished with blue from conifer or green Kōya Line. Line length: 64.2 km (39.9 mi) Track: quadruple from Namba to Suminoe (to Kishinosato-Tamade
Green Line (Yokohama) (228 words) [view diff] exact match in snippet view article
Municipal Subway Depot(s) Kawawa Rolling stock 10000 series Technical Line length 13.0 km Track gauge 1,435 mm Electrification 1,500 V DC, overhead Operating
Rinkai Line (972 words) [view diff] exact match in snippet view article find links to article
Depot(s) Yashio Rolling stock TWR 70-000 series, E233-7000 series Technical Line length 12.2 km (7.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Yellow Line (Delhi Metro) (319 words) [view diff] exact match in snippet view article
Rolling stock Mitsubishi-ROTEM Broad gauge Bombardier MOVIA Technical Line length 48.8 kilometers (30.3 mi) Track gauge Broad gauge Electrification 25
Meitetsu Komaki Line (342 words) [view diff] exact match in snippet view article find links to article
Series Nagoya Municipal Subway 7000 series (through service) Technical Line length 20.6 km (12.80 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Overhead
Regulated verse (897 words) [view diff] exact match in snippet view article find links to article
line length is fixed at five or seven or characters per line; although, there are some poems which have a six character line-length. The line length is
Aizu Line (399 words) [view diff] exact match in snippet view article find links to article
Aizukōgen-Ozeguchi Stations 21 Operation Owner Aizu Railway Technical Line length 57.4 km (35.7 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Trams in Berlin (3,929 words) [view diff] exact match in snippet view article find links to article
190 kilometres (120 mi) in route length and 430 kilometres (270 mi) in line length. Nine of the lines, called Metrotram, are operated 24 hours per day,
Tōkyū Tamagawa Line (294 words) [view diff] exact match in snippet view article find links to article
Stations 7 Operation Opened 6 August 2000 Owner Tokyu Corporation Technical Line length 5.6 km (3.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Thorpdale railway line (60 words) [view diff] exact match in snippet view article find links to article
Type V/Line passenger service Stations 4 Operation Opened 8 May 1888 Closed 4 December 1958 Technical Line length 18 km (11 mi) Number of tracks Single
St Kilda railway line (402 words) [view diff] exact match in snippet view article find links to article
Windsor, Port Melbourne line Stations 5 Operation Opened 1857 Closed 31 July 1987 Technical Line length 4.5 kilometres Number of tracks Double track
Gjøvik Line (293 words) [view diff] exact match in snippet view article find links to article
Operator(s) NSB Anbud Character Passenger trains Rolling stock BM69G Technical Line length 124 km Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Astram Line (340 words) [view diff] exact match in snippet view article find links to article
20, 1994 Owner Hiroshima Rapid Transit Depot(s) Chōrakuji Technical Line length 18.4 km (11.4 mi) Number of tracks 2 Electrification 750 V DC third rail
Bardhaman–Asansol section (895 words) [view diff] exact match in snippet view article find links to article
1855–1863 Owner Indian Railway Operator(s) Eastern Railway Technical Line length 106 km (66 mi) Number of tracks 4 (2 up and 2 dn) Track gauge 1,676 mm
Nandyal–Yerraguntla section (177 words) [view diff] exact match in snippet view article find links to article
2016 Owner Indian Railway Operator(s) South Central Railway Technical Line length 123 km (76 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in) Broad
Utsunomiya Line (752 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1883 Operator(s) JR East Depot(s) Oyama Technical Line length 159.9 km (99.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Beijing–Guangzhou Railway (941 words) [view diff] exact match in snippet view article find links to article
Guangzhou Stations 53 active Operation Operator(s) China Railways Technical Line length 2,324 km (1,444 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Hankyū Kōyō Line (130 words) [view diff] exact match in snippet view article find links to article
Shukugawa Kōyōen Operation Opened 1924 Owner Hankyu Railway Technical Line length 2.2 km (1.4 mi) Number of tracks Single Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Minsterley branch line (325 words) [view diff] exact match in snippet view article find links to article
Owner Great Western Railway London and North Western Railway Technical Line length 6.5 miles (10.5 km) Number of tracks 1 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Ube Line (288 words) [view diff] exact match in snippet view article find links to article
Termini Shin-Yamaguchi Ube Stations 18 Operation Owner JR West Technical Line length 33.2 km (20.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Paris Métro Line 9 (904 words) [view diff] exact match in snippet view article find links to article
MF 01 (67 trains in revenue service as of 17 November 2016. Technical Line length 19.6 km (12.2 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Wakayama Line (157 words) [view diff] exact match in snippet view article find links to article
series, 103 series, 117 series, 221 series, 201 series EMUs Technical Line length 87.5 km (54.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Yamatoji Line (589 words) [view diff] exact match in snippet view article find links to article
Nara - Kyuhoji) 321 series EMU (Kizu — Nara, Nara - Kyuhoji) Technical Line length 54.0 km (33.6 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in)
KA Commuter Line Duri–Tangerang (96 words) [view diff] exact match in snippet view article find links to article
Api Operator(s) PT KAI Commuter Jabodetabek (PT KCJ) Depot(s) Tangerang Technical Line length 19.297 km (11.991 mi) Track gauge 1,067 mm (3 ft 6 in)
Sealdah–Hasnabad–Bangaon–Ranaghat line (295 words) [view diff] exact match in snippet view article find links to article
Operation Owner Indian Railway Operator(s) Eastern Railway Technical Line length Sealdah-Bongaon: 77 km (48 mi) Barasat-Hasnabad: 52 km (32 mi) Ranaghat-Bangaon:
New Delhi–Mumbai main line (314 words) [view diff] exact match in snippet view article find links to article
North Central Railway, West Central Railway, Western Railway Technical Line length 1,386 km (861 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in)
S9 (Rhine-Main S-Bahn) (121 words) [view diff] exact match in snippet view article
DB Regio Depot(s) Frankfurt Hbf Rolling stock DB Class 420 Technical Line length 66.1 km (41.1 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Sakai Line (113 words) [view diff] exact match in snippet view article find links to article
Termini Yonago Sakaiminato Stations 16 Operation Owner JR West Technical Line length 17.9 km (11.1 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in)
Jammu–Poonch line (178 words) [view diff] exact match in snippet view article find links to article
indianrailways.gov.in Operation Operator(s) Indian Railways Technical Line length 234 km (145 mi) Number of tracks Broad Gauge Track gauge 5 ft 6 in (1
Keihan Ōtō Line (115 words) [view diff] exact match in snippet view article find links to article
Operation Opened 5 October 1989 Owner Keihan Electric Railway Technical Line length 2.3 km (1.4 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Moscow (18,042 words) [view diff] exact match in snippet view article find links to article
a trolleybus route and have trolley wires over them. With the total line length of almost 600 kilometres (370 miles) of single wire, 8 depots, 104 routes
Seibu Tamako Line (422 words) [view diff] exact match in snippet view article find links to article
Railway Rolling stock Seibu 101 series and Seibu 3000 series Technical Line length 9.2 km (5.7 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Electrification
Meitetsu Airport Line (239 words) [view diff] exact match in snippet view article find links to article
Operation Opened 29 January 2005 (2005-01-29) Owner Meitetsu Technical Line length 4.2 km (2.61 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Overhead
Seibu Haijima Line (444 words) [view diff] exact match in snippet view article find links to article
Termini Kodaira Haijima Stations 8 Operation Owner Seibu Railway Technical Line length 14.3 km (8.9 mi) Number of tracks 2 (Single-tracked: from Tamagawa-Jōsui
Kashima Line (516 words) [view diff] exact match in snippet view article find links to article
Opened 1970 Owner JR East Operator(s) JR East, JR Freight Technical Line length 17.4 km (10.8 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Bangor and Carnarvon Railway (366 words) [view diff] exact match in snippet view article find links to article
Chester and Holyhead Railway Operation Opened 20 May 1851 Technical Line length 9 miles (14 km) (including Port Dinorwic Branch) Track gauge 4 ft 8 1⁄2 in
Metronit (588 words) [view diff] case mismatch in snippet view article find links to article
Line Length Towns served Route description Number of stations Frequency Approximate journey time (end to end) Red Line (Line 1) 25 km Kiryat Motzkin,
Gyeonggang Line (287 words) [view diff] exact match in snippet view article find links to article
Bubal Depot Rolling stock Korail Class 371000 (12 trains) Technical Line length 53.8 km (33.4 mi) or 54.8 km (34.1 mi) Number of tracks 2 Track gauge
Hankyū Itami Line (151 words) [view diff] exact match in snippet view article find links to article
Operation Operator(s) Hankyu Railway Depot(s) Nishinomiya Depot Technical Line length 3.1 km (1.9 mi) Number of tracks Double Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Lopburi Line (128 words) [view diff] exact match in snippet view article find links to article
Lamphong Lop Buri Stations 39 Operation Owner State Railway of Thailand Technical Line length 132.81 km (82.52 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in)
Yokohama Minatomirai Railway Kodomonokuni Line (416 words) [view diff] exact match in snippet view article find links to article
Minatomirai Railway Company Operator(s) Tokyu Corporation Technical Line length 3.4 km (2 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Seibu Tamagawa Line (323 words) [view diff] exact match in snippet view article find links to article
Stations 6 Operation Opened 22 October 1917 Owner Seibu Railway Technical Line length 8.0 km (5.0 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Minimum
Line S1, BCR (319 words) [view diff] exact match in snippet view article find links to article
Shimenying Pingguoyuan Operation Operator(s) Beijing Railway Bureau Technical Line length 18.869 kilometres (11.725 mi) Operating speed 110 km/h (68 mph)
Telephone (4,948 words) [view diff] exact match in snippet view article find links to article
adjusts the line's resistance (B1) to maximize the signal power for the line length. Telephones have similar adjustments for inside line lengths (A8). The
Odakyū Odawara Line (801 words) [view diff] exact match in snippet view article find links to article
odakyu.jp/ Operation Opened 1927 Owner Odakyu Electric Railway Technical Line length 82.5 km (51.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Katihar–Siliguri line (571 words) [view diff] exact match in snippet view article find links to article
Owner Indian Railway Operator(s) Northeast Frontier Railway Technical Line length 203 kilometres (126 mi) Track gauge 1,676 mm (5 ft 6 in) Broad gauge
Lyon Metro Line A (244 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1978 Last extension 2007 Rolling stock MPL 75 Technical Line length 9.2 km (5.7 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Rack system None
Trans-Harbour line (Mumbai Suburban Railway) (188 words) [view diff] exact match in snippet view article
(passengers) Owner Indian Railway Operator(s) Central Railway (CR) Character At Grade Technical Line length 20 km Track gauge 1,676 mm (5 ft 6 in) Broad gauge
KLIA Ekspres (985 words) [view diff] exact match in snippet view article find links to article
Conduction system With driver Rolling stock Siemens Desiro ET 425 M Electric Multiple Unit Technical Line length 57 km Track gauge 1 435 mm Standard gauge
S4 (Rhine-Main S-Bahn) (164 words) [view diff] exact match in snippet view article
Regio Depot(s) Frankfurt Hbf Rolling stock DBAG Class 423 Technical Line length 33.5 km (20.8 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Sosa–Wonsi Line (484 words) [view diff] exact match in snippet view article find links to article
Status Under Construction Termini Sosa Wonsi Stations 12 Operation Opened 2018 (planned) Technical Line length 23.3 km (14.5 mi) Number of tracks 2
Paris Métro Line 7 (834 words) [view diff] exact match in snippet view article find links to article
Operator(s) RATP Rolling stock MF 77, 5 carriages per trainset Technical Line length 22.4 km (13.9 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Paris Métro Line 2 (686 words) [view diff] exact match in snippet view article find links to article
system Conductor (PA) Rolling stock MF 2000 (45 trains as of March 22, 2011) Technical Line length 12.4 km (7.7 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
S6 (Rhine-Main S-Bahn) (157 words) [view diff] exact match in snippet view article
Regio Depot(s) Frankfurt Hbf Rolling stock DBAG Class 423 Technical Line length 39.1 km (24.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Tram (16,658 words) [view diff] exact match in snippet view article find links to article
heritage route 15 (line length 13.7 km (8.5 mi)). Put together, it measures 64.6 km (40.1 mi) or 133.5 km (83.0 mi) of line length. The route length is
Tobu Daishi Line (290 words) [view diff] exact match in snippet view article find links to article
December 1931 Owner Tobu Railway Rolling stock Tobu 8000 series Technical Line length 1.0 km (0.62 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Barauni–Katihar section (800 words) [view diff] exact match in snippet view article find links to article
Railway Operator(s) East Central Railway, Northeast Frontier Railway Technical Line length 185 km (115 mi) Track gauge 1,676 mm (5 ft 6 in) Broad gauge
JR Tōzai Line (387 words) [view diff] exact match in snippet view article find links to article
Operator(s) JR West Rolling stock 207 series EMU 321 series EMU Technical Line length 12.5 km (7.8 mi) Number of tracks 2 Track gauge 1,067 mm (3 ft 6 in)
Uchiko Line (474 words) [view diff] exact match in snippet view article find links to article
Niiya Stations 4 Operation Opened 1920 Operator(s) JR Shikoku Technical Line length 5.3 km (3.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Liverpool–Parramatta T-way (1,000 words) [view diff] exact match in snippet view article find links to article
Parramatta Stations 35 Operation Opened February 2003 Owner Transport for NSW Operator(s) Transit Systems Sydney Technical Line length 30 km (19 mi)
Electric power transmission (9,979 words) [view diff] exact match in snippet view article find links to article
l {\displaystyle l} (the line length) in all parameters of the transmission matrix. (For the full development
Sabari railway line (668 words) [view diff] exact match in snippet view article find links to article
Railway zone Depot(s) Kollam Ernakulam Rolling stock WDP-4 Technical Line length 191 km (119 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in)
Keihan Main Line (341 words) [view diff] exact match in snippet view article find links to article
1910 Owner Keihan Electric Railway Depot(s) Neyagawa, Yodo Technical Line length 49.3 km (30.6 mi) Number of tracks 2 (Yodoyabashi - Temmabashi, Neyagawa
New Jalpaiguri–New Bongaigaon section (593 words) [view diff] exact match in snippet view article find links to article
2003 Owner Indian Railways Operator(s) Northeast Frontier Railway Technical Line length 248 km (154 mi) Track gauge 1,676 mm (5 ft 6 in) broad gauge
Tsugaru Line (347 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1951 Owner JR East Rolling stock KiHa 100 series Technical Line length 58.4 km (36.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 20
Paris Métro Line 5 (589 words) [view diff] exact match in snippet view article find links to article
Conductor Rolling stock MF 01 (53 trains as of 8 October 2016) Technical Line length 14.6 km (9.1 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
North-link Line (87 words) [view diff] exact match in snippet view article find links to article
Administration Operator(s) Taiwan Railways Administration Technical Line length 79.2 km (49.2 mi) Number of tracks 2 Track gauge 3 ft 6 in (1,067 mm)
Waterline (2,032 words) [view diff] exact match in snippet view article find links to article
approximately 115 millimetres in height and 75 millimetres in width. The load line length is referred to during and following load line calculations. The letters
Stafford–Manchester line (317 words) [view diff] exact match in snippet view article find links to article
Trains London Midland Northern Rail Virgin Trains CrossCountry Technical Line length 53.9 miles (86.7 km) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Gudur–Renigunta section (157 words) [view diff] exact match in snippet view article find links to article
Owner Indian Railway Operator(s) South Central Railway zone Technical Line length 134.78 km (83.75 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in)
Waterbury Branch (516 words) [view diff] exact match in snippet view article find links to article
stock GE Genesis P32AC-DM Brookville BL20GH Shoreliner coaches Technical Line length 28.5 mi (45.87 km) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Oslo Port Line (196 words) [view diff] exact match in snippet view article find links to article
Railways Operator(s) Norwegian State Railways Character Freight Technical Line length 2.2 km Track length 2.2 km Number of tracks Single Track gauge 1,435 mm
Seymour V/Line rail service (117 words) [view diff] exact match in snippet view article find links to article
VLocity railcars, locomotive hauled N and H type carriages Technical Line length 81 km (50.3 mi) Number of tracks Double broad gauge track to near Seymour
S5 (Rhine-Main S-Bahn) (196 words) [view diff] exact match in snippet view article
Regio Depot(s) Frankfurt Hbf Rolling stock DBAG Class 423 Technical Line length 28.9 km (18.0 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
RER E (522 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1999 (last extension in 2003) Rolling stock Z 22500, Z 50000 Technical Line length 52.3 km (32.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Silom Line (632 words) [view diff] exact match in snippet view article find links to article
Siemens Modular Metro CNR Changchun Bombardier Movia 4 cars per trainset Technical Line length 14.5 km (9.0 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Holmfirth branch line (968 words) [view diff] exact match in snippet view article find links to article
Stations 2 Operation Opened 1 July 1850 Closed 2 November 1959 Technical Line length 2 mi (3.2 km) Number of tracks Double Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Kanmon Tunnel (572 words) [view diff] exact match in snippet view article find links to article
Honshu-Kyushu Operation Opened 1942 Operator JR Kyushu Character Passenger and freight Technical Line length 3,604 m (11,824 ft)/ 3,614 m (11,857 ft)
Beijing–Harbin Railway (475 words) [view diff] exact match in snippet view article find links to article
Beijing-Harbin Railway Line length: 1,249 km (776 mi) Track gauge: 1,435 mm (4 ft 8 1⁄2 in) Stations and structures Legend
Howrah–Delhi main line (1,268 words) [view diff] exact match in snippet view article find links to article
Operator(s) Eastern Railway, East Central Railway, Northern Railway Technical Line length 1,532 km (952 mi) Number of tracks 2/4 Track gauge 1,676 mm (5 ft 6 in)
Seishin-Yamate Line (204 words) [view diff] exact match in snippet view article find links to article
March 13, 1977 Owner Kobe Municipal Transportation Bureau Technical Line length 22.7 km (14.1 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Platte Valley Trolley (643 words) [view diff] exact match in snippet view article find links to article
Opened July 4, 1989 Operator(s) Denver Tramway Heritage Society Technical Line length 1.2 miles Track gauge 4 ft 8 1⁄2 in (1,435 mm) Minimum radius (?) Electrification
Domyoji Line (349 words) [view diff] exact match in snippet view article find links to article
March 24, 1898 Operator(s) Kintetsu Railway Depot(s) Furuichi Technical Line length 2.2 km (1.4 mi) Number of tracks 1 Track gauge 1,067 mm (3 ft 6 in) Electrification
PNR Metro South Commuter Line (906 words) [view diff] exact match in snippet view article find links to article
Series EMUs 900 Series Locomotives 2500 Series Locomotives Technical Line length 28.09 km (17.45 mi) Track gauge 3 ft 6 in (1,067 mm) Operating speed
Line 2, Chongqing Rail Transit (178 words) [view diff] exact match in snippet view article find links to article
Peak) Operation Opened 18 June 2005 Operator(s) Chongqing Rail Transit Corp., Ltd Rolling stock Hitachi Monorail Technical Line length 31.3 km (19.4 mi)
Echigo Tokimeki Railway (997 words) [view diff] exact match in snippet view article find links to article
Railway Rolling stock ET127 series EMUs E653-1100 series EMUs Technical Line length 37.7 km (23.4 mi) Number of tracks Single track Track gauge 1,067 mm
Sōbu Line (Rapid) (407 words) [view diff] exact match in snippet view article
Chiba Stations 10 Operation Opened 1972 Operator(s) JR East Technical Line length 60.2 km (37.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Wadamisaki Line (267 words) [view diff] exact match in snippet view article find links to article
Wadamisaki Stations 2 Operation Opened 8 July 1890 Owner JR West Technical Line length 2.7 km (1.7 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Frankfurt Airport loop (348 words) [view diff] exact match in snippet view article find links to article
Overview Native name Flughafenschleife Frankfurt Locale Hesse, Germany Line number 3683 Technical Line length 15.8 km (9.8 mi) Route number 645.8, 645.9
New Jalpaiguri–Alipurduar–Samuktala Road line (789 words) [view diff] exact match in snippet view article find links to article
Opened 1950 Owner Indian Railway Operator(s) Northeast Frontier Railway Technical Line length 182 km (113 mi) Track gauge 1,676 mm (5 ft 6 in) broad gauge
Chinese poetry (2,708 words) [view diff] no match in snippet view article find links to article
Tang Dynasty with rules governing the structure of a poem, in terms of line-length, number of lines, tonal patterns within the lines, the use of rhyme,
Poetry (10,754 words) [view diff] exact match in snippet view article find links to article
poem is normal; either way with the even numbered lines rhyming. The line length is scanned by according number of characters (according to the convention
Samastipur–Muzaffarpur section (267 words) [view diff] exact match in snippet view article find links to article
Samastipur Rolling stock WDM-2, WDM-3A, WDS-5, WDP 4 and WDG 4 Technical Line length 53 km (33 mi) Track length 125 km (78 mi) Number of tracks 2 (electrified)
Naples–Aversa railway (158 words) [view diff] exact match in snippet view article find links to article
Italy Stations 5 Operation Opened 2005 (2005) Operator(s) EAV Technical Line length 10.5 km (6.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Paris Métro Line 3 (815 words) [view diff] exact match in snippet view article find links to article
(OCTYS) Rolling stock MF 67 (48 trains as of October 31, 2010) Technical Line length 11.665 km (7.248 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Tokyo Metro Hibiya Line (1,067 words) [view diff] exact match in snippet view article find links to article
Metro 03 series, Tobu 20000 series, Tokyo Metro 13000 series Technical Line length 20.3 km (12.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Manassas Line (222 words) [view diff] exact match in snippet view article find links to article
Virginia Railway Express Character grade-separated, Underground and above ground Technical Line length 35 miles (56 km) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Tōkyū Tōyoko Line (894 words) [view diff] exact match in snippet view article find links to article
Operation Opened 14 February 1926 Owner Tokyu Corporation Technical Line length 24.2 km (15.0 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Barauni–Samastipur section (262 words) [view diff] exact match in snippet view article find links to article
Samastipur Rolling stock WDM-2, WDM-3A, WDS-5, WDP 4 and WDG 4 Technical Line length 50.54 km (31 mi) Track length 120 km (75 mi) Number of tracks 2 (electrified)
Obama Line (233 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1917 Owner JR West Rolling stock 125 series Technical Line length 84.3 km (52.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
HSL 1 (453 words) [view diff] exact match in snippet view article find links to article
Thalys TGV Rolling stock Class 373/1 Thalys fleet TGV fleet Technical Line length 88 km (55 mi) Number of tracks Double track throughout + loops Track
Line 2, Guangzhou Metro (143 words) [view diff] exact match in snippet view article find links to article
Operator(s) Guangzhou Metro Corporation Character Underground Technical Line length 31.4 km (19.51 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Port Klang Line (617 words) [view diff] exact match in snippet view article find links to article
Komuter CSR EMU 37 six-car trains Rolling stocks formation Technical Line length 126 km (78 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in) Electrification Overhead
Line 6, Tianjin Metro (106 words) [view diff] exact match in snippet view article find links to article
Metro Corporation Character Underground, At-grade, & Elevated Technical Line length 26 km (16.16 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Sakurai Line (251 words) [view diff] exact match in snippet view article find links to article
series EMU, 105 series EMU, 201 series EMU, 221 series EMU Technical Line length 29.4 km (18.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Barauni–Guwahati line (800 words) [view diff] exact match in snippet view article find links to article
Railway Operator(s) East Central Railway, Northeast Frontier Railway Technical Line length 804 km (500 mi) Track gauge 1,676 mm (5 ft 6 in) Broad gauge
Muzaffarpur–Hajipur section (272 words) [view diff] exact match in snippet view article find links to article
stock Diesel Locos: WDM-2, WDM-3A, WDS-5, WDP 4 and WDG 4 Technical Line length 53.83 km (33.4 mi) Track length 59 km (36.7 mi) Number of tracks 1 (electrified)
Peterborough–Lincoln line (516 words) [view diff] exact match in snippet view article find links to article
Rolling stock Class 153 Super Sprinter Class 156 Super Sprinter Technical Line length ~24 mi (39 km) Number of tracks Two Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Manila Light Rail Transit System Line 4 (561 words) [view diff] exact match in snippet view article find links to article
000 (est.) Operation Opened TBA Owner TBA Operator(s) TBA Technical Line length TBA Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge Electrification
Trans-Gabon Railway (752 words) [view diff] exact match in snippet view article find links to article
Termini Libreville Franceville Stations 23 Operation Opened 1987 Technical Line length 669 km (416 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Meitetsu Kakamigahara Line (207 words) [view diff] exact match in snippet view article find links to article
Meitetsu-Gifu Shin-Unuma Stations 18 Operation Owner Meitetsu Technical Line length 17.6 km (10.94 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Bittern Line (716 words) [view diff] exact match in snippet view article find links to article
153 "Sprinter" Class 156 "Sprinter" Class 170 "Turbostar" Technical Line length 30.4 miles (48.9 km) Number of tracks 1-2 Track gauge 4 ft 8 1⁄2 in (1
Muzaffarpur–Gorakhpur main line (285 words) [view diff] exact match in snippet view article find links to article
Rolling stock Diesel Locos: WDM-2, WDM-3A, WDP 4 and WDG 4 Technical Line length 309.720 km (192 mi) Track length 318 km Number of tracks 1 (non-electrified
Barharwa–Azimganj–Katwa loop (210 words) [view diff] exact match in snippet view article find links to article
Opened 1913 Owner Indian Railway Operator(s) Eastern Railway Technical Line length 170 km (106 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in) Broad
Pinggu Line, Beijing Subway (167 words) [view diff] exact match in snippet view article find links to article
Operator(s) Beijing Mass Transit Railway Operation Corp., Ltd Technical Line length 72km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 160 km/h (maximum
SRT Light Red Line (665 words) [view diff] exact match in snippet view article find links to article
Phase 3 Taling Chan - Sala Ya) Owner State Railway of Thailand Technical Line length 58.5 km (36.35 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in) metre gauge Electrification
Overscan (2,126 words) [view diff] exact match in snippet view article find links to article
pixels per line. In order to accommodate both formats within the same line length, and to avoid cutting off parts of the active picture if the timing of
Sperillen Line (209 words) [view diff] exact match in snippet view article find links to article
Operator(s) Norwegian State Railways Character Passenger and freight Technical Line length 23.91 kilometres (15 mi) Number of tracks Single Track gauge 1,435 mm
Gaya–Mughalsarai section (732 words) [view diff] exact match in snippet view article find links to article
1907 Owner Indian Railway Operator(s) East Central Railway Technical Line length 197 km (122 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in) Broad
Island Line Trains (1,038 words) [view diff] exact match in snippet view article find links to article
(Stagecoach) Website www.southwesttrains.co.uk/island-line.aspx Technical Line length 8 miles 34 chains Gauge Standard Operating speed 45 mph (72 km/h) max
City Circle (760 words) [view diff] exact match in snippet view article find links to article
20 January 1956 (1956-01-20) Owner RailCorp Operator(s) Sydney Trains Technical Line length 6 km (3.7 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Katsuragisan Ropeway (136 words) [view diff] exact match in snippet view article find links to article
Technical features Aerial lift type Aerial tramway Manufactured by Kinki Sharyo Line length 1.421 km (0.9 mi) No. of cables 3 Installed power 440 V AC
HSL 3 (568 words) [view diff] exact match in snippet view article find links to article
ICE, SNCB Rolling stock Thalys PBKA, ICE 3M, Class 13 + I11 Technical Line length 56 km (35 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Meitetsu Hiromi Line (293 words) [view diff] exact match in snippet view article find links to article
Takehana Line at Meitetsu Operation Opened 1920 Owner Meitetsu Technical Line length 22.3 km (13.86 mi) Track gauge 1,067 mm (3 ft 6 in) Old gauge 762 mm
Miyazu Line (371 words) [view diff] exact match in snippet view article find links to article
1924 Owner Kitakinki Tango Railway Operator(s) Willer Trains Technical Line length 83.6 km (51.9 mi) Track gauge 1,067 mm (3 ft 6 in) Operating speed 85 km/h
Line 1, Shanghai Metro (453 words) [view diff] exact match in snippet view article find links to article
Metro Operation Co. Ltd. Character Underground and elevated Technical Line length 36.39 km (22.61 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
GO-ALRT (501 words) [view diff] exact match in snippet view article find links to article
Operator(s) GO Transit Rolling stock modified S-series (articulated) Technical Line length 200 km (approximate) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Line 11, Shanghai Metro (344 words) [view diff] exact match in snippet view article find links to article
Nanxiang to North Jiading and East Changji Road to Huaqiao) Technical Line length 82.4 km (51.20 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Paris Métro Line 11 (735 words) [view diff] exact match in snippet view article find links to article
as of October 31, 2010 MP 73 1 train as of October 31, 2010 Technical Line length 6,286 km (3,906 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
HSL 2 (535 words) [view diff] exact match in snippet view article find links to article
PBKA, ICE 3M, SNCB Class 18 or Class 13 + I11 or I6 or I10 Technical Line length 64 km (40 mi) Track length 128 km (80 mi) Number of tracks 2 Track gauge
Beijing–Shijiazhuang High-Speed Railway (153 words) [view diff] exact match in snippet view article find links to article
Opened December 26, 2012 Operator(s) China Railway High-speed Technical Line length 281 km (175 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Rome–Civitacastellana–Viterbo railway (202 words) [view diff] exact match in snippet view article find links to article
Viterbo Website ATAC (Italian) Operation Operator(s) ATAC Technical Line length 102 km (63 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 3
Xuzhou–Lanzhou High-Speed Railway (286 words) [view diff] exact match in snippet view article find links to article
Owner China Railways Operator(s) China Railway High-speed Technical Line length 1,363 km (847 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Tokyo Metro Hanzōmon Line (859 words) [view diff] exact match in snippet view article find links to article
series, Tokyu 8590 series, Tobu 30000 series, Tobu 50050 series Technical Line length 16.8 km (10.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Taita Line (236 words) [view diff] exact match in snippet view article find links to article
Mino-Ōta Stations 8 Operation Opened 1926 Owner JR Central Technical Line length 17.8 km (11.1 mi) Number of tracks Single Track gauge 1,067 mm (3 ft 6 in)
Line 1 (Metro Bilbao) (159 words) [view diff] exact match in snippet view article
Stations 28 Operation Opened November 11, 1995 Operator(s) Metro Bilbao S.A. Technical Line length 31 km (19 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
KA Commuter Line Jakarta Kota–Bogor (151 words) [view diff] exact match in snippet view article find links to article
Indonesia Operator(s) PT KAI Commuter Jabodetabek Depot(s) Depok Bukit Duri Technical Line length 54.8 km (34.1 mi) Track gauge 1,067 mm (3 ft 6 in)
Tehran Metro Line 5 (100 words) [view diff] exact match in snippet view article find links to article
Suburban Railways Organization (Metro) Depot(s) Tehran-West Depot Technical Line length 41 km (25 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification 25
Milan Metro Line 5 (474 words) [view diff] exact match in snippet view article find links to article
Operation Opened 10 February 2013 Operator(s) Metro 5 SpA Technical Line length 12.8 km (8.0 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) standard gauge
Shoranur–Mangalore section (122 words) [view diff] exact match in snippet view article find links to article
Operator(s) Palakkad Railway Division of Southern Railway zone Technical Line length 307 km (190.76 mi) Track length 307 km (190.76 mi) Number of tracks 2
Waterloo & City line (7,240 words) [view diff] exact match in snippet view article find links to article
far the shortest line on the entire London Underground network, with a line length of 2.37 km (1.47 miles), and an end-to-end journey lasting just four
Tobu Isesaki Line (817 words) [view diff] exact match in snippet view article find links to article
Opened August 27, 1899 Owner Tobu Railway Depot(s) Tatebayashi Technical Line length 75.1 km (46.7 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Kaigan Line (88 words) [view diff] exact match in snippet view article find links to article
Transportation Bureau Operator(s) Kobe Municipal Transportation Bureau Technical Line length 7.9 km (4.9 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
503 Kingston Rd (269 words) [view diff] exact match in snippet view article find links to article
Toronto Transit Commission Depot(s) Russell Rolling stock CLRV Technical Line length 8.97 km (5.57 mi) Track gauge 4 ft 10 7⁄8 in (1,495 mm) - TTC Gauge
Hangzhou–Changsha High-Speed Railway (628 words) [view diff] exact match in snippet view article find links to article
2014 Owner China Railway Operator(s) China Railway High-speed Technical Line length 921 km Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed 350 km/h
Second Life (11,560 words) [view diff] exact match in snippet view article find links to article
mainland max prim limits) Additional land Parcel size (m2) Square equal line length (m) Max prims  1⁄128 mainland region 512 22×22 (16×32) 117  1⁄64 mainland
Tōkaidō Shinkansen (1,481 words) [view diff] exact match in snippet view article find links to article
Mishima, Nagoya, Osaka Rolling stock 700 series N700 series Technical Line length 515.4 km (320.3 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Catopsilia pomona (1,500 words) [view diff] no match in snippet view article find links to article
segments, especially 3 and 4, are distinctly flanged on the spiracular line. Length 51 mm. Pupation takes place low to the ground. The pupa is
Line 8 (Taipei Metro) (116 words) [view diff] exact match in snippet view article
Rapid Transit Corporation Character Underground, Elevated Depot(s) Xizhi Depot Technical Line length 17 km (10.6 mi) Track gauge 6 ft 2 in (1,880 mm)
Randsfjorden Line (468 words) [view diff] exact match in snippet view article find links to article
Character Long-haul passenger traffic Rolling stock BM 73 Technical Line length 87 kilometres (54 mi) Number of tracks 1 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Ernakulam–Kayamkulam coastal line (432 words) [view diff] exact match in snippet view article find links to article
ago (1989-10-16) Owner Indian Railways Operator(s) Southern Railway zone Technical Line length 100 km (62 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in) Loading
Getty Center Monorail (282 words) [view diff] exact match in snippet view article find links to article
Getty Center (upper station) Stations 2 Operation Opened 1997 Rolling stock 6 cars Technical Line length 1.21 km (0.75 mi) Number of tracks 1 (Monorail)
Santa Fe Western Railway (266 words) [view diff] exact match in snippet view article find links to article
SF Cruz Alta Services 1 Operation Opened 1883 Closed 1900; 117 years ago (1900) Technical Line length 120 km (75 mi) Track gauge 1,676 mm (5 ft 6 in)
Córdoba North Western Railway (259 words) [view diff] exact match in snippet view article find links to article
1901; 116 years ago (1901) (merged to Córdoba Central Railway) Technical Line length 152 km (94 mi) Track gauge 1,000 mm (3 ft 3 3⁄8 in) metre gauge
Congo–Ocean Railway (1,000 words) [view diff] exact match in snippet view article find links to article
Congo–Ocean Railway Chemin de fer Congo-Océan Line length: 512 km / 318 mi Track gauge: 1067 mm / 3 ft 6 in Legend
Mauritania Railway (418 words) [view diff] exact match in snippet view article find links to article
Mauritania Railway Map of Mauritania Railway Line length: 704 km (437 mi) Track gauge: 1,435 mm (4 ft 8 1⁄2 in) standard gauge Legend
Île-de-France tramway Line 11 Express (240 words) [view diff] exact match in snippet view article find links to article
Bourget Stations 14 Operation Opened 1 July 2017 (2017-07-01) Operator(s) Transkeo Rolling stock Alstom Citadis Dualis Technical Line length 28 km (17 mi)
Keihan Keishin Line (292 words) [view diff] exact match in snippet view article find links to article
Prefecture Services 7 Operation Operator(s) Keihan Electric Railway Technical Line length 7.5 km (4.7 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Kitakami Line (143 words) [view diff] exact match in snippet view article find links to article
Yokote Stations 17 Operation Opened 1924 Operator(s) JR East Technical Line length 61.6 km (38.3 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification non
Kamaishi Line (753 words) [view diff] exact match in snippet view article find links to article
Hanamaki Kamaishi Stations 24 Operation Operator(s) JR East Technical Line length 90.2 km (56.0 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification None
Ōminato Line (263 words) [view diff] exact match in snippet view article find links to article
Owner East Japan Railway Company Rolling stock KiHa 100 series Technical Line length 58.4 km (36.3 mi) Track gauge 3 ft 6 in (1,067 mm) Electrification none
Bairnsdale V/Line rail service (280 words) [view diff] exact match in snippet view article find links to article
Rolling stock V/Line N class locomotive hauled N type carriages Technical Line length 276.8 km Number of tracks Double track to Drouin, single track with passing
Line 8, Guangzhou Metro (164 words) [view diff] exact match in snippet view article find links to article
Operator(s) Guangzhou Metro Corporation Character Underground Technical Line length 14.8 km (9.20 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Line 3, Shanghai Metro (838 words) [view diff] exact match in snippet view article find links to article
Shanghai No.3 Metro Operation Co. Ltd. Character Elevated Technical Line length 40.23 km (25.00 mi) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Meitetsu Gamagōri Line (225 words) [view diff] exact match in snippet view article find links to article
Operation Opened November 10, 1936 (1936-11-10) Owner Meitetsu Technical Line length 17.6 km (10.94 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Gandhidham–Ahmedabad main line (327 words) [view diff] exact match in snippet view article find links to article
Opened 1969 Owner Indian Railways Operator(s) Western Railway Technical Line length 299.2 km (186 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in)
U3 (Vienna U-Bahn) (81 words) [view diff] exact match in snippet view article
Termini Ottakring Simmering Stations 21 Operation Opened 1991 Operator(s) Wiener Linien Technical Line length 13.4 km Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Medway Valley line (888 words) [view diff] exact match in snippet view article find links to article
395 "Javelin" Class 465 "Networker" Class 466 "Networker" Technical Line length 21 miles 19 chains (34.18 km) Number of tracks 2 Track gauge 1,435 mm
Line 2 (Metro Bilbao) (263 words) [view diff] exact match in snippet view article
Santurzi Stations 25 Operation Opened April 13, 2002 Operator(s) Metro Bilbao S.A. Technical Line length 20 km (12 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Fukuen Line (293 words) [view diff] exact match in snippet view article find links to article
Prefecture Termini Fukuyama Miyoshi Operation Owner JR West Technical Line length 85.1 km (52.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
R3 (Rodalies de Catalunya) (958 words) [view diff] exact match in snippet view article
through the Vallès Oriental, Osona and Ripollès regions. With a total line length of 165.9 kilometres (103.1 mi), it extends notably beyond the limits
Circumflegrea railway (196 words) [view diff] exact match in snippet view article find links to article
Campania, Italy Operation Opened 1963 to 1986 Operator(s) EAV Technical Line length 27.042 km (16.803 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Maldon – Dombarton railway line (964 words) [view diff] exact match in snippet view article find links to article
Dombarton railway line Overview Type heavy rail Commenced 1983 Technical Line length 34.9 km (21.7 mi) Track gauge 4 ft 8 1⁄2 in (1,435 mm) Highest elevation
Kashii Line (142 words) [view diff] exact match in snippet view article find links to article
Stations 16 Operation Opened 1 January 1904 Owner JR Kyushu Technical Line length 25.4 km (15.8 mi) Number of tracks Single Track gauge 1,067 mm (3 ft 6 in)
Gaya–Kiul line (440 words) [view diff] exact match in snippet view article find links to article
1879 Owner Indian Railway Operator(s) East Central Railway Technical Line length 129 km (80 mi) Number of tracks 1 (single) Track gauge Broad Gauge 1
Milan Metro Line 1 (656 words) [view diff] exact match in snippet view article find links to article
stock 63 trains: UdT (various series) AnsaldoBreda Meneghino Technical Line length 27 km (17 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification third/fourth
Haldibari–New Jalpaiguri line (469 words) [view diff] exact match in snippet view article find links to article
Owner Indian Railway Operator(s) Northeast Frontier Railway Technical Line length 58 kilometres (36 mi) Track gauge 1,676 mm (5 ft 6 in) broad gauge
Northeastern Line (Thailand) (552 words) [view diff] exact match in snippet view article
Depot, Nakhon Ratchasima Depot, and Ubon Ratchathani Depot Technical Line length 575 km (357 mi) (Ubon Ratchathani Main Line) 627.5 km (389.9 mi) (Nong
HSL 4 (700 words) [view diff] exact match in snippet view article find links to article
Opened 2009 Operator(s) National Railway Company of Belgium Technical Line length 36 km (22 mi) Number of tracks double track Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Suzhou Rail Transit (804 words) [view diff] case mismatch in snippet view article find links to article
Line Number of stations Line Length Terminals Scheduled Opening Construction began   Line 3 31 45.2 Suzhouxinquzhan (Suzhou New District Railway Station)
Muzaffarpur–Sitamarhi section (383 words) [view diff] exact match in snippet view article find links to article
station in Muzaffarpur Rolling stock Diesel locos: WDM-2, WDM-3A Technical Line length 65.8 km (40.9 mi) Track length 69 km (42.9 mi) Number of tracks 1 (Diesel
Tenali–Repalle branch line (163 words) [view diff] exact match in snippet view article find links to article
South Central Railway zone Character At-grade street running Technical Line length 32.10 km (19.95 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in)
Toei Shinjuku Line (514 words) [view diff] exact match in snippet view article find links to article
Toei 10-300R series, Toei 10-000 series, Keio 9030 series Technical Line length 23.5 km (14.6 mi) Track gauge 1,372 mm (4 ft 6 in) Electrification 1
Île-de-France tramway Line 5 (77 words) [view diff] exact match in snippet view article find links to article
year Operation Opened 2013 (2013) Operator(s) RATP Rolling stock Translohr Technical Line length 6.6 km (4.1 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Patna–Mughalsarai section (350 words) [view diff] exact match in snippet view article find links to article
1862 Owner Indian Railway Operator(s) East Central Railway Technical Line length 212 km (132 mi) Number of tracks 2 Track gauge Broad Gauge 1,676 mm (5 ft 6 in)
Asansol–Patna section (502 words) [view diff] exact match in snippet view article find links to article
Railway Operator(s) Eastern Railway, East Central Railway Technical Line length 331 km (206 mi) Number of tracks 2 Track gauge Broad Gauge 1,676 mm (5 ft 6 in)
Shima Line (1,363 words) [view diff] exact match in snippet view article find links to article
Tracks re-routed through Aomine Tunnel on Shiraki to Gochi section. Total line length reduced by 0.7 km. May 30, 2001 - Wanman driver-only operation begins
Sasaguri Line (199 words) [view diff] exact match in snippet view article find links to article
Termini Keisen Yoshizuka Stations 11 Operation Owner JR Kyushu Technical Line length 25.1 km (15.6 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 20
Avoca railway line (318 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1874 Completed 1890 Closed 2005 Rolling stock Ballast, Grain Technical Line length 87.769 km (54.537 mi) Number of tracks Single track
Harbin–Qiqihar Intercity Railway (937 words) [view diff] exact match in snippet view article find links to article
Services 1 Operation Operator(s) China Railway High-speed Technical Line length 281.5 km (175 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Keiō Line (764 words) [view diff] exact match in snippet view article find links to article
www.keio.co.jp Operation Opened 1913 Owner Keio Corporation Technical Line length 37.9 km (23.55 mi) Track gauge 1,372 mm (4 ft 6 in) Electrification 1
Millis Branch (713 words) [view diff] exact match in snippet view article find links to article
Railroad Operator(s) New York, New Haven and Hartford Railroad Character Surface-level Technical Line length 22.1 miles Track gauge 4 ft 8 1⁄2 in (1,435 mm)
Kishigawa Line (391 words) [view diff] exact match in snippet view article find links to article
Wakayama Stations 14 Operation Owner Wakayama Electric Railway Technical Line length 14.3 km (8.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Line 6, Guangzhou Metro (258 words) [view diff] exact match in snippet view article find links to article
Corporation Character Underground/Elevated (Three stations) Technical Line length 41.7 km (25.9 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Electrification
Seoul Subway Line 6 (420 words) [view diff] exact match in snippet view article find links to article
38 Operation Opened 7 August 2000 Operator(s) Seoul Metropolitan Rapid Transit Corporation Technical Line length 35.1 km (21.8 mi) Number of tracks 2
Query string (1,926 words) [view diff] exact match in snippet view article find links to article
According to the HTTP specification: Various ad hoc limitations on request-line length are found in practice. It is RECOMMENDED that all HTTP senders and recipients
Guwahati–Lumding section (603 words) [view diff] exact match in snippet view article find links to article
Indian Railways Operator(s) Northeast Frontier Railway zone Technical Line length 179 km (111 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in) Old
Onoda Line (253 words) [view diff] exact match in snippet view article find links to article
Yamaguchi Prefecture Termini Inō Onoda Operation Owner JR West Technical Line length 11.6 km (7.2 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Yokohama Line (672 words) [view diff] exact match in snippet view article find links to article
Opened 1908 Operator(s) JR East Rolling stock E233-6000 series Technical Line length 42.6 km (26.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Orange County Line (662 words) [view diff] exact match in snippet view article find links to article
Operator(s) Metrolink Character Elevated and surface-level Technical Line length 87.2 miles (140.3 km) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating
Tōbu Nikkō Line (657 words) [view diff] exact match in snippet view article find links to article
Operation Opened 1929 Owner Tobu Railway Depot(s) Minami-Kurihashi Technical Line length 94.5 km (58.7 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Gyeongbuk Line (319 words) [view diff] exact match in snippet view article find links to article
1966 Owner Korea Rail Network Authority Operator(s) Korail Technical Line length 115.2 km (71.6 mi) Number of tracks Single track Track gauge 1,435 mm
Toden Arakawa Line (656 words) [view diff] exact match in snippet view article find links to article
1974 Owner Tokyo Metropolitan Bureau of Transportation (Toei) Technical Line length 12.2 km (7.6 mi) Track gauge 1,372 mm (4 ft 6 in) Electrification 600
Oga Line (304 words) [view diff] exact match in snippet view article find links to article
9 November 1913 (1913-11-09) Owner JR East Rolling stock KiHa 40 series Technical Line length 26.6 km (16.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification Not
U4 (Vienna U-Bahn) (84 words) [view diff] exact match in snippet view article
Hütteldorf Heiligenstadt Stations 20 Operation Opened 1976 Operator(s) Wiener Linien Technical Line length 16.5 km Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Qingdao–Taiyuan High-Speed Railway (158 words) [view diff] exact match in snippet view article find links to article
Owner China Railways Operator(s) China Railway High-speed Technical Line length 873 km (542 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in) Operating speed
Daegok–Sosa Line (270 words) [view diff] exact match in snippet view article find links to article
(素砂-大谷線) Sosa-Daegokseon Status Planned Termini Daegok Sosa Stations 5 ~ 8 Operation Opened 2021 (planned) Technical Line length 18.36 km (11.41 mi)
Eaglehawk–Inglewood railway line (84 words) [view diff] exact match in snippet view article find links to article
Eaglehawk - Inglewood Overview Type Branch Status Freight only line Operation Opened 1876 Technical Line length 50 kilometres Number of tracks 1
Yahiko Line (280 words) [view diff] exact match in snippet view article find links to article
Owner JR East Rolling stock 115 series/E127 series/E129 series Technical Line length 17.5 km (10.9 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Howrah–Bardhaman chord (701 words) [view diff] exact match in snippet view article find links to article
Opened 1917 Owner Indian Railway Operator(s) Eastern Railway Technical Line length 95 km (59 mi) Track gauge 1,676 mm (5 ft 6 in) Broad gauge Electrification
Line F (Buenos Aires Underground) (324 words) [view diff] exact match in snippet view article
Stations 13 Operation Opened 2020 (planned) Operator(s) Metrovías Character Underground Technical Line length 8.6km Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Toei Mita Line (1,078 words) [view diff] exact match in snippet view article find links to article
stock Toei 6300 series, Tokyu 3000 series, Tokyu 5080 series Technical Line length 26.5 km (16.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Hachikō Line (838 words) [view diff] exact match in snippet view article find links to article
209-3000 series, 209-3100 series, E233 series, KiHa 110 series Technical Line length 92.0 km (57.2 mi) Number of tracks Double-track shared with Takasaki
Ōme Line (682 words) [view diff] exact match in snippet view article find links to article
Opened 1894 Owner JR East Operator(s) JR East, JR Freight Technical Line length 37.2 km (23.1 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Noto Line (222 words) [view diff] exact match in snippet view article find links to article
Takojima Stations 30 Operation Opened 1959 Closed 2005 Operator(s) Noto Railway Technical Line length 61.0 km (37.90 mi) Track gauge 1,067 mm (3 ft 6 in)
Milan Metro Line 2 (486 words) [view diff] exact match in snippet view article find links to article
Trasporti Milanesi Rolling stock UdT (various series) AnsaldoBreda Meneghino Technical Line length 39.4 km (24.5 mi) Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Greenwich line (322 words) [view diff] exact match in snippet view article find links to article
Rail Class 376 British Rail Class 465 British Rail Class 466 Technical Line length 3.08 miles (4.95 km) Number of tracks 2 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Negishi Line (817 words) [view diff] exact match in snippet view article find links to article
Opened 1872 Owner JR East Operator(s) JR East, JR Freight Technical Line length 22.1 km (13.7 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Shinonoi Line (427 words) [view diff] exact match in snippet view article find links to article
Termini Shinonoi Shiojiri Stations 15 Operation Owner JR East Technical Line length 66.7 km (41.4 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Meitetsu Toyokawa Line (140 words) [view diff] exact match in snippet view article find links to article
Stations 5 Operation Opened 25 December 1954 Owner Meitetsu Technical Line length 7.2 km (4.5 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1,500
Tokyo Metro Namboku Line (557 words) [view diff] exact match in snippet view article find links to article
Railway 2000 series, Tokyu 3000 series, Tokyu 5080 series Technical Line length 21.3 km (13.2 mi) Track gauge 1,067 mm (3 ft 6 in) Electrification 1
Bankstown railway line (682 words) [view diff] exact match in snippet view article find links to article
February 1895 exended to Bankstown 14 April 1909 extended to Regents Park 16 July 1928 Technical Line length 17 Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Howrah–Chennai main line (1,023 words) [view diff] exact match in snippet view article find links to article
East Coast Railway, South Central Railway, Southern Railway Technical Line length 1,661 km (1,032 mi) Number of tracks 2 Track gauge 1,676 mm (5 ft 6 in)
Lumding–Dibrugarh section (478 words) [view diff] exact match in snippet view article find links to article
Owner Indian Railway Operator(s) Northeast Frontier Railway Technical Line length 376 km (234 mi) Number of tracks 1 Track gauge 1,676 mm (5 ft 6 in) broad